Dispute causation: identification of pathogenic influences in construction
Tóm tắt
Từ khóa
Tài liệu tham khảo
Blake Dawson Waldron (2006), Scope for Improvement: A Survey of Pressure Points in Australian Construction and Infrastructure Projects. A Report Prepared for the Australian Constructors Association, Blake Dawson Waldron, Sydney.
Bristow, D. and Vasilopoulos, R. (1995), “The new CCDC 2: facilitating dispute resolution of construction projects”, Construction Law Journal, Vol. 11 No. 2, pp. 95‐117.
Busby, J.S. and Hughes, E.J. (2004), “Projects, pathogens, and incubation periods”, International Journal of Project Management, Vol. 22, pp. 425‐34.
Cheung, S.O. and Yiu, T.W. (2006), “Are construction disputes inevitable?”, IEEE Transactions on Engineering Management, Vol. 53 No. 3, pp. 456‐70.
Cole, T.R. (2002), “Royal Commission into the Building and Construction Industry”, available at: www.royalcombci.gov.au/hearings/reports.asp (accessed 15 April 2008).
Colin, J., Langford, D. and Kennedy, P. (1996), “The relationship between construction procurement strategies and construction contract conflicts”, Proceedings of the CIB W‐92 Procurement Symposium, North Meets West, 14‐16 January, Durban, South Africa.
Department of Industry, Science and Tourism (1998), Building for Growth: A Draft Strategy for the Building and Construction Industry, Department of Industry, Science and Tourism, Commonwealth of Australia Publication, Canberra.
DeSai, D.B. (1997), “DRBs in design and build”, Foundation Forum, Vol. 1 No. 3, p. 1.
Diekmann, J.E., Girard, M.J. and Abdul‐Hadi, N. (1994), Dispute Potential Index: A Study into the Predictability of Contract Disputes, Construction Industry Institute, Boulder, CO.
Heath, B., Hills, B. and Berry, M. (1994), The Origin of Conflict within the Construction Process, CIB Publication 171, First Plenary Meeting of TG‐15, The Netherlands.
Hewitt, J. (1991), Winning Construction Disputes: Strategic Planning for Major Litigation, Ernst and Young, London.
Killian, J. (2003), “A forensic analysis of construction litigation, US Naval Facilities Engineering Command”, unpublished Master's thesis, Texas University at Austin, Austin, TX.
Krippendorf, K. (1980), Content Analysis: An Introduction to its Methodology, Sage Publications, Newbury Park, CA.
Kumaraswamy, M. (1997), “Conflicts, claims and disputes”, Engineering, Construction and Architectural Management, Vol. 4 No. 2, pp. 95‐111.
Kvale, S. (1996), Interviews: An Introduction to Qualitative Research Interviewing, Sage Publications, Thousand Oaks, CA.
Love, P.E.D. (2002), “Influence of project type and procurement method on rework costs in building construction projects”, ASCE Journal of Construction Engineering and Management, Vol. 128 No. 1, pp. 18‐29.
Love, P.E.D., Edwards, D. and Smith, J. (2006), “Contract documentation quality and rework in Australian projects”, Journal of Architectural Engineering and Design Management, Vol. 1, pp. 247‐59.
Love, P.E.D., Edwards, D. and Wood, E. (2010), “Loosening the Gordian knot: the role of emotional intelligence in construction”, Engineering, Construction and Architectural Management, forthcoming.
Love, P.E.D., Irani, Z. and Edwards, D. (2003), “Learning to reduce rework in projects: Analysis of firms learning and quality practices”, Project Management Journal, Vol. 34 No. 3, pp. 13‐25.
Love, P.E.D., Edwards, D.J., Irani, Z. and Walker, D.H.T. (2009a), “Project pathogens: The anatomy of omission errors in construction and engineering projects”, IEEE Transactions on Engineering Management, Vol. 56 No. 3, pp. 425‐35.
Love, P.E.D., Edwards, D.J., Smith, J. and Walker, D.H.T. (2009b), “Congruence or divergence? A path model of rework in building and civil engineering projects”, ASCE Journal of Performance of Constructed Facilities, Vol. 23 No. 6, pp. 480‐8.
Michel, H.L. (1998), “The next 25 years: the future of the construction industry”, ASCE Journal of Management in Engineering, Vol. 14 No. 5, pp. 26‐31.
Mitropoulos, P. and Howell, G. (2001), “Model for understanding preventing and resolving project disputes”, ASCE Journal of Construction, Engineering and Management, Vol. 127 No. 3, pp. 223‐31.
National Public Works Conference and National Building Construction Council (1990), No Dispute – Strategies for Improvement in the Australian Building and Construction Industry. A Report by the National Public Works Conference and National Building and Construction Council Joint Working Party, May, Canberra.
Patton, M.Q. (2002), Qualitative Research & Evaluation Methods, 3rd ed., Sage Publications, Thousand Oaks, CA.
Reason, J. (2000), “Human error: models and management”, British Medical Journal, Vol. 320, pp. 768‐70.
Reid, A. and Ellis, R. (2007), “Common sense applied to the definition of a dispute”, Structural Survey, Vol. 25 No. 3, pp. 239‐52.
Rhys‐Jones, S. (1994), “How constructive is construction law?”, Construction Law Journal, Vol. 10 No. 1, pp. 28‐38.
Semple, C., Hartman, F. and Jergeas, G. (1994), “Construction claims and disputes: causes and cost/time overruns”, ASCE Journal of Construction, Engineering and Management, Vol. 120 No. 4, pp. 785‐95.
Silverman, D. (2001), Interpreting Qualitative Data, Sage Publications, London.
Stewart, D.W. and Shamdasani, P.N. (1990), Focus Groups: Theory and Practice, Sage Publications, London.
Stipanowich, T.J. (2004), “ADR and the vanishing trial: the growth and impact of alternative dispute resolution”, Construction Lawyer, Vol. 15 No. 4, pp. 5‐12.
Sykes, J. (1996), “Claims and disputes in construction”, Construction Law Journal, Vol. 12 No. 1, pp. 3‐13.
Watts, V.M. and Scrivener, J.C. (1992), “Review of Australian building disputes settled by litigation”, in Fenn, P. and Gameson, R. (Eds), Construction Conflict Management and Resolution, E & FN Spon, London, pp. 209‐18.
Yiu, K.T.W. and Cheung, S.O. (2007), “Behavioral transition: a framework for construction conflict‐tension relationships”, IEEE Transactions on Engineering Management, Vol. 54 No. 3, pp. 498‐505.