Analytical stress model for embedded bar-wrapped cylinder concrete pressure pipe under internal load
Tài liệu tham khảo
Ruchti, 2015, 518
Bardakjian, 2013, 340
Hu, 2019, Calculation model for bar-wrapping during prestressing of an embedded bar-wrapped cylinder concrete pressure pipe, Thin-Walled Struct., 139, 39, 10.1016/j.tws.2019.02.036
Romer, 2007, Failure of prestressed concrete cylinder pipe
Ge, 2014, Failure analysis, condition assessment technologies and performance prediction of prestressed-concrete cylinder pipe: state-of-the-art literature review, J. Perform. Constr. Facil., 28, 618, 10.1061/(ASCE)CF.1943-5509.0000424
Lee, 2012, Residual stress study of welded high strength steel thin-walled plate-to-plate joints, Part 1: experimental study, Thin-Walled Struct., 56, 103, 10.1016/j.tws.2012.03.015
Amaitik, 2008, 1
ROSS, 1945, Tests of prestressed concrete pipe containing a steel cylinder, J. Proceed., 42, 37
SEAMAN, 1950, Tests of prestressed concrete cylinder pipe, J. American Water Works Assoc., 42, 1065, 10.1002/j.1551-8833.1950.tb18916.x
KENNISON, 1960, Tests on prestressed concrete embedded cylinder pipe, J. Hydraul. Div., 86, 77, 10.1061/JYCEAJ.0000544
McCALL, 1961, Combined load tests on 108 inch prestressed concrete embedded cylinder pipe
TREMBLAY, 2015, Combined-load testing of prestressed concrete cylinder pipe
Zarghamee, 1993, Coating delamination by radial tension in prestressed concrete pipe. I: experiments, J. Struct. Eng., 119, 2701, 10.1061/(ASCE)0733-9445(1993)119:9(2701)
ZARGHAMEE, 2003, Hydrostatic Pressure Testing of Prestressed Concrete Cylinder Pipe with Broken Wires
2007
2015
Shao Wei, 2011
Boresi, 2011
Riley, 2002
Shao Wei, 2009, Study on structural safety evaluating technique for pre-stressed concrete cylinder pipe (PCCP) in the South-to-North Water Diversion Project, Hydro-Sci. Eng., 29, 74
2011