Design patterns for real-time distributed control system benchmarking

Robotics and Computer-Integrated Manufacturing - Tập 24 - Trang 606-615 - 2008
Karthik Soundararajan1, Robert W. Brennan1
1Schulich School of Engineering, University of Calgary, 2500 University Dr. N.W. Calgary, Alta., Canada T2N 1N4

Tài liệu tham khảo

Shen, 2001 McFarlane, 2000, Developments in holonic production planning and control, Production Planning and Control, 11, 522, 10.1080/095372800414089 Intelligent Manufacturing Systems. Network of excellence in intelligent manufacturing; 2004 〈http://www.ims.org/projects/outline/noe.html〉. Loomis D. The TINI specification and developer's guide. Pearson, 2001. Kelton, 1998 Brennan, 2007, Towards real-time distributed intelligent control: a survey of research themes and applications, IEEE Trans Syst Man Cybern, 37, 744, 10.1109/TSMCC.2007.900670 IEC TC65/WG6 Voting Draft. Publicly available specification—function blocks for industrial process-measurement and control systems, part I, part II and part III. International Electrotechnical Commission, 2000. Shen, 2006, Agent-based distributed manufacturing process planning and scheduling: a state-of-the-art survey, IEEE Trans Syst Man Cybern, 36, 563, 10.1109/TSMCC.2006.874022 Brennan, 2004, Performance analysis of a multi-agent scheduling and control system for manufacturing, Prod Plann Control, 15, 225, 10.1080/09537280410001662501 Cavalieri, 2000, An experimental benchmarking of two multi-agent architectures for production scheduling and control, Comput Ind, 43, 139, 10.1016/S0166-3615(00)00063-4 Holobloc. Website 〈http://www.holobloc.com〉; 2006. Soundararajan K, Brennan RW. A proxy design pattern to support real-time distributed control system benchmarking. In: Proceedings of the 2nd international conference on applications of holonic and multi-agent systems, Copenhagen, Denmark, August 22–24, 2005. Gamma, 1995 Douglass, 2003 Olsen, 2004, Contingencies-based reconfiguration of holonic control devices, 45 Douglass, 1999