Downstream Flood Peak Improvement Modeling for a River System Incorporating Ungauged Subbasins

Aquatic Procedia - Tập 4 - Trang 1189-1196 - 2015
Sangita Deb Barman1, Parthasarathi Choudhury1
1NIT Silchar, Silchar, Postcode-788010, India

Tài liệu tham khảo

Choudhury, 2002, Flood Routing in river networks using equivalent Muskingum inflow, Journal of Hydrologic Engineering. ASCE., 7, 413, 10.1061/(ASCE)1084-0699(2002)7:6(413) Choudhury, 2007, Multiple inflows Muskingum routing model, Journal of Hydrologic engineering. ASCE., 12, 473, 10.1061/(ASCE)1084-0699(2007)12:5(473) Choudhury, 2012, Application of NRCS Model to Watershed Having No Landcover Data, Environmental Management and Sustainable Development, 1, 1, 10.5296/emsd.v1i2.1842 Das, 2004, Parameter estimation for Muskingum models, Journal of Irrig. Drain. Engg., 130, 140, 10.1061/(ASCE)0733-9437(2004)130:2(140) Jain, 2000, Design flood estimation using GIS supported GIUH approach, Water Resour. Manag., 14, 369, 10.1023/A:1011147623014 Khan, 1993, Muskingum flood routing model for multiple tributaries, Water Resour. Res., 29, 1057, 10.1029/92WR02850 Kumar, 2007, Runoff estimation for an ungauged catchment using geomorphological instantaneous unit hydrograph (GIUH) models, Jour. Of Hydrological Process, 21, 1829, 10.1002/hyp.6318 Mays, 1992 Nongthombam, 2011, A Geomorphological based rainfall- runoff model for ungauged watersheds, International Journal of Geomatics and Geosciences, 2, 676 O’ Donnel, 1985, A direct three parameter Muskingum procedure incorporating lateral inflow, Hydrol. Sci. J., 30, 479, 10.1080/02626668509491013 Rodriguez- Iturbe, 1979, The geomorphologic structure of hydrologic response, Water Resour. Res., 15, 1409, 10.1029/WR015i006p01409 Windsor, 1973, Optimization model for the operation of flood control system, Water Resour. Res., 9, 1219, 10.1029/WR009i005p01219 Wurbs, R.A., Tibbets, M.N., Cabezas, L.M., and Roy, L.C. 1985. State- of- the- art review and annotated bibliography of systems analysis techniques applied to reservoir operation. Tech. Rep. 136, Texas Water Resources Institute, College Station, Tex. Wurbs, 1993, Reservoir-system simulation and optimization models, Journal of Water Resour. Plann. Manage., 119, 455, 10.1061/(ASCE)0733-9496(1993)119:4(455) Yoon, 1993, Parameter estimation of linear and nonlinear Muskingum models, Jour. Water Resour. Plann. Manage., 119, 600, 10.1061/(ASCE)0733-9496(1993)119:5(600)