Analysis of a multi-component system with failure dependency, N-policy and vacations
Tài liệu tham khảo
Kuo, 2003
Cao, 2006
Byun, 2017, Reliability growth analysis of k-out-of-N systems using matrix-based system reliability method, Reliabl Eng Syst Safety, 165, 410, 10.1016/j.ress.2017.05.001
Wu, 2015, Computation and profit analysis of a k-out-of-n:G repairable system under N-policy with multiple vacations and one replaceable repair facility, RAIRO-Oper Res, 49, 717, 10.1051/ro/2015001
Jain, 2012, Load sharing M-out of-N:G system with non-identical components subject to commom cause failure, Int J Math Oper Res, 4, 586, 10.1504/IJMOR.2012.048932
Yuan, 2012, Reliability analysis for a k-out-of-n:G system with redundant dependency and repairmen having multiple vacations, Appl Math Comput, 218, 11959
Moghaddass, 2011, Reliability and availability analysis of a repairable k-out-of-n:G system with R repairmen subject to shut-off rules, IEEE Trans Reliab, 60, 658, 10.1109/TR.2011.2161703
Zhang, 2009, Reliability analysis for a k/n(F) system with repairable repair-equipment., Appl Math Model, 33, 3052, 10.1016/j.apm.2008.10.022
Khatab, 2009, Availability of k-out-of-n:G systems with non-identical components subject to repair priorities, Reliabl Eng Syst Safety, 94, 142, 10.1016/j.ress.2008.02.017
Tang, 2008, New model for load-sharing k-out-of-n:G system with different components, J Syst Eng Electron, 19, 748, 10.1016/S1004-4132(08)60148-6
Ushakumari, 2004, k-Out-of-n system with repair: the max(N, T) policy, Perf Eval, 57, 221, 10.1016/j.peva.2003.10.006
Wu, 2015, Computation and transient analysis of a k-out-of-n:G repairable system with general repair times, Oper Res, 15, 1
Wu, 2018, Reliability analysis of a k-out-of-n:G system with general repair times and replaceable repair equipment, Quality Technol Quant Manag, 15, 274, 10.1080/16843703.2016.1226712
Wu, 2014, Reliability analysis of a k-out-of-n:G repairable system with single vacation, Appl Math Model, 38, 6075, 10.1016/j.apm.2014.05.020
Chakravarthy, 2001, A k-out-of-n reliability system with an unreliable server and phase type repairs and services: the (N,T) policy,, J Appl Math Stochast Anal, 14, 361, 10.1155/S1048953301000326
Zhang, 2017, Analysis of an k-out-of-n:G system with repairmans single vacation and shut off rule, Oper Res Perspect, 4, 29, 10.1016/j.orp.2017.02.002
Wu, 2016, Analysis of a repairable k-out-of-n:G with repairman’s multiple delayed vacations, Int J Comput Math, 93, 2141, 10.1080/00207160.2015.1085975
Yu, 2007, Reliability optimization of a redundant system with failure dependencies, Reliabl Eng Syst Safety, 92, 1627, 10.1016/j.ress.2006.09.015
Yu, 2014, Availability optimization of a redundant system through dependency modelling, Appl Math Model, 38, 4574, 10.1016/j.apm.2014.03.006
Stroock, 2005
Stewart, 2009
Abate, 1995, Numerical inversion of laplace transforms of probability distributions, ORSA J Comput, 7, 36, 10.1287/ijoc.7.1.36
