An optimal policy for a just-in-time integrated manufacturing system for time-varying demand process
Tài liệu tham khảo
Omar, 2013, A just-in-time three-level integrated manufacturing system for linearly time-varying demand process, Appl. Math. Modell., 37, 1275, 10.1016/j.apm.2012.03.041
Kim, 2003, A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage, Int. J. Prod. Econ., 86, 1, 10.1016/S0925-5273(03)00006-9
Hill, 1999, The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory model, Int. J. Prod. Res., 37, 2463, 10.1080/002075499190617
Hill, 2006, Another look at the single-vendor single-buyer integrated production-inventory problem, Int. J. Prod. Res., 44, 791, 10.1080/00207540500334285