An in situ monitoring campaign of a hard rock pillar at great depth within a Canadian mine

Bradley Forbes1, Nicholas Vlachopoulos2, Mark S. Diederichs1, Andrew J. Hyett3, Allan Punkkinen4
1Department of Geological Sciences and Geological Engineering, Queen's University, Kingston, Ontario K7L 3N6, Canada
2Department of Civil Engineering, Royal Military College of Canada, Kingston, Ontario, K7K 7B4, Canada
3YieldPoint Inc., Kingston, Ontario, K7M 4W9, Canada
4Normet Canada Ltd., Lively, Ontario, P3Y 0B3, Canada

Tài liệu tham khảo

Albrecht, 2005, Identifying the factors that control rockburst damage to underground excavations, 519 Barton, 1974, Engineering classification of rock masses for the design of tunnel support, Rock Mechanics, 6, 189, 10.1007/BF01239496 Bawden, 1993 Bieniawski, 1989 Blanco Martín, 2011, A new analytical solution to the mechanical behaviour of fully grouted rockbolts subjected to pull-out tests, Construction and Building Materials, 25, 749, 10.1016/j.conbuildmat.2010.07.011 Brady, 2006 Cai, 2009, The art of rock support in burst-prone ground, 34 Coulson, 1997, 403 Deere, 1963, Technical description of rock cores for engineering purpose, Rock Mechanics and Engineering Geology, 1, 16 Deutsch, 1995, The Sudbury Structure (Ontario, Canada): a tectonically deformed multi-ring impact basin, Geologische Rundschau, 84, 697, 10.1007/s005310050034 Diederichs, 1999, 566 Diederichs, 2003, Manuel rocha medal recipient: rock fracture and collapse under low confinement conditions, Rock Mechanics and Rock Engineering, 36, 339, 10.1007/s00603-003-0015-y Diederichs, 2004, Damage initiation and propagation in hard rock during tunnelling and the influence of near-face stress rotation, International Journal of Rock Mechanics and Mining Sciences, 41, 785, 10.1016/j.ijrmms.2004.02.003 Diederichs, 2007, The 2003 Canadian geotechnical colloquium: mechanistic interpretation and practical application of damage and spalling prediction criteria for deep tunnelling, Canadian Geotechnical Journal, 44, 1082, 10.1139/T07-033 Diederichs, 2010, Measurement of spalling parameters from laboratory testing, 323 Diederichs, 2018, Early assessment of dynamic rupture hazard for rockburst risk management in deep tunnel projects, Journal of the Southern African Institute of Mining and Metallurgy, 118, 193, 10.17159/2411-9717/2018/v118n3a1 Dietz, 1964, Sudbury structure as an astrobleme, The Journal of Geology, 72, 412, 10.1086/626999 Duan, 2016, 176 Farmer, 1975, Stress distribution along a resin grouted rock anchor, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 12, 347, 10.1016/0148-9062(75)90168-0 Forbes, 2017, A new optical sensing technique for monitoring shear of rock bolts, Tunnelling and Underground Space Technology, 66, 34, 10.1016/j.tust.2017.03.007 Forbes, 2018, The application of distributed optical strain sensing to measure the strain distribution of ground support members, FACETS, 3, 195, 10.1139/facets-2017-0093 2019, 22 Groccia, 2016, Quantifying rock mass bulking at a deep underground nickel mine, International Journal of Rock Mechanics and Mining Sciences, 81, 1, 10.1016/j.ijrmms.2015.06.014 Heal, 2006, Evaluating rockburst damage potential in underground mining, 12 Heal, 2010, 357 Heasley, 1997, Development of a fiber optic stress sensor, International Journal of Rock Mechanics and Mining Sciences, 34 Hoek, 2002, Hoek-Brown failure criterion—2002 Edition, 267 Hudyma, 2007, Proactive versus reactive seismic monitoring in mines—results of a seismic monitoring survey, 207 Hudyma, 2017, Seismic hazard in Canadian mines Hyett, 1992, The effect of rock mass confinement on the bond strength of fully grouted cable bolts, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 29, 503, 10.1016/0148-9062(92)92634-O Hyett, 1996, Load distribution along fully grouted bolts, with emphasis on cable bolt reinforcement, International Journal for Numerical and Analytical Methods in Geomechanics, 20, 517, 10.1002/(SICI)1096-9853(199607)20:7<517::AID-NAG833>3.0.CO;2-L Hyett, 1997, The S.M.A.R.T. Cable bolt: an instrument for the determination of tension in 7-wire strand cable bolts, 16 Inaudi, 1996, Development and field test of deformation sensors for concrete embedding, 11 Kaiser, 1996 Kaiser, 2000, Underground works in hard rock tunnelling and mining, 841 Kaiser, 2012, Design of rock support system under rockburst condition, Journal of Rock Mechanics and Geotechnical Engineering, 4, 215, 10.3724/SP.J.1235.2012.00215 Kaiser, 2013, Critical review of design principles for rock support in burst-prone ground—time to rethink!, 3 Kaiser, 2014, Deformation-based support selection for tunnels in strainburst-prone ground, 227 Kaiser, 2018, Excavation vulnerability and selection of effective rock support to mitigate rockburst damage, 473 Krogh, 1984, Precise U-Pb zircon and baddeleyite ages for the Sudbury Area, vol. 1, 431 Li, 2010, A new energy-absorbing bolt for rock support in high stress rock masses, International Journal of Rock Mechanics and Mining Sciences, 47, 396, 10.1016/j.ijrmms.2010.01.005 Li, 2012, Performance of D-bolts under static loading, Rock Mechanics and Rock Engineering, 45, 183, 10.1007/s00603-011-0198-6 Li, 2017, Principles of rockbolting design, Journal of Rock Mechanics and Geotechnical Engineering, 9, 396, 10.1016/j.jrmge.2017.04.002 Malek, 2008, Management of high stress and seismicity at Vale Inco Creighton mine, 8 Martin, 2009, Estimating the potential for spalling around a deep nuclear waste repository in crystalline rock, International Journal of Rock Mechanics and Mining Sciences, 46, 219, 10.1016/j.ijrmms.2008.03.001 Morissette, 2017, Characterisation of burst-prone grounds at Vale's Creighton, Mining Technology, 126, 123, 10.1080/14749009.2016.1252093 Morissette, 2017, The influence of mining sequence and ground support practice on the frequency and severity of rockbursts in seismic ally active mines of the Sudbury Basin, Journal of the Southern African Institute of Mining and Metallurgy, 117, 47, 10.17159/2411-9717/2017/v117n1a8 O'Donnell, 1999, 141 Ortlepp, 1997 Paraskevopoulou, 2016, 361 Potvin, 2013, Towards an understanding of dynamic demand on ground support, Journal of the Southern African Institute of Mining and Metallurgy, 113, 913 Punkkinen, 2018, Monitoring pillar behaviour while driving towards a shear zone in highly stressed ground at Vale's Creighton mine, 7 Punkkinen, 2010, Effective ground support system design to manage seismic hazard in a high stress diminishing pillar at a Vale mine, 367 Punkkinen, 2007, Change of ground support system and mining practice in the Deep at Creighton Mine, 107 Seidler, 2008 Sellers, 1970, The measurement of rock stress changes using hydraulic borehole gages, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 7, 423, 10.1016/0148-9062(70)90036-7 Snelling, 2013, The role of geologic structure and stress in triggering remote seismicity in Creighton Mine, Sudbury, Canada, International Journal of Rock Mechanics and Mining Sciences, 58, 166, 10.1016/j.ijrmms.2012.10.005 Spearing, 2013, New technology for measuring the in situ performance of rock bolts, International Journal of Rock Mechanics and Mining Sciences, 57, 153, 10.1016/j.ijrmms.2012.07.027 Vallejos, 2011, Correlations between mining and seismicity for re-entry protocol development, International Journal of Rock Mechanics and Mining Sciences, 48, 616, 10.1016/j.ijrmms.2011.02.014 Vazaios, 2018, The mechanical analysis and interpretation of the EDZ formation around deep tunnels within massive rockmasses using a hybrid finite-discrete element approach: the case of the AECL URL test tunnel, Canadian Geotechnical Journal, 56, 10.1139/cgj-2017-0578 Vlachopoulos, 2018, Utilizing a novel fiber optic technology to capture the axial responses of fully grouted rock bolts, Journal of Rock Mechanics and Geotechnical Engineering, 10, 222, 10.1016/j.jrmge.2017.11.007 Walton, 2016, Back analysis of a pillar monitoring experiment at 2.4 km depth in the Sudbury Basin, Canada, International Journal of Rock Mechanics and Mining Sciences, 85, 33, 10.1016/j.ijrmms.2016.03.001 Woodward, 2017, Temporal delineation and quantification of short term clustered mining seismicity, Pure and Applied Geophysics, 174, 2581, 10.1007/s00024-017-1570-6 Yao, 2009, Mitigation plans for mining in highly burst-prone ground conditions at Vale Inco copper cliff north mine, 4045 Yao, 2014, Examples of ground support practice in challenging ground conditions at Vale's deep operations in Sudbury, 291 YieldPoint Inc, 2014, 14 YieldPoint Inc, 2017, 3