Annular Pressure Buildup Calculation When Annulus Contains Gas

Tiezhi Sun1, Xinquan Zhang1, Shujie Liu1, Yanfeng Cao1, Ranhong Xie1
1CNOOC Research institute, Beijing, China

Tóm tắt

Từ khóa


Tài liệu tham khảo

P. Oudeman and M. Kerem, “Transient Behavior of Annular Pressure Build-up in HP_HT Well”, SPE, 88735 (2006).

Hasan Rashid, Izgec Bulent, and Kabir Shah, SPE Production & Operations, 25, No. 2, 195-203 (2010).

A. S. Halal and R. F. Mitchell, SPE Drilling & Completion, 10, No. 2, 84-88 (1995).

P. D. Pattillo, B. W. Cocales, and S. C. Morey, “Analysis of an Annular Pressure Buildup Failure during Drill Ahead”, SPE, 89775 (2004).

Zhang Bo, Guan Diana, and Zhang Qi, ACTA PETROLEI SINICA, 36, No. 8, 1012-1017 (2015).

Roger Williamson, Wayne Sanders, Troy Jakabosky, et al, “Control of Contained-Annulus Fluid Pressure Buildup”, SPE, 79875 (2003).

A. Adams, “How To Design for Annulus Fluid Heat-Up”, SPE, 22871 (1991).

P. Oudeman and L. I. Bacarreza, “Field Trial Results of Annular Pressure Behavior in a High-Pressure High-Temperature Well”, SPE, 26738 (1995).

R. F. Jr. Vargo, M. Payne, R. Faul, et al., “Practical and Successful Prevention of Annular Pressure Buildup on the Marlin Project”, SPE, 77473 (2002).

Zhou Bo, Yang Jin, Liu Zhengli et al., “Petroleum Exploration and Development”, 42, No. 3, 386-389 (2015).

Guo Chunqiu and Li Yingchuan ACTA PETROLEI SINICA, 22, No. 3,100-104 (2001).

Ai Shuang, Chen Linsong, Liu Hongjun, et al., Chinese Journal of Computational Physics, 32, No. 3, 327-333 (2015).

Wen Qianbin, Liang Dachuan, Ren Mao, et al., Petroleum Drilling Techniques, 36, No. 1, 30-32 (2004).

Gao Baokui, Oil Drilling &Production, 24, No. 1, 8-10 (2002).