Ant colony intelligence in multi-agent dynamic manufacturing scheduling
Tóm tắt
Từ khóa
Tài liệu tham khảo
Álvarez, 2004, An application of a real-time scheduling system for turbulent manufacturing environments, Robotics and Computer-Integrated Manufacturing, 20, 485, 10.1016/j.rcim.2004.07.010
Baker, A.D., 1991. Manufactruing control with a market-driven contract net. Ph.D. Thesis, Electrical Computer and Systems Engineering Department, Rensselaer Polytechic Institute, Troy, NY.
Ben-Arieh, D., Chopra, M., 1997. A game theoretic approach to real-time distributed shop floor control. In: Proceedings of the Sixth Industrial Engineering Research Conference, pp. 304–309.
Bistline, 1998, RTSS: an interactive decision support system for solving real time scheduling problems considering customer and job priorities with schedule interruptions, Computers & Operations Research, 25, 981, 10.1016/S0305-0548(97)00092-0
Blocher, 1998, Customer order scheduling in a general shop environment, Decision Sciences, 29, 951, 10.1111/j.1540-5915.1998.tb00883.x
Blum, 2004, An ant colony optimization algorithm for shop scheduling problems, Journal of Mathematical Modelling and Algorithms, 3, 285, 10.1023/B:JMMA.0000038614.39977.6f
Bonabeau, 1999
Bonabeau, 2000, Inspiration for optimization from social insect behaviour, Nature, 406, 39, 10.1038/35017500
Campos, 2001, Dynamic scheduling and division of labor in social insects, Adaptive Behavior, 8, 83, 10.1177/105971230000800201
Chryssolouris, 2001, Dynamic Scheduling of manufacturing job shops using genetic algorithm, Journal of Intelligent Manufacturing, 12, 281, 10.1023/A:1011253011638
Cicirello, V.A., Smith, S.F., 2001a. Insect societies and manufacturing. In: Working Notes of The IJCAI-01 Workshop on Artificial Intelligence and Manufacturing, Seattle, WA, pp. 33–38.
Cicirello, V.A., Smith, S.F., 2001b. Ant colony control for autonomous decentralized shop floor routing. In: IEEE 2001 Proceedings of the Fifth International Symposium on Autonomous Decentralized Systems, pp. 383–390.
Cicirello, 2004, Wasp-like agents for distributed factory coordination, Autonomous Agents and Multi-Agent Systems, 8, 237, 10.1023/B:AGNT.0000018807.12771.60
Cowling, 2004, Dynamic scheduling of steel casting and milling using multi-agents, Production Planning & Control, 15, 178, 10.1080/09537280410001662466
Dominic, 2004, Efficient dispatching rules for dynamic job shop scheduling, International Journal of Advanced Manufacturing Technology, 24, 70
Dorigo, M., Maniesso, V., Colorni, A., 1991. Distributed optimization by ant colonies. In: Proceedings of the ECAL91—European Conference on Artificial Life, pp. 134–142.
Fox, 1984, ISIS-knowledge based system for factory scheduling, Expert Systems, 1, 25, 10.1111/j.1468-0394.1984.tb00424.x
Grabot, 1994, Dispatching rules in scheduling: a fuzzy approach, International Journal of Production Research, 32, 903, 10.1080/00207549408956978
Guan, Z., et al., 1995. Application of decentralized cooperative problem solving in dynamic flexible scheduling. In: Proceedings of SPIE, SPIE1995, Bellingham, Washington, pp. 179–183.
Hadeli, 2004, Multi-agent coordination and control using stigmergy, Computers in Industry, 53, 75, 10.1016/S0166-3615(03)00123-4
Holthaus, 1999, Scheduling in job shops with machine breakdowns: an experimental study, Computers & Industrial Engineering, 36, 137, 10.1016/S0360-8352(99)00006-6
Java Agent DEvelopment Framework (JADE), 2006 〈http://jade.tilab.com/〉.
Jennings, 2000, On agent-based software engineering, Artificial Intelligence, 117, 277, 10.1016/S0004-3702(99)00107-1
Kittithreerapronchai, O., Anderson, C., 2003. Do ants paint trucks better than chickens? Market versus response thresholds for distributed dynamic scheduling. In: Proceedings of the 2003 IEEE Congress on Evolutionary Computation, pp. 1431–1439.
Krothapalli, 1999, Design of negotiation protocols for multi-agent manufacturing systems, International Journal of Production Research, 37, 1601, 10.1080/002075499191157
Law, 2000
Li, 1993, A heuristic rescheduling algorithm for computer-based production scheduling systems, International Journal of Production Research, 31, 1815, 10.1080/00207549308956824
Lin, 1992, Integrated shop floor control using autonomous agents, IIE Transactions, 24, 57, 10.1080/07408179208964224
Morley, R., 1996. Painting trucks at general motors: the effectiveness of a complexity-based approach. In: Embracing Complexity: Exploring the Application of Complex Adaptive Systems to Business, the Ernst and Young Center for Business Innovation, pp. 53–58.
Morley, R., Schelberg, C., 1993. An analysis of a plant-specific dynamic scheduler. In: Proceedings of the NSF Workshop on Dynamic Scheduling, pp. 115–122.
Nouyan, S., 2002. Agent-based approach to dynamic task allocation. Lecture Notes in Computer Science, LNCS 2463, pp. 28–39.
Parunak, 1997, Go to the ant: engineering principles from natural multi-agent systems, Annals of Operations Research, 75, 69, 10.1023/A:1018980001403
Peeters, 2001, Pheromone based emergent shop floor control system for flexible flow shops, Artificial Intelligence in Engineering, 15, 343, 10.1016/S0954-1810(01)00026-7
Peirreval, 1997, Dynamic scheduling selection of dispatching rules for manufacturing system, International Journal of Production Research, 35, 1575, 10.1080/002075497195137
Rabelo, 1994, Negotiation in multi-agent based dynamic scheduling, Robotics and Computer-Integrated Manufacturing, 11, 303, 10.1016/0736-5845(95)00007-0
Rajendran, 1999, A comparative study of dispatching rules in dynamic flowshops and jobshops, European Journal of Operational Research, 116, 156, 10.1016/S0377-2217(98)00023-X
Ramasesh, 1990, Dynamic job shop scheduling: a survey of simulation research, International Journal of Management Science, 18, 43
Sabuncuoglu, 1998, Scheduling with neural networks—a review of the literature and new research directions, Production and Inventory Control, 9, 2, 10.1080/095372898234460
Shen, 2002, Distributed manufacturing scheduling using intelligent agents, IEEE Intelligent Systems, 17, 88, 10.1109/5254.988492
Shnits, 2004, Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system, International Journal of Production Research, 42, 3457, 10.1080/00207540410001699444
Smith, 1980, The Contract Net Protocol: high level communication and control in a distributed problem solver, IEEE Transactions on Computers, C-29, 1104, 10.1109/TC.1980.1675516
Subramaniam, 2000, Machine selection rules in a dynamic job shop, International Journal of Advanced Manufacturing Technology, 16, 902, 10.1007/s001700070008
Váncza, 2000, An agent model for incentive-based production scheduling, Computers in Industry, 43, 173, 10.1016/S0166-3615(00)00066-X
van der Zwaan, S., Marques, C., 1999. Ant colony optimization for job shop scheduling, In: Proceedings of the Third Workshop in Genetic Algorithms and Artificial Life (GAAL99).
Walsh, W.E., Wellman, M.P., Wurman, P.R., MacKie-Mason, J.K., 1998. Some economics of market-based distributed scheduling. In: Proceedings of the Eighteenth International Conference on Distributed Computing Systems, pp. 612–621.