Dimensioning windows for railway infrastructure maintenance: Cost efficiency versus traffic impact

Tomas Lidén1, Martin Joborn1
1Linköping University, Department of Science and Technology, Norrköping SE-601 74, Sweden

Tài liệu tham khảo

Albrecht, 2013, Rescheduling rail networks with maintenance disruptions using problem space search, Comput. Operations Res., 40, 703, 10.1016/j.cor.2010.09.001 ASEK, 2015 Banverket, 2009 Ben-Daya, 2016 Boland, 2013, Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain, J. Sched., 16, 649, 10.1007/s10951-012-0284-y Borraz-Sánchez, 2012 Budai, 2006, Scheduling preventive railway maintenance activities, J. Operational Res. Soc., 57, 1035, 10.1057/palgrave.jors.2602085 Chen, 2013, Maintenance schedule optimisation for a railway power supply system, Int. J. Prod. Res., 51, 4896, 10.1080/00207543.2013.774501 Chen, 2014, A bi-objective maintenance scheduling for power feeding substations in electrified railways, Transp. Res. Part C Emerg. Technol., 44, 350, 10.1016/j.trc.2014.04.016 Dekker, 1996, Applications of maintenance optimization models: a review and analysis, Reliab. Eng. Syst. Saf., 51, 229, 10.1016/0951-8320(95)00076-3 Durango-Cohen, 2008, Optimization of inspection and maintenance decisions for infrastructure facilities under performance model uncertainty: a quasi-Bayes approach, Transp. Res. Part A Policy Pract., 42, 1074, 10.1016/j.tra.2008.03.004 EIM-EFRTC-CER Working Group,., Oct, 2012 Eliasson, 2014, On timetable assumptions in railway investment appraisal, Transp. Policy, 36, 118, 10.1016/j.tranpol.2014.08.008 Forsgren, 2013, Maintaining tracks and traffic flow at the same time, J. Rail Transp. Plan. Manag., 3, 111 Gustavsson, 2014, Preventive maintenance scheduling of multi-component systems with interval costs, Comput. Industrial Eng., 10.1016/j.cie.2014.02.009 Higgins, 1998, Scheduling of railway track maintenance activities and crews, J. Operational Res. Soc., 49, 1026, 10.1057/palgrave.jors.2600612 Lidén, 2015, Railway infrastructure maintenance - a survey of planning problems and conducted research Lidén, 2015 Liu, 2014, Optimization of ultrasonic rail-defect inspection for improving railway transportation safety and efficiency, J. Transp. Eng., 1014 Lyngby, 2008, RAMS management of railway tracks, 1123 Murali, 2010, A delay estimation technique for single and double-track railroads, Transp. Res. Part E Logist. Transp. Rev., 46, 483, 10.1016/j.tre.2009.04.016 Peng, 2012, Track maintenance production team scheduling in railroad networks, Transp. Res. Part B Methodol., 46, 1474, 10.1016/j.trb.2012.07.004 RailNetEurope, 2013 Savelsbergh, 2014, Possession assessment and capacity evaluation of the central Queensland coal network, EURO J. Transp. Logist., 1 van Zante–de Fokkert, 2007, The Netherlands schedules track maintenance to improve track workers' safety, Interfaces, 37, 133, 10.1287/inte.1060.0246 Zhao, 2006, Optimizing policies of railway ballast tamping and renewal, Transp. Res. Rec. J. Transp. Res. Board, 1943, 50, 10.3141/1943-07