Comparative analysis of risk-aversion and strategic investment behavior in generation expansion
Tài liệu tham khảo
Kaminski, 2021, Impact of capacity mechanisms and demand elasticity on generation adequacy with risk-averse generation companies, Electr. Power Syst. Res., 199, 107369, 10.1016/j.epsr.2021.107369
de Vries, 2004
Neuhoff, 2004, Insufficient incentives for investment in electricity generations, Util. Policy, 12, 253, 10.1016/j.jup.2004.06.002
Schiro, 2016, Perfectly competitive capacity expansion games with risk-averse participants, Comput. Optim. Appl., 65, 511, 10.1007/s10589-015-9798-5
Elia, Final report on Elia’s findings regarding the design of a scarcity pricing mechanism for implementation in Belgium(2020).
Entsoe, 2020, Methodology for European Resource Adequacy Assessment
ACER, 2020, ACER Decision on the ERAA methodology: Annex I
Elia, 2019, CRM Design Note: Auction Process
Harbord, 2014, Britain’s electricity capacity auctions: lessons from Colombia and New England
Independent Market Monitor for PJM v. PJM Interconnection, LLC, Docket No. EL19-47-000, 2021, 10.1016/S0140-6736(00)82769-5.
Ehrenmann, 2011, Generation capacity expansion in a risky environment: a stochastic equilibrium analysis, Oper. Res., 59, 1332, 10.1287/opre.1110.0992
Petitet, 2017, Capacity adequacy in power markets facing energy transition: a comparison of scarcity pricing and capacity mechanism, Energy Policy, 103, 30, 10.1016/j.enpol.2016.12.032
Höschle, 2018, An ADMM-based method for computing risk-averse equilibrium in capacity markets, IEEE Trans. Power Syst., 10.1109/TPWRS.2018.2807738
Mays, 2019, Asymmetric risk and fuel neutrality in electricity capacity markets, Nat. Energy, 4, 948, 10.1038/s41560-019-0476-1
Wang, 2009, Strategic generation capacity expansion planning with incomplete information, IEEE Trans. Power Syst., 24, 1002, 10.1109/TPWRS.2009.2017435
Valinejad, 2017, Generation expansion planning in electricity market considering uncertainty in load demand and presence of strategic GENCOs, Electr. Power Syst. Res., 152, 92, 10.1016/j.epsr.2017.07.004
Kazempour, 2013, Generation investment equilibria with strategic producers-Part I: formulation, IEEE Trans. Power Syst., 28, 2613, 10.1109/TPWRS.2012.2235467
Schwenen, 2014, Market design and supply security in imperfect power markets, Energy Econ., 43, 256, 10.1016/j.eneco.2014.02.012
Léautier, 2016, The visible hand: ensuring optimal investment in electric power generation, Energy J., 37, 89
Fabra, 2018, A primer on capacity mechanisms, Energy Econ., 75, 323, 10.1016/j.eneco.2018.08.003
Teirilä, 2017, Market Power in the Capacity Market? The Case of Ireland
Philpott, 2016, Equilibrium, uncertainty and risk in hydro-thermal electricity systems, Math. Program., 157, 483, 10.1007/s10107-015-0972-4
Fushuan Wen, 2001, Optimal bidding strategies and modeling of imperfect information among competitive generators, IEEE Trans. Power Syst., 16, 10.1109/59.910776
Ralph, 2015, Risk trading and endogenous probabilities in investment equilibria, SIAM J. Optim., 25, 2589, 10.1137/110851778
Newbery, 2016, Missing money and missing markets: reliability, capacity auctions and interconnectors, Energy Policy, 94, 401, 10.1016/j.enpol.2015.10.028
European Commission, 2020, State aid SA.54915 (2019/N) - Capacity remuneration mechanism, Off. J. Eur. Union, 27
Rockafellar, 2000, Optimization of conditional value-at-risk, J. Risk, 2, 21, 10.21314/JOR.2000.038
Dolanyi, 2021, Exposing the variety of equilibria in oligopolistic electricity markets, CAOR
Guo, 2020, Modeling strategic behaviors of renewable energy with joint consideration on energy and tradable green certificate markets, IEEE Trans. Power Syst., 35, 1898, 10.1109/TPWRS.2019.2953114
Fortuny-Amat, 1981, A representation and economic interpretation of a two-level programming problem, J. Oper. Res. Soc., 32, 783, 10.1057/jors.1981.156
Poncelet, 2017, Selecting representative days for capturing the implications of integrating intermittent renewables in generation expansion planning problems, IEEE Trans. Power Syst., 32, 1936, 10.1109/TPWRS.2016.2596803