Automatic assembly path planning for wiring harness installations

Journal of Manufacturing Systems - Tập 32 - Trang 417-422 - 2013
Tomas Hermansson1, Robert Bohlin1, Johan S. Carlson1, Rikard Söderberg2
1Fraunhofer-Chalmers Centre, Chalmers Science Park, SE-412 88 Göteborg, Sweden
2Product and Production Development, Chalmers University of Technology, SE-412 96 Göteborg, SWEDEN

Tài liệu tham khảo

Schaub, 2011, Virtual analysis of compliant parts, The SAE International Journal of Materials and Manufacturing, 4/1, 799, 10.4271/2011-01-0531 LaValle, 2006 Choset, 2005 Gupta, 1998 Canny, 1998 Kavraki, 1996, Probabilistic roadmaps for path planning in high dimensional configuration spaces, IEEE Transactions on Robotics and Automation, 12/4, 10.1109/ROBOT.1996.509171 Bohlin, 2000, Path planning using lazy PRM, Proceedings – IEEE International Conference on Robotics and Automation, 1, 521 LaValle, 1999, Randomized kinodynamic planning, Proceedings – IEEE International Conference on Robotics and Automation, 1, 473, 10.1109/ROBOT.1999.770022 LaValle, 2004, On the relationship between classical grid search and probabilistic roadmaps, International Journal of Robotics Research, 24 Brock, 1998, Executing motion plans for robots with many degrees of freedom in dynamic environments, Proceedings – IEEE International Conference on Robotics and Automation, 1, 1, 10.1109/ROBOT.1998.676237 Shabana, 1997, Flexible multibody dynamics: review of past and recent developments, Multibody System Dynamics, 1, 189, 10.1023/A:1009773505418 Love, 1944 Simo, 1985, A finite strain beam formulation: the three dimensional dynamic problem. Part I, Computer Methods in Applied Mechanics and Engineering, 49, 55, 10.1016/0045-7825(85)90050-7 Jiménez, 2012, Survey on model-based manipulation planning of deformable objects, 2012, Robotics and Computer-Integrated Manufacturing, 28, 154, 10.1016/j.rcim.2011.08.002 Kavraki, 1998, Towards planning for elastic objects, Robotics: The Algorithmic Perspective, 313 Ladd, 2004, Using motion planning for knot untangling, International Journal of Robotics Research, 23/7-8, 797, 10.1177/0278364904045469 Moll, 2006, Path planning for deformable linear objects, IEEE Transactions on Robotics, 22/4, 625, 10.1109/TRO.2006.878933 Bayazit, 2002, Probabilistic roadmap motion planning for deformable objects, Proceedings – IEEE International Conference on Robotics and Automation, 2126 Saha, 2006, Motion planning for robotic manipulation of deformable linear objects, Proceedings – IEEE International Conference on Robotics and Automation, 2478 Rodrguez, 2006, Planning motion in completely deformable environments, Proceedings – IEEE International Conference on Robotics and Automation, 2466 Gupta, 1998, Automated process planning for sheet metal bending operations, Journal of Manufacturing Systems, 17/5, 338, 10.1016/S0278-6125(98)80002-2 Shpitalni, 1994, Automatic determination of bending sequences in sheet metal products, Annals of the CIRP, 43/1, 23, 10.1016/S0007-8506(07)62155-6 Márkus, 2002, Constraint-based process planning in sheet metal bending, Annals of the CIRP, 51/1, 425, 10.1016/S0007-8506(07)61552-2 Hermansson, 2012, Geometric variation simulation and robust design for flexible cables and hoses, Proceedings of the 14th CIRP Conference on Computer Aided Tolerancing Spensieri, 2012, Non-nominal path planning for increased robustness of robotized assembling, Proceedings – 4th CIRP Conference on Assembly Technologies and Systems, 114 Hertz, 1896 www.industrialpathsolutions.com. Virtual simulation and training of assembly and service processes in digital factories (VISTRA), EU research project FP7-ICT-285176, www.vistra-project.eu.