Bond behavior and assessment of design ultimate bond stress of normal and high strength concrete

Alexandria Engineering Journal - Tập 53 - Trang 355-371 - 2014
Ahmed M. Diab1, Hafez E. Elyamany1, Mostafa A. Hussein1, Hazem M. Al Ashy1
1Structural Engineering Department, Alexandria University, Egypt

Tài liệu tham khảo

Orangun, 1977, A re-evaluation of test data on development length and splices, ACI J., 74, 114 Al-Negheimish, 2004, Effect of manufacturing process and rusting on the bond behavior of deformed bars in concrete, Cem. Concr. Compos., 26, 735, 10.1016/S0958-9465(03)00062-3 Ahmed, 2008, Effect of rebar cover and development length on bond and slip in high strength concrete, Pakistan J. Eng. Appl. Sci., 2 Robert, 1975 Zhao, 2013, Bond behaviour of normal/recycled concrete and corroded steel bars, Constr. Build. Mater., 48, 348, 10.1016/j.conbuildmat.2013.06.091 RILEM, 1970, Essai portant sur l’adhérence des armatures de béton – Essai par traction, Matér. Constr., 3, 175 R.P. Tastani, S.J. Pantazopulou, Experimental evaluation of the direct tension-pullout bond test. Bond in concrete – from research to standards, Budapest, 2002. Hamad, 1995, Bond strength improvement of reinforcing bars with specially designed rib geometries, ACI Struct. J., 92, 3 Castel, 2006, Effect of reinforcing bar orientation and location on bond with self-consolidating concrete, ACI Struct. J., 103, 559 C. La Borderie, G. Pijaudier-Cabot, Influence of the state of stress in concrete on the behavior of the steel concrete interface, in: Concrete fracture mechanics of structures, Colorado, USA, 1992. Malvar, 1992, Bond of reinforcement under controlled confinement, ACI Mater. J., 89, 593 Torre-Casanova, 2013, Confinement effects on the steel–concrete bond strength and pull-out failure, Eng. Fract. Mech., 97, 92, 10.1016/j.engfracmech.2012.10.013 Joseph, 2012, Bond strength of epoxy-coated bars in underwater concrete, Constr. Build. Mater., 30, 667, 10.1016/j.conbuildmat.2011.12.047 ACI Committee 408R-03, 2003 De Anda, 2006, Bond strength of prefabricated epoxy-coated reinforcement, ACI Struct. J., 103, 226 Choi, 1991, Bond of epoxy-coated reinforcement: bar parameter, ACI Mater. J., 207 ACI Committee 318-08, 2008 AASHTO, 1989 Zsutty, 1985, Empirical study for bar development behavior, J. Struct. Eng. ASCE, 111, 205, 10.1061/(ASCE)0733-9445(1985)111:1(205) Darwin, 1992, Development length criteria; bars not confined by transverse reinforcement, ACI J., 89, 709 Zuo, 2000, Splice strength of conventional and high relative rib area bars in normal and high strength concrete, ACI Struct. J., 97, 630 Hadi, 2008, Bond of high strength concrete with high strength reinforcing steel, Open Civ. Eng. J., 2143 Kazim Turk, Bond strength of reinforcement in splices in beams. Structural Engineering and Mechanics No. 4, 2003. Alavi-Fard, 2004, Bond of high strength concrete under monotonic pullout loading, Mag. Concr. Res., 56, 545, 10.1680/macr.2004.56.9.545 Ahmed, 2007, Slippage of steel in high and normal strength concrete, Pakistan J. Eng. Appl. Sci., 1, 31 Esfahani, 1998, Bond between normal strength and high-strength concrete (HSC) and reinforcing bars in splices in beams, ACI Struct. J., 95, 272 Idun, 1999, Bond of epoxy-coated reinforcement: coefficient of friction and rib face angle, ACI Struct. J., 96, 609 Darwin, 1993, Effect of Deformation Height and Spacing on Bond Strength of Reinforcing Bars, ACI Struct. J., 90, 646 BS 8110-1: 1997, Part 1: Code of Practice for Design and Construction, 2002, pp. 89–90. EN 1992-1-1, Eurocode 2: Design of Concrete Structures – Part 1-1: General Rules and Rules for Buildings, 2004.