Debottlenecking of heat exchanger networks

Heat Recovery Systems and CHP - Tập 10 - Trang 369-385 - 1990
S. Ahmad1, G.T. Polley1
1Centre for Process Integration, Department of Chemical Engineering, University of Manchester Institute of Science and Technology, Manchester, M60 1QD, U.K.

Tài liệu tham khảo

Tjoe, 1986, Using pinch technology for process retrofit, Chem. Engng, 93, 47 Tjoe, 1987, Achieving the best energy saving retrofits Jegede, 1990, Power, capital and energy cost tradeoffs in heat exchanger networks Linnhoff, 1982, User guide on process integration for the efficient use of energy Townsend, 1984, Surface area targets for heat exchanger networks Tjoe, 1986, Retrofit of heat exchanger networks Silangwa, 1986, Evaluation of various surface area efficiency criteria in heat exchanger network retrofits Kern, 1950 Challand, 1981, Computerised heat exchanger networks, Chem. Engng Prog., 77, 65 Linnhoff March Ltd, Tabley Court, Moss Lane, Over Tabley, Knutsford, Cheshire, U.K., private communication (1989). Ahmad, 1985, Heat exchanger networks: cost tradeoffs in energy and capital Kotjabasakis, 1986, Sensitivity tables for the design of flexible processes (1)—how much contingency in heat exchanger is cost-effective?, Chem. Eng. Res. Des., 64, 197 Panjeh-Shahi, 1988, Development of heat exchanger network retrofit targeting procedures