An approach for analyzing the reliability and profit of an industrial system based on the cost free warranty policy

Ram Niwas1, Harish Garg2
1Department of Statistics, GGDSD College, Chandigarh, India
2School of Mathematics, Thapar Institute of Engineering and Technology (Deemed University), Patiala, India

Tóm tắt

Từ khóa


Tài liệu tham khảo

Adamyan A, David H (2002) Analysis of sequential failure for assessment of reliability and safety of manufacturing systems. Reliab Eng Syst Saf 76(3):227–236

Alqahtani AY, Gupta SM (2017) Warranty as a marketing strategy for remanufactured products. J Clean Prod 161:1294–1307

Ebeling C (2001) An introduction to reliability and maintainability engineering. Tata McGraw-Hill Company Ltd., New York

Garg H (2013) Performance analysis of reparable industrial systems using PSO and fuzzy confidence interval based methodology. ISA Trans 52(2):171–183

Garg H (2013) Reliability analysis of repairable systems using Petri nets and Vague Lambda-Tau methodology. ISA Trans 52(1):6–18

Garg H (2014) Performance and behavior analysis of repairable industrial systems using vague lambda-tau methodology. Appl Soft Comput 22:323–338

Garg H (2014) Reliability, availability and maintainability analysis of industrial systems using PSO and fuzzy methodology. MAPAN J Metrol Soc India 29(2):115–129

Garg H (2017) Performance analysis of an industrial system using soft computing based hybridized technique. J Braz Soc Mech Sci Eng 39(4):1441–1451

Garg H, Rani M (2013) An approach for reliability analysis of industrial systems using PSO and IFS technique. ISA Trans 52(6):701–710

Garg H, Rani M, Sharma SP (2013) Predicting uncertain behavior of press unit in a paper industry using artificial bee colony and fuzzy Lambda-Tau methodology. Appl Soft Comput 13(4):1869–1881

Garg H, Rani M, Sharma SP (2013) Preventive maintenance scheduling of the pulping unit in a paper plant. Japan J Ind Appl Math 30(2):397–414

Garg H, Sharma SP (2012) Behavior analysis of synthesis unit in fertilizer plant. Int J Qual Reliab Manag 29(2):217–232

Garg H, Sharma SP (2012) Stochastic behavior analysis of industrial systems utilizing uncertain data. ISA Trans 51(6):752–762

Garg H, Sharma SP (2012) A two-phase approach for reliability and maintainability analysis of an industrial system. Int J Reliab Qual Saf Eng (IJRQSE) 19(3):19 (Article ID 1250,013)

Garg H, Sharma SP, Rani M (2013) Weibull fuzzy probability distribution for analysing the behaviour of pulping unit in a paper industry. Int J Ind Syst Eng 14(4):395–413

Gopalan M, Bhanu K (1995) Cost analysis of a two unit repairable system subject to on-line preventive maintenance and/or repair. Microelectron Reliab 35(2):251–258

Huang YS, Huang CD, Ho JW (2017) A customized two-dimensional extended warranty with preventive maintenance. Eur J Oper Res 257(3):971–978

Ramniwas, Kadyan MS, Kumar J (2013) Stochastic modelling of a single-unit repairable system with preventive maintenance under warranty. Int J Comput Appl 75(14):36–41

Kadyan MS (2013) Reliability and profit analysis of a single-unit system with preventive maintenance subject to maximum operation time. Eksploatacja i Niezawodnosc 15:176–181

Kadyan MS, Niwas R (2013) Cost benefit analysis of a single-unit system with warranty for repair. Appl Math Comput 223:346–353

Kumar J, Kadyan M, Malik S (2013) Profit analysis of a 2-out-of-2 redundant system with single standby and degradation of the units after repair. Int J Syst Assur Eng Manag 4(4):424–434

Lapa CMF, Pereira CM, Barros MPD (2006) A model for preventive maintenance planning by genetic algorithms based on cost and reliability. Reliab Eng Syst Saf 91:233–240

Leou R (2006) A method for unit maintenance scheduling considering reliability and operation expense. Electr Power Energy Syst 28:471–481

Liao GL (2012) Optimum policy for a production system with major repair and preventive maintenance. Appl Math Model 36(11):5408–5417

Mahmoud M (1989) Reliability study of a two-unit cold standby redundant system with two types of failure and preventive maintenance. Microelectron Reliab 29(6):1061–1068

Mo S, Zeng J, Xu W (2017) A new warranty policy based on a buyer’s preventive maintenance investment. Comput Ind Eng 111:433–444

Murari K, Maruthachalam C (1981) 2-unit parallel system with periods of working and rest. IEEE Trans Reliab 30(1):91

Niwas R, Kadyan M, Kumar J (2015) Probabilistic analysis of two reliability models of a single-unit system with preventive maintenance beyond warranty and degradation. Eksploatacja i Niezawodnosc 17(4):535–543

Niwas R, Kadyan M, Kumar J (2016) Mtsf (mean time to system failure) and profit analysis of a single-unit system with inspection for feasibility of repair beyond warranty. Int J Syst Assur Eng Manag 7(1):198–204

Ram M, Kumar A (2015) Performability analysis of a system under 1-out-of-2: G scheme with perfect reworking. J Braz Soc Mech Sci Eng 37(3):1029–1038

Rander M, Kumar S, Kumar A (1994) Cost analysis of a two dissimilar cold standby system with preventive maintenance and replacement of standby. Microelectron Reliab 34(1):171–174

Srinivasan S, Gopalan M (1973) Probabilistic analysis of a 2-unit cold-standby system with a single repair facility. IEEE Trans Reliab 22(5):250–254

Srinivasan SK, Subramanian R (2006) Reliability analysis of a three unit warm standby redundant system with repair. Ann Oper Res 143(1):227

Venkatachalam P (1978) Stochastic behaviour of a 1-server 2-unit hot standby system. Microelectron Reliab 17(6):603–604

Wang W, Zhao F, Peng R (2014) A preventive maintenance model with a two-level inspection policy based on a three-stage failure process. Reliab Eng Syst Saf 121:207–220

Yanagi S, Sasaki M (1992) Availability of a parallel redundant system with preventive maintenance and common-cause failures. IEICE Trans Fundam Electron Commun Comput Sci 75(1):92–97