Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus

Sustainable Computing: Informatics and Systems - Tập 39 - Trang 100900 - 2023
Jie Lian1, Wenjuan Li2, Guoli Pu1, Pengwei Zhang1
1School of Economics and Management, Xi'an University of Technology, Xi'an, 710048, China
2Beijing Institute of Mathematical Sciences and Applications, Beijing, 101408, China

Tài liệu tham khảo

IEA, 2009 Dai, 2013, Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm, Robot. Comput.-Integr. Manuf., 29, 418, 10.1016/j.rcim.2013.04.001 Liu, 2014, An investigation into minimising total energy consumption and total weighted tardiness in job shops, J. Clean. Prod., 65, 87, 10.1016/j.jclepro.2013.07.060 Wang, 2018, Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan, J. Clean. Prod., 193, 424, 10.1016/j.jclepro.2018.05.056 GCP, 2016 Zhou, 2018, A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost, Comput. Oper. Res., 96, 55, 10.1016/j.cor.2018.04.009 Fang, 2011, A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction, J. Manuf. Syst., 30, 234, 10.1016/j.jmsy.2011.08.004 Yu, 2010, Green scheduling and its solution, Adv. Mater. Res., 139–141, 1415, 10.4028/www.scientific.net/AMR.139-141.1415 Yin, 2017, Energy-efficient job shop scheduling problem with variable spindle speed using a novel multi-objective algorithm, Adv. Mech. Eng., 9, 1, 10.1177/1687814017695959 Mouzon, 2007, Operational methods for minimization of energy consumption of manufacturing equipment, Int. J. Prod. Res., 45, 4247, 10.1080/00207540701450013 Liu, 2010, Seru seisan-an innovation of the production management mode in Japan, Asian J. Technol. Innov., 18, 89, 10.1080/19761597.2010.9668694 Stecke, 2012, Seru: the organizational extension of JIT for a super-talent factory, Int. J. Strateg. Decis. Sci., 3, 106, 10.4018/jsds.2012010104 Liu, 2021, Optimal cross-trained worker assignment for a hybrid seru production system to minimize makespan and workload imblance, Comput. Ind. Eng., 160, 10.1016/j.cie.2021.107552 Zhang, 2017, Effects of key enabling technologies for seru production on sustainable performance, Omega, 66, 290, 10.1016/j.omega.2016.01.013 Liu, 2014, An implementation framework for seru production, Int. Trans. Oper. Res., 21, 1, 10.1111/itor.12014 Yu, 2015, Comparison of two typical scheduling rules of line-seru conversion problem, Asian J. Manage. Sci. Appl., 2, 154 Yu, 2016, Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization, SpringerPlus, 5, 1, 10.1186/s40064-016-2445-5 Sun, 2016, Formulations, features of solution space, and algorithms for line-pure seru system conversion, Math. Probl. Eng., 2016, 10.1155/2016/9748378 Yu, 2017, Line-seru conversion towards reducing worker(s) without increasing makespan: Models, exact and meta-heuristic solutions, Int. J. Prod. Res., 55, 2990, 10.1080/00207543.2017.1284359 Yu, 2017, Line-hybrid seru system conversion: Models, complexities, properties, solutions and insights, Comput. Ind. Eng., 103, 282, 10.1016/j.cie.2016.11.035 Wang, 2018, Cost and service-level-based model for a seru production system formation problem with uncertain demand, J. Syst. Sci. Syst. Eng., 27, 519, 10.1007/s11518-018-5379-3 Sun, 2019, A cooperative coevolution algorithm for the seru production with minimizing makespan, IEEE Access, 7, 5662, 10.1109/ACCESS.2018.2889372 Yılmaz, 2020, Operational strategies for seru production system: a bi-objective optimisation model and solution methods, Int. J. Prod. Res., 58, 3195, 10.1080/00207543.2019.1669841 Yılmaz, 2020, Attaining flexibility in seru production system by means of shojinka: an optimization model and solution approaches, Comput. Oper. Res., 119, 10.1016/j.cor.2020.104917 Liu, 2022, Solving the rotating seru production problem with dynamic multi-objective evolutionary algorithms, J. Manage. Sci. Eng., 7, 48 Gai, 2022, Minimizing makespan of a production batch within concurrent systems: Seru production perspective, J. Manage. Sci. Eng., 7, 1 Lian, 2022, Task dispatching in reconfigurable seru production systems to minimize total earliness and tardiness, Eur. J. Ind. Eng., 16, 241, 10.1504/EJIE.2022.121959 Ding, 2016, Parallel machine scheduling under time-of-use electricity prices: New models and optimization approaches, IEEE Trans. Autom. Sci. Eng., 13, 1138, 10.1109/TASE.2015.2495328 Cheng, 2018, An improved model for parallel machine scheduling under time-of-use electricity price, IEEE Trans. Autom. Sci. Eng., 15, 896, 10.1109/TASE.2016.2631491 Liu, 2018, Scheduling two interfering job sets on parallel machines under peak power constraint, Prod. Eng., 12, 611, 10.1007/s11740-018-0840-1 Che, 2017, Energy-conscious unrelated prallel machine scheduling under time-of-use electricity tariffs, J. Clean. Prod., 156, 688, 10.1016/j.jclepro.2017.04.018 Zeng, 2018, Bi-objective scheduling on uniform parallel machines considering electricity cost, Eng. Optim., 50, 19, 10.1080/0305215X.2017.1296437 Zheng, 2018, A collaborative multiobjective fruit fly optimization algorithm for the resource constrained unrelated parallel machine green scheduling problem, IEEE Trans. Syst. Man, Cybern.: Syst., 48, 790, 10.1109/TSMC.2016.2616347 Abikarram, 2019, Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing, J. Clean. Prod., 208, 232, 10.1016/j.jclepro.2018.10.048 Safarzadeh, 2019, Bi-objective green scheduling in uniform parallel machine environments, J. Clean. Prod., 217, 559, 10.1016/j.jclepro.2019.01.166 Wu, 2019, A memetic differential evolution algorithm for energy-efficient parallel machine scheduling, Omega, 82, 155, 10.1016/j.omega.2018.01.001 Kong, 2020, Green manufacturing: Order acceptance and scheduling subject to the budgets of energy consumption and machine launch, J. Clean. Prod., 248, 10.1016/j.jclepro.2019.119300 Saberi-Aliabad, 2020, Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs, J. Clean. Prod., 249, 10.1016/j.jclepro.2019.119393 Soleimani, 2020, Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization, J. Clean. Prod., 249, 10.1016/j.jclepro.2019.119428 Zandi, 2020, Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier, J. Oper. Res. Soc., 71, 967, 10.1080/01605682.2019.1595190 Gong, 2018, A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators, J. Clean. Prod., 174, 560, 10.1016/j.jclepro.2017.10.188 Piroozfard, 2018, Minimizing total carbon footprint and total late work criterion in flexible job shop scheduling by using an improved multi-objective genetic algorithm, Resour. Conserv. Recy., 128, 267, 10.1016/j.resconrec.2016.12.001 Wang, 2018, A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization, J. Clean. Prod., 188, 575, 10.1016/j.jclepro.2018.03.254 Wu, 2018, A green scheduling algorithm for flexible job shop with energy-saving measures, J. Clean. Prod., 172, 3249, 10.1016/j.jclepro.2017.10.342 Coca, 2019, Sustainable evaluation of environmental and occupational risks scheduling flexible job shop manufacturing systems, J. Clean. Prod., 209, 146, 10.1016/j.jclepro.2018.10.193 Lei, 2019, A two-phase meta-heuristic for multiobjective flexible job shop scheduling problem with total energy consumption threshold, IEEE Trans. Cybern., 49, 1097, 10.1109/TCYB.2018.2796119 Luo, 2019, Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization, J. Clean. Prod., 234, 1365, 10.1016/j.jclepro.2019.06.151 Gong, 2019, Energy- and labor-aware flexible job shop scheduling under dynamic electricity pricing: A many-objective optimization investigation, J. Clean. Prod., 209, 1078, 10.1016/j.jclepro.2018.10.289 Liu, 2019, Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption, J. Clean. Prod., 211, 765, 10.1016/j.jclepro.2018.11.231 Meng, 2019, MILP models for energy-aware flexible job shop scheduling problem, J. Clean. Prod., 210, 710, 10.1016/j.jclepro.2018.11.021 Feng, 2020, Integrated intelligent green scheduling of sustainable flexible workshop with edge computing considering uncertain machine state, J. Clean. Prod., 246, 10.1016/j.jclepro.2019.119070 Li, 2020, An optimization method for energy-conscious production in flexible machining job shops with dynamic job arrivals and machine breakdowns, J. Clean. Prod., 254, 10.1016/j.jclepro.2020.120009 Wang, 2020, Infinitely repeated game based real-time scheduling for low-carbon flexible job shop considering multi-time periods, J. Clean. Prod., 247, 10.1016/j.jclepro.2019.119093 Li, 2018, Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions, J. Clean. Prod., 181, 584, 10.1016/j.jclepro.2018.02.004 Lei, 2018, A novel teaching-learning-based optimization algorithm for energy-efficient scheduling in hybrid flow shop, IEEE Trans. Eng. Manage., 65, 330, 10.1109/TEM.2017.2774281 Lu, 2018, A multi-objective approach to welding shop scheduling for makespan, noise pollution and energy consumption, J. Clean. Prod., 196, 773, 10.1016/j.jclepro.2018.06.137 Wang, 2018, IoT-enabled real-time energy efficiency optimisation method for energy-intensive manufacturing enterprises, Int. J. Comput. Integr. Manuf., 31, 362, 10.1080/0951192X.2017.1337929 Wang, 2018, Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs, Int. J. Prod. Res., 56, 3173, 10.1080/00207543.2017.1401236 Wu, 2018, Multi-objective flexible flow shop scheduling problem considering variable processing time due to renewable energy, Sustainability, 10, 1, 10.3390/su10030841 Zeng, 2018, Multi-object optimization of flexible flow shop scheduling with batch process–consideration total electricity consumption and material wastage, J. Clean. Prod., 183, 925, 10.1016/j.jclepro.2018.02.224 Fu, 2019, Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint, J. Clean. Prod., 226, 515, 10.1016/j.jclepro.2019.04.046 Jiang, 2019, An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time, Int. J. Prod. Res., 57, 1756, 10.1080/00207543.2018.1504251 Lu, 2019, A multi-objective cellular grey wolf optimizer for hybrid flowshop scheduling problem considering noise pollution, Appl. Soft Comput., 75, 728, 10.1016/j.asoc.2018.11.043 Meng, 2019, Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines, Int. J. Prod. Res., 57, 1119, 10.1080/00207543.2018.1501166 Ramezanian, 2019, Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study, Int. J. Prod. Res., 57, 3311, 10.1080/00207543.2019.1581955 Schulz, 2019, A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling, J. Clean. Prod., 224, 421, 10.1016/j.jclepro.2019.03.155 Faraji Amiri, 2020, Multi-objective green flowshop scheduling problem under uncertainty: Estimation of distribution algorithm, J. Clean. Prod., 251, 10.1016/j.jclepro.2019.119734 Liu, 2020, The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling, J. Clean. Prod., 246, 10.1016/j.jclepro.2019.119071 Wang, 2020, A knowledge-based cooperative algorithm for energy-efficient scheduling of distributed flow-shop, IEEE Trans. Syst. Man, Cybern.: Syst., 50, 1805, 10.1109/TSMC.2017.2788879 Aghelinejad, 2018, Production scheduling optimisation with machine state and time-dependent energy costs, Int. J. Prod. Res., 56, 5558, 10.1080/00207543.2017.1414969 Sin, 2020, Bi-objective optimization approach for energy aware scheduling considering electricity cost and preventive maintenance using genetic algorithm, J. Clean. Prod., 244, 10.1016/j.jclepro.2019.118869 Zhang, 2020, A multi-objective cellular genetic algorithm for energy-oriented balancing and sequencing problem of mixed-model assembly line, J. Clean. Prod., 244, 10.1016/j.jclepro.2019.118845 V. Saddikuti, V. Pesaru, NSGA based algorithm for energy efficient scheduling in cellular manufacturing, in: Proceedings of the 25th International Conference on Production Research Manufacturing Innovation: Cyber Physical Manufacturing, Aug. (2019) 9-14, Chicago, Illinois, USA, 2019. Wan, 2013, Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hard, Oper. Res. Lett., 41, 363, 10.1016/j.orl.2013.04.007 Lakshminarayan, 1978, Optimal single-machine scheduling with earliness and tardiness penalties, Oper. Res., 26, 1079, 10.1287/opre.26.6.1079 Deb, 2002, A fast and elitist multi-objective genetic algorithm: NSGA-II, IEEE Trans. Evol. Comput., 6, 182, 10.1109/4235.996017 Liu, 2014, Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time, J. Clean. Prod., 85, 318, 10.1016/j.jclepro.2014.07.025