Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus
Tài liệu tham khảo
IEA, 2009
Dai, 2013, Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm, Robot. Comput.-Integr. Manuf., 29, 418, 10.1016/j.rcim.2013.04.001
Liu, 2014, An investigation into minimising total energy consumption and total weighted tardiness in job shops, J. Clean. Prod., 65, 87, 10.1016/j.jclepro.2013.07.060
Wang, 2018, Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan, J. Clean. Prod., 193, 424, 10.1016/j.jclepro.2018.05.056
GCP, 2016
Zhou, 2018, A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost, Comput. Oper. Res., 96, 55, 10.1016/j.cor.2018.04.009
Fang, 2011, A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction, J. Manuf. Syst., 30, 234, 10.1016/j.jmsy.2011.08.004
Yu, 2010, Green scheduling and its solution, Adv. Mater. Res., 139–141, 1415, 10.4028/www.scientific.net/AMR.139-141.1415
Yin, 2017, Energy-efficient job shop scheduling problem with variable spindle speed using a novel multi-objective algorithm, Adv. Mech. Eng., 9, 1, 10.1177/1687814017695959
Mouzon, 2007, Operational methods for minimization of energy consumption of manufacturing equipment, Int. J. Prod. Res., 45, 4247, 10.1080/00207540701450013
Liu, 2010, Seru seisan-an innovation of the production management mode in Japan, Asian J. Technol. Innov., 18, 89, 10.1080/19761597.2010.9668694
Stecke, 2012, Seru: the organizational extension of JIT for a super-talent factory, Int. J. Strateg. Decis. Sci., 3, 106, 10.4018/jsds.2012010104
Liu, 2021, Optimal cross-trained worker assignment for a hybrid seru production system to minimize makespan and workload imblance, Comput. Ind. Eng., 160, 10.1016/j.cie.2021.107552
Zhang, 2017, Effects of key enabling technologies for seru production on sustainable performance, Omega, 66, 290, 10.1016/j.omega.2016.01.013
Liu, 2014, An implementation framework for seru production, Int. Trans. Oper. Res., 21, 1, 10.1111/itor.12014
Yu, 2015, Comparison of two typical scheduling rules of line-seru conversion problem, Asian J. Manage. Sci. Appl., 2, 154
Yu, 2016, Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization, SpringerPlus, 5, 1, 10.1186/s40064-016-2445-5
Sun, 2016, Formulations, features of solution space, and algorithms for line-pure seru system conversion, Math. Probl. Eng., 2016, 10.1155/2016/9748378
Yu, 2017, Line-seru conversion towards reducing worker(s) without increasing makespan: Models, exact and meta-heuristic solutions, Int. J. Prod. Res., 55, 2990, 10.1080/00207543.2017.1284359
Yu, 2017, Line-hybrid seru system conversion: Models, complexities, properties, solutions and insights, Comput. Ind. Eng., 103, 282, 10.1016/j.cie.2016.11.035
Wang, 2018, Cost and service-level-based model for a seru production system formation problem with uncertain demand, J. Syst. Sci. Syst. Eng., 27, 519, 10.1007/s11518-018-5379-3
Sun, 2019, A cooperative coevolution algorithm for the seru production with minimizing makespan, IEEE Access, 7, 5662, 10.1109/ACCESS.2018.2889372
Yılmaz, 2020, Operational strategies for seru production system: a bi-objective optimisation model and solution methods, Int. J. Prod. Res., 58, 3195, 10.1080/00207543.2019.1669841
Yılmaz, 2020, Attaining flexibility in seru production system by means of shojinka: an optimization model and solution approaches, Comput. Oper. Res., 119, 10.1016/j.cor.2020.104917
Liu, 2022, Solving the rotating seru production problem with dynamic multi-objective evolutionary algorithms, J. Manage. Sci. Eng., 7, 48
Gai, 2022, Minimizing makespan of a production batch within concurrent systems: Seru production perspective, J. Manage. Sci. Eng., 7, 1
Lian, 2022, Task dispatching in reconfigurable seru production systems to minimize total earliness and tardiness, Eur. J. Ind. Eng., 16, 241, 10.1504/EJIE.2022.121959
Ding, 2016, Parallel machine scheduling under time-of-use electricity prices: New models and optimization approaches, IEEE Trans. Autom. Sci. Eng., 13, 1138, 10.1109/TASE.2015.2495328
Cheng, 2018, An improved model for parallel machine scheduling under time-of-use electricity price, IEEE Trans. Autom. Sci. Eng., 15, 896, 10.1109/TASE.2016.2631491
Liu, 2018, Scheduling two interfering job sets on parallel machines under peak power constraint, Prod. Eng., 12, 611, 10.1007/s11740-018-0840-1
Che, 2017, Energy-conscious unrelated prallel machine scheduling under time-of-use electricity tariffs, J. Clean. Prod., 156, 688, 10.1016/j.jclepro.2017.04.018
Zeng, 2018, Bi-objective scheduling on uniform parallel machines considering electricity cost, Eng. Optim., 50, 19, 10.1080/0305215X.2017.1296437
Zheng, 2018, A collaborative multiobjective fruit fly optimization algorithm for the resource constrained unrelated parallel machine green scheduling problem, IEEE Trans. Syst. Man, Cybern.: Syst., 48, 790, 10.1109/TSMC.2016.2616347
Abikarram, 2019, Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing, J. Clean. Prod., 208, 232, 10.1016/j.jclepro.2018.10.048
Safarzadeh, 2019, Bi-objective green scheduling in uniform parallel machine environments, J. Clean. Prod., 217, 559, 10.1016/j.jclepro.2019.01.166
Wu, 2019, A memetic differential evolution algorithm for energy-efficient parallel machine scheduling, Omega, 82, 155, 10.1016/j.omega.2018.01.001
Kong, 2020, Green manufacturing: Order acceptance and scheduling subject to the budgets of energy consumption and machine launch, J. Clean. Prod., 248, 10.1016/j.jclepro.2019.119300
Saberi-Aliabad, 2020, Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs, J. Clean. Prod., 249, 10.1016/j.jclepro.2019.119393
Soleimani, 2020, Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization, J. Clean. Prod., 249, 10.1016/j.jclepro.2019.119428
Zandi, 2020, Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier, J. Oper. Res. Soc., 71, 967, 10.1080/01605682.2019.1595190
Gong, 2018, A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators, J. Clean. Prod., 174, 560, 10.1016/j.jclepro.2017.10.188
Piroozfard, 2018, Minimizing total carbon footprint and total late work criterion in flexible job shop scheduling by using an improved multi-objective genetic algorithm, Resour. Conserv. Recy., 128, 267, 10.1016/j.resconrec.2016.12.001
Wang, 2018, A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization, J. Clean. Prod., 188, 575, 10.1016/j.jclepro.2018.03.254
Wu, 2018, A green scheduling algorithm for flexible job shop with energy-saving measures, J. Clean. Prod., 172, 3249, 10.1016/j.jclepro.2017.10.342
Coca, 2019, Sustainable evaluation of environmental and occupational risks scheduling flexible job shop manufacturing systems, J. Clean. Prod., 209, 146, 10.1016/j.jclepro.2018.10.193
Lei, 2019, A two-phase meta-heuristic for multiobjective flexible job shop scheduling problem with total energy consumption threshold, IEEE Trans. Cybern., 49, 1097, 10.1109/TCYB.2018.2796119
Luo, 2019, Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization, J. Clean. Prod., 234, 1365, 10.1016/j.jclepro.2019.06.151
Gong, 2019, Energy- and labor-aware flexible job shop scheduling under dynamic electricity pricing: A many-objective optimization investigation, J. Clean. Prod., 209, 1078, 10.1016/j.jclepro.2018.10.289
Liu, 2019, Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption, J. Clean. Prod., 211, 765, 10.1016/j.jclepro.2018.11.231
Meng, 2019, MILP models for energy-aware flexible job shop scheduling problem, J. Clean. Prod., 210, 710, 10.1016/j.jclepro.2018.11.021
Feng, 2020, Integrated intelligent green scheduling of sustainable flexible workshop with edge computing considering uncertain machine state, J. Clean. Prod., 246, 10.1016/j.jclepro.2019.119070
Li, 2020, An optimization method for energy-conscious production in flexible machining job shops with dynamic job arrivals and machine breakdowns, J. Clean. Prod., 254, 10.1016/j.jclepro.2020.120009
Wang, 2020, Infinitely repeated game based real-time scheduling for low-carbon flexible job shop considering multi-time periods, J. Clean. Prod., 247, 10.1016/j.jclepro.2019.119093
Li, 2018, Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions, J. Clean. Prod., 181, 584, 10.1016/j.jclepro.2018.02.004
Lei, 2018, A novel teaching-learning-based optimization algorithm for energy-efficient scheduling in hybrid flow shop, IEEE Trans. Eng. Manage., 65, 330, 10.1109/TEM.2017.2774281
Lu, 2018, A multi-objective approach to welding shop scheduling for makespan, noise pollution and energy consumption, J. Clean. Prod., 196, 773, 10.1016/j.jclepro.2018.06.137
Wang, 2018, IoT-enabled real-time energy efficiency optimisation method for energy-intensive manufacturing enterprises, Int. J. Comput. Integr. Manuf., 31, 362, 10.1080/0951192X.2017.1337929
Wang, 2018, Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs, Int. J. Prod. Res., 56, 3173, 10.1080/00207543.2017.1401236
Wu, 2018, Multi-objective flexible flow shop scheduling problem considering variable processing time due to renewable energy, Sustainability, 10, 1, 10.3390/su10030841
Zeng, 2018, Multi-object optimization of flexible flow shop scheduling with batch process–consideration total electricity consumption and material wastage, J. Clean. Prod., 183, 925, 10.1016/j.jclepro.2018.02.224
Fu, 2019, Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint, J. Clean. Prod., 226, 515, 10.1016/j.jclepro.2019.04.046
Jiang, 2019, An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time, Int. J. Prod. Res., 57, 1756, 10.1080/00207543.2018.1504251
Lu, 2019, A multi-objective cellular grey wolf optimizer for hybrid flowshop scheduling problem considering noise pollution, Appl. Soft Comput., 75, 728, 10.1016/j.asoc.2018.11.043
Meng, 2019, Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines, Int. J. Prod. Res., 57, 1119, 10.1080/00207543.2018.1501166
Ramezanian, 2019, Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study, Int. J. Prod. Res., 57, 3311, 10.1080/00207543.2019.1581955
Schulz, 2019, A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling, J. Clean. Prod., 224, 421, 10.1016/j.jclepro.2019.03.155
Faraji Amiri, 2020, Multi-objective green flowshop scheduling problem under uncertainty: Estimation of distribution algorithm, J. Clean. Prod., 251, 10.1016/j.jclepro.2019.119734
Liu, 2020, The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling, J. Clean. Prod., 246, 10.1016/j.jclepro.2019.119071
Wang, 2020, A knowledge-based cooperative algorithm for energy-efficient scheduling of distributed flow-shop, IEEE Trans. Syst. Man, Cybern.: Syst., 50, 1805, 10.1109/TSMC.2017.2788879
Aghelinejad, 2018, Production scheduling optimisation with machine state and time-dependent energy costs, Int. J. Prod. Res., 56, 5558, 10.1080/00207543.2017.1414969
Sin, 2020, Bi-objective optimization approach for energy aware scheduling considering electricity cost and preventive maintenance using genetic algorithm, J. Clean. Prod., 244, 10.1016/j.jclepro.2019.118869
Zhang, 2020, A multi-objective cellular genetic algorithm for energy-oriented balancing and sequencing problem of mixed-model assembly line, J. Clean. Prod., 244, 10.1016/j.jclepro.2019.118845
V. Saddikuti, V. Pesaru, NSGA based algorithm for energy efficient scheduling in cellular manufacturing, in: Proceedings of the 25th International Conference on Production Research Manufacturing Innovation: Cyber Physical Manufacturing, Aug. (2019) 9-14, Chicago, Illinois, USA, 2019.
Wan, 2013, Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hard, Oper. Res. Lett., 41, 363, 10.1016/j.orl.2013.04.007
Lakshminarayan, 1978, Optimal single-machine scheduling with earliness and tardiness penalties, Oper. Res., 26, 1079, 10.1287/opre.26.6.1079
Deb, 2002, A fast and elitist multi-objective genetic algorithm: NSGA-II, IEEE Trans. Evol. Comput., 6, 182, 10.1109/4235.996017
Liu, 2014, Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time, J. Clean. Prod., 85, 318, 10.1016/j.jclepro.2014.07.025