Building information modeling and discrete event simulation: Towards an integrated framework

Automation in Construction - Tập 44 - Trang 73-83 - 2014
Weizhuo Lu1, Thomas Olofsson1
1Construction Engineering and Management, Department of Civil, Environmental and Natural Resources Engineering, Luleå University of Technology, 97187 Luleå, Sweden

Tài liệu tham khảo

Vrijhoef, 2000, The four roles of supply chain management in construction, Eur. J. Purch. Supply Manag., 6, 169, 10.1016/S0969-7012(00)00013-7 Segerstedt, 2010, Supply chains in the construction industry, Supply Chain Manag. Int. J., 15, 347, 10.1108/13598541011068260 Hajjar, 2002, Unified modeling methodology for construction simulation, J. Constr. Eng. Manag., 128, 174, 10.1061/(ASCE)0733-9364(2002)128:2(174) AbouRizk, 2010, Role of simulation in construction engineering and management, J. Constr. Eng. Manag., 136, 1140, 10.1061/(ASCE)CO.1943-7862.0000220 Skoogh, 2008, A methodology for input data management in discrete event simulation projects, 1727 Huang, 2011, From data to simulation models: component-based model generation with a data-driven approach, 3719 Konig, 2012, Intelligent BIM-based construction scheduling using discrete event simulation Steinhauer, 2008, Development and applications of simulation tools for one-of-a-kind production processes Jongeling, 2008, Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models, Autom. Constr., 17, 780, 10.1016/j.autcon.2008.02.006 Azhar, 2008, Building information modeling (BIM): benefits, risks and challenges, 627 Ernstrom, 2006 Xu, 2003, Integrated three-dimensional computer-aided design and discrete-event simulation models, Can. J. Civ. Eng., 30, 449, 10.1139/l02-110 Mayer, 1992 Banks, 2000 Halpin, 1992 AbouRizk, 2011, Research in modeling and simulation for improving construction engineering operations, J. Constr. Eng. Manag., 137, 843, 10.1061/(ASCE)CO.1943-7862.0000288 Martinez, 1994, General purpose simulation with Stroboscope, 1159 Chua, 2002, RISim: resource-interacted simulation modeling in construction, J. Constr. Eng. Manag., 128, 195, 10.1061/(ASCE)0733-9364(2002)128:3(195) Lu, 2003, Simplified discrete-event simulation approach for construction simulation, J. Constr. Eng. Manag., 129, 537, 10.1061/(ASCE)0733-9364(2003)129:5(537) Kim, 2003, Interactive simulation modeling for heavy construction operations, Autom. Constr., 12, 97, 10.1016/S0926-5805(02)00048-1 Oloufa, 1998, Resource-based simulation libraries for construction, Autom. Constr., 7, 315, 10.1016/S0926-5805(98)00048-X Perera, 2000, Methodology for rapid identification and collection of input data in the simulation of manufacturing systems, Simul. Pract. Theory, 7, 645, 10.1016/S0928-4869(99)00020-8 Gallaher, 2004 Robertson, 2002, Automated data collection for simulation?, Simul. Pract. Theory, 9, 349, 10.1016/S0928-4869(01)00055-6 Randell, 2011, Database driven factory simulation: a proof-of-concept demonstrator, 977 McLean, 2002, An architecture for a generic data-driven machine shop simulator, 1108 Jeong, 2009, IDEF method-based simulation model design and development framework, J. Ind. Eng. Manag., 2, 337 Hanna, 2002, Quantitative definition of projects impacted by change orders, J. Constr. Eng. Manag., 128, 57, 10.1061/(ASCE)0733-9364(2002)128:1(57) Pena-Mora, 2001, Dynamic planning for fast-tracking building construction projects, J. Constr. Eng. Manag., 127, 445, 10.1061/(ASCE)0733-9364(2001)127:6(445) Love, 2002, Using systems dynamics to better understand change and rework in construction project management systems, Int. J. Proj. Manag., 20, 425, 10.1016/S0263-7863(01)00039-4 Isaac, 2013, A graph-based model for the identification of the impact of design changes, Autom. Constr., 31, 31, 10.1016/j.autcon.2012.11.043 Lee, 2009, Development of automated change order impact detection and quantification system, Autom. Constr., 18, 525, 10.1016/j.autcon.2009.03.002 Olofsson, 2008, Editorial—case studies of BIM in use, J. Inf. Technol. Constr., 244 Jongeling, 2005, nD modelling in the development of cast in place concrete structures, J. Inf. Technol. Constr., 27 Kunz, 2009, Virtual design and construction: themes, case studies and implementation suggestions Li, 2008, Integrating design and construction through virtual prototyping, Autom. Constr., 17, 915, 10.1016/j.autcon.2008.02.016 Fırat, 2008 Mahalingam, 2010, An evaluation of the applicability of 4D CAD on construction projects, Autom. Constr., 19, 148, 10.1016/j.autcon.2009.11.015 Goedert, 2008, Integrating construction process documentation into building information modeling, J. Constr. Eng. Manag., 134, 509, 10.1061/(ASCE)0733-9364(2008)134:7(509) Eastman, 2008 Hu, 2011, BIM and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials, Autom. Constr., 20, 167, 10.1016/j.autcon.2010.09.014 Mallasi, 2002, Registering space requirements of construction operations using site-PECASO model, 83 Jongeling, 2005, Modelling and simulation of cast in place concrete constructions using N-dimensions H. Norberg, P. Wallström, T. Olofsson, A. Segerstedt, V. Tarandi, L. Isaksson and N. Outters, Byggsynkronisering, Research Report 2009, ISBN: 9789174390070, Luleå Technical University. Peterson, 2011, Teaching construction project management with BIM support: experience and lessons learned, Autom. Constr., 20, 115, 10.1016/j.autcon.2010.09.009 Irizarry, 2013, Integrating BIM and GIS to improve the visual monitoring of construction supply chain management, Autom. Constr., 31, 241, 10.1016/j.autcon.2012.12.005 Kala, 2010, Case study of using an integrated 5D system in a large hospital construction project Hee, 2008, Development of 5D-CAD based work process model for aged-housing revamp projects Panushev, 2006, A framework for delivery of integrated building information modeling, 2814 Sacks, 2010, Requirements for building information modeling based lean production management systems for construction, Autom. Constr., 19, 641, 10.1016/j.autcon.2010.02.010 Jongeling, 2007, A method for planning of work-flow by combined use of location-based scheduling and 4D CAD, Autom. Constr., 16, 189, 10.1016/j.autcon.2006.04.001 Ospina, 2010, Interaction of processes and phases in project scheduling using BIM for A/E/C/FM integration, 939 Harrington, 2002 Darwiche, 1988, OARPLAN: generating project plans by reasoning about objects, actions and resources, AI EDAM, 2, 169 Mourgues, 2012, Method to produce field instructions from product and process models for cast-in-place concrete operations, Autom. Constr., 22, 233, 10.1016/j.autcon.2011.07.007 Fischer, 1999, Cost-loaded production model for planning and control, Conf. on Durability of Building Materials and Components, CIB W78, 2813 Shen, 2010, Quantitative evaluation of the BIM-assisted construction detailed cost estimates, J. Inf. Technol. Constr., 15, 234 Sturrock, 2011, Recent innovations in Simio, 52 Wikells Byggberäkningar, 2012 Levy, 2006 Marcel, 2013, Descriptive construction methods through BIM-based collaboration Lee, 2009, Integrating construction operation and context in large-scale construction using hybrid computer simulation, J. Comput. Civ. Eng., 23, 75, 10.1061/(ASCE)0887-3801(2009)23:2(75)