Ageev, A. A. (2018). Inapproximately lower bounds for open shop problems with exact delays. Approximation and online algorithms (pp. 45–55). New York: Springer.
Ageev, A. A., & Baburin, A. E. (2007). Approximation algorithms for UET scheduling problems with exact delays. Operations Research Letters, 35(4), 533–540.
Ageev, A. A., & Kononov, A. V. (2007). Approximation algorithms for scheduling problems with exact delays. Approximation and online algorithms. Berlin: Springer.
Ahr, D., Békési, J., Galambos, G., Oswald, M., & Reinelt, G. (2004). An exact algorithm for scheduling identical coupled tasks. Mathematical Methods of Operations Research, 59(2), 193–203.
Azadeh, A., Farahani, M. H., Torabzadeh, S., & Baghersad, M. (2014). Scheduling prioritized patients in emergency department laboratories. Computer Methods and Programs in Biomedicine, 117(2), 61–70.
Baptiste, P. (2010). A note on scheduling identical coupled tasks in logarithmic time. Discrete Applied Mathematics, 158(5), 583–587.
Békési, J., Galambos, G., Jung, M. N., Oswald, M., & Reinelt, G. (2014). A branch-and-bound algorithm for the coupled task problem. Mathematical Methods of Operations Research, 80(1), 47–81.
Bessy, S., & Giroudeau, R. (2019). Parameterized complexity of a coupled-task scheduling problem. Journal of Scheduling, 22(3), 305–313.
Blazewicz, J., Ecker, K., Kis, T., Potts, C. N., Tanas, M., & Whitehead, J. (2010). Scheduling of coupled tasks with unit processing times. Journal of Scheduling, 13(5), 453–461.
Cheng, T. C. E., Ding, Q., & Lin, B. M. T. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152, 1–13.
Condotta, A., & Shakhlevich, N. (2012). Scheduling coupled-operation jobs with exact time-lags. Discrete Applied Mathematics, 160(16), 2370–2388.
Condotta, A., & Shakhlevich, N. (2014). Scheduling patient appointments via multilevel template: a case study in chemotherapy. Operations Research for Health Care, 3(3), 129–144.
Gawiejnowicz, S. (2008). Time-dependent scheduling. New York: Springer.
Graham, R., Lawler, E., Lenstra, J., & Kan, A. R. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287–326.
Gupta, J. N. D., & Gupta, S. K. (1988). Single facility scheduling with nonlinear processing times. Computers and Industrial Engineering, 14(4), 387–393.
Gurobi Optimization, L. (2018). Gurobi Optimizer Reference Manual.
Hwang, F. J., & Lin, B. M. T. (2011). Coupled-task scheduling on a single machine subject to a fixed-job-sequence. Computers and Industrial Engineering, 60(4), 690–698.
Khatami, M. and Salehipour, A. (2020). A binary search algorithm for the general coupled task scheduling problem. 4OR, 1–19.
Khatami, M., Salehipour, A., & Cheng, T. C. E. (2020). Coupled task scheduling with exact delays: literature review and models. European Journal of Operational Research, 282(1), 19–39.
Kunnathur, A. S., & Gupta, S. K. (1990). Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem. European Journal of Operational Research, 47(1), 56–64.
Legrain, A., Fortin, M.-A., Lahrichi, N., Rousseau, L.-M., & Widmer, M. (2015). Stochastic optimization of the scheduling of a radiotherapy center. Journal of Physics: Conference Series. Vol. 616. 1. IOP Publishing, 012008.
Lehoux-Lebacque, V., Brauner, N., & Finke, G. (2015). Identical coupled task scheduling: polynomial complexity of the cyclic case. Journal of Scheduling, 18(6), 631–644.
Leung, J. Y.-T., Li, H., & Zhao, H. (2007). Scheduling two-machine flow shops with exact delays. International Journal of Foundations of Computer Science, 18(02), 341–359.
Li, H., & Zhao, H. (2007). Scheduling Coupled-Tasks on a Single Machine. IEEE Symposium on Computational Intelligence in Scheduling, 137–142.
Liu, Z., Lu, J., Liu, Z., Liao, G., Zhang, H. H., & Dong, J. (2019). Patient scheduling in hemodialysis service. Journal of Combinatorial Optimization, 37(1), 337–362.
Marinagi, C. C., Spyropoulos, C. D., Papatheodorou, C., & Kokkotos, S. (2000). Continual planning and scheduling for managing patient tests in hospital laboratories. Artificial Intelligence in Medicine, 20(2), 139–154.
Mosheiov, G. (1994). Scheduling jobs under simple linear deterioration. Computers and Operations Re-search, 21(6), 653–659.
Orman, A., & Potts, C. (1997). On the complexity of coupled-task scheduling. Discrete Applied Mathematics, 72(1), 141–154.
Pérez, E., Ntaimo, L., Malavé, C. O., Bailey, C., & McCormack, P. (2013). Stochastic online appointment scheduling of multi-step sequential procedures in nuclear medicine. Health Care Management Science, 16(4), 281–299.
Pérez, E., Ntaimo, L., Wilhelm, W. E., Bailey, C., & McCormack, P. (2011). Patient and resource scheduling of multi-step medical procedures in nuclear medicine. IIE Transactions on Healthcare Systems Engineering, 1(3), 168–184.
Shapiro, R. D. (1980). Scheduling coupled tasks. Naval Research Logistics Quarterly, 27(3), 489–498.
Sherali, H. D., & Smith, J. C. (2005). Interleaving two-phased jobs on a single machine. Discrete Optimization, 2(4), 348–361.
Simonin, G., Darties, B., Giroudeau, R., & König, J.-C. (2011). Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor. Journal of Scheduling, 14(5), 501–509.
Yu, W., Hoogeveen, H., & Lenstra, J. K. (2004). Minimizing make span in a two-machine flow shop with delays and unit-time operations is NP-hard. Journal of Scheduling, 7(5), 333–348.