An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM)

Rajesh Attri1, Sandeep Grover1, Nikhil Dev1, Deepak Kumar2
1Department of Mechanical Engineering, YMCA University of Science and Technology, Faridabad, India
2Department of Mechanical Engineering, Advanced Institute of Technology and Management, Palwal, India

Tóm tắt

Từ khóa


Tài liệu tham khảo

Agarwal A, Shankar R, Tiwari MK (2006) Modeling agility of supply chain. Ind Mark Manag 36:443–457

Agyris C (1998) Empowerment: the emperor’s new clothes. Harvard Bus Rev 76(3):98–105

Ahuja IPS, Khamba JS (2008a) Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry. J Qual Maint Eng 14(2):123–147

Ahuja IPS, Khamba JS (2008b) Total productive maintenance: literature review and directions. Int J Qual Reliab Manag 25(7):709–756

Badiru AB, Schlegel RE (1994) Project management in computer-integrated manufacturing implementation. In: Karwowski W, Salvendy G (eds) Organization and management of advanced manufacturing. Wiley, New York, pp 255–279

Bamber CJ, Sharp JM, Hides M (1999) Factors affecting successful implementation of total productive maintenance: a UK manufacturing case study perspective. J Qual Maint Eng 5(3):162–181

Banwet DK, Arora R (1999) Enablers and inhibitors of e-commerce implementation in India-an interpretive structural modelling (ISM) approach. In: Kanda A et al (eds) Operations management for global economy challenges and prospects. Phoenix, New Delhi, pp 332–341

Blanchard BS (1997) An enhanced approach for implementing total productive maintenance in the manufacturing environment. J Qual Maint Eng 3(2):69–80

Bolaños R, Fontela E, Nenclares A, Paster P (2005) Using interpretive structural modeling in strategic decision making groups. Manag Decis 43(6):877–895

Chan FTS, Lau HCW, Ip RWL, Chan HK, Kong S (2005) Implementation of total productive maintenance: a case study. Int J Prod Econ 95:71–94

Chen F (1997) Issue in the continuous improvement process for preventive maintenance: observations from Honda, Nippondenso and Toyota. Prod Inventory Manag J 38(4):13–16

Chidambaranathan S, Muralidharan C, Deshmukh SG (2009) Analyzing the interaction of critical factors of supplier development using Interpretive Structural Modeling: an empirical study. Int J Adv Manuf Technol 43:1081–1093

Coetzee JL (1999) A holistic approach to the maintenance problem. J Qual Maint Eng 5(3):276–280

Dal B, Tugwell P, Greatbanks R (2000) Overall equipment effectiveness as a measure for operational improvement. Int J Oper Prod Manag 20(12):1488–1502

Davis R, Willmott P (1999) Total productive maintenance. Alden Press, Oxford

Eti MC, Ogaji SOT, Probert SD (2004) Implementing total productive maintenance in Nigerian manufacturing firms. App Energy 79:385–401

Faisal MN, Banwat DK, Shankar R (2006) Supply chain risk mitigation: modeling the enablers. Buss Process Manag J 12(4):532–552

Faisal MN, Banwat DK, Shankar R (2007a) Supply chain agility: analysing the enablers. Int J Agile Syst Manag 2(1):76–91

Faisal MN, Banwat DK, Shankar R (2007b) Information risks management in supply chain: an assessment and mitigation framework. J Enterp Inf Manag 20(6):677–699

Farris DR, Sage AP (1974) On the use of interpretive structural modeling for worth assessment. Comp Electr Eng 2:149–174

Georgakopoulos A (2009) Teacher effectiveness examined as a system: interpretive modelling and facilitation sessions with U.S. and Japanese students. Int Edu Stud 2(3):60–76

Jeszenka RJ (1993) Breaking through the resistance: achieving TQM in maintenance. Plant Eng 47:132–133

Jharkharia S, Shankar R (2004) IT-enablement of supply chains: modelling the enablers. Int J Productivity Perform Manag 53(8):700–712

Jharkharia S, Shankar R (2005) IT-enablement of supply chains: understanding the barriers. J Enterp Inform Manag 18(1):11–27

Jonsson P, Lesshammar M (1999) Evaluation and improvement of manufacturing performance measurement systems: the role of OEE. Int J Oper Prod Manag 19(1):55–78

Lawrence JJ (1999) Use mathematical modelling to give your TPM implementation effort an extra boost. J Qual Maint Eng 5(1):62–69

Li WL, Humphreys P, Chan LY, Kumaraswamy M (2003) Predicting purchasing performance: the role of supplier development programs. J Mater Process Technol 138(1–3):243–249

Maggard BN, Rhyne DM (1992) Total productive maintenance: a timely integration of production and maintenance. Prod Inventory Manag J 33(4):6–10

Malhotra MK, Grover V (1998) An assessment of survey research in POM: from constructs to theory. J Oper Manag 16(4):407–425

Mandal A, Deshmukh SG (1994) Vendor selection using interpretive structural modeling (ISM). Int J Oper Prod Manag 14(6):52–59

Moore R (1997) Combining TPM and reliability-focused maintenance. Plant Eng 51(6):88–90

Mora E (2002) The right ingredients for a successful TPM or lean implementation. Available at: www.tpmonline.com

Nakajima S (1988) Total productive maintenance. Productivity Press, London

Nakajima S (1989) TPM development program: implementing total productive maintenance. Productivity Press, Cambridge

Paneerselvam R (2010) Production and operations management, PHI learning Private limited

Park KS, Han SW (2001) TPM-total productive maintenance: impact on competitiveness and a framework for successful implementation. Hum Factor Ergonomics Manuf 11(4):321–338

Parmod VR, Banwet DK (2010) ISM for the inhibitors of service supply chain: a case study in a safety health environment and risk consultancy health centre. Int J Logis Eco Glob 2(2):151–175

Patterson JW, Kennedy WJ, Fredendall LD (1995) Total productive maintenance is not for this company. Prod Inventory Manag J 36(2):61–64

Patterson JW, Fredendall LD, Kennedy WJ, McGee A (1996) Adapting total productive maintenance to Asten, Inc. Prod Inventory Manag J 37(4):32–36

Qureshi MN, Kumar D, Kumar P (2007) Modeling the logistics outsourcing relationships variables to enhance shippers productivity and competitiveness in logistics supply chain. Int J Prod Perform Manag 56(8):689–714

Raj T, Attri R (2011) Identification and modelling of barriers in the implementation of TQM. Int J Prod Qual Manag 28(2):153–179

Raj T, Shankar R, Suhaib M (2007) An ISM approach for modeling the enablers of flexible manufacturing system: the case for India. Int J Prod Res 1–30

Rajesh KS, Suresh KG, Deshmukh SG (2007) Interpretive structural modelling of factors for improving competitiveness of SMEs. Int J Prod Qual Manag 2(4):423–440

Ravi V, Shankar R (2005) Analysis of interactions among the barriers of reverse logistics. Technol Forecast Soc Change 72:1011–1029

Ravi V, Shankar R, Tiwari MK (2005) Productivity improvement of a computer hardware supply chain. Int J Prod Perform Meas 54(4):239–255

Sage AP (1977) Interpretive structural modeling: methodology for large scale systems. McGraw-Hill, New York

Saxena JP, Sushil VP, Vrat P (1990) The impact of indirect relationships in classification of variables: a MICMAC analysis for energy conservation. Syst Res 7(4):245–253

Saxena JP, Sushil, Vrat P (1992) Scenario building: a critical study of energy conservation in the Indian cement industry. Technol Forecast Soc Change 41(2):121–146

Schumacker RE, Lomax RG (1996) A beginner’s guide to structural equation modelling. Lawrence Erlbaum Associates, Pittsburgh

Sharma HD, Gupta AD, Sushil (1995) The objectives of waste management in India: a future inquiry. Technol Forecast Soc Change 48:285–309

Sharma RK, Kumar D, Kumar P (2005) FLM to select suitable maintenance strategy in process industries using MISO model. J Qual Maint Eng 11(4):359–374

Singh MD, Kant R (2008) Knowledge management barriers: an interpretive structural modelling approach. Int J Manag Sci Eng Manag 3(2):141–150

Singh MD, Shankar R, Narain R, Agarwal A (2003) An interpretive structural modeling of knowledge management in engineering industries. J Adv Manag Res 1(1):28–40

Singh RK, Garg SK, Deshmukh SG, Kumar M (2007) Modeling of critical success factors for implementation of AMTs. J Model Manag 2(3):232–250

Swanson L (1997) An empirical study of the relationship between production technology and maintenance management. Int J Prod Econ 53(2):191–207

Thakkar J, Deshmukh SG, Gupta AD, Shankar R (2007) Development of score card: an integrated approach of ISM and ANP. Int J Prod Perform Manag 56(1):25–59

Thakkar J, Kanda A, Deshmukh SG (2008) Evaluation of buyer-supplier relationships using an integrated mathematical approach of interpretive structural modeling (ISM) and graph theoretic approach. J Manuf Technol Manag 19(1):92–124

Thiagarajan T, Zairi M (1997) A review of total quality management in practice: understanding the fundamentals through examples of best practice applications: Part 1. TQM Mag 9(4):270–286

Tsang AHC, Chan PK (2000) TPM implementation in China: a case study. Int J Qual Reliab Manag 17(2):144–157

Tsang AHC, Jardine AKS, Cambell JD, Picknell JV (2000) Reliability-centred maintenance: a key to maintenance excellence. Hong Kong: City University of Hong Kong (internet publication)

Tsuchiya S (1992) Quality maintenance: zero defects through equipment management. Productivity Press, Oregon

Turbide DA (1995) Japan’s new advantage: total productive maintenance. Qual Prog 28(3):121–123

Venkatesh V (2007) An introduction to Total productive maintenance (TPM). Available at: www.plant-maintenance.com

Warfield JW (1974) Developing interconnected matrices in structural modelling. IEEE Transac Syst Men Cyber 4(1):51–81

Wisner JD (2003) A structural equation model of supply chain management strategies and firm performance. J Bus Logist 24(1):1–26

Yu J, Cooper H (1983) A quantitative review of research design effects on response rates to questionnaires. J Mark Res 36:36–44