Air traffic optimization models for aircraft delay and travel time minimization in terminal control areas
Tóm tắt
Từ khóa
Tài liệu tham khảo
Abdelghany KF, Abdelghany AF, Ekollu G (2008) An integrated decision support tool for airlines schedule recovery during irregular operations. Eur J Oper Res 185(2):825–848
Agnetis A, De Pascale G, Pranzo M (2009) Computing the Nash solution for scheduling bargaining problems. Int J Oper Res 6(1):54–69
Andreatta G, Capanna L, De Giovanni L, Monaci M, Righi L (2014) Efficiency and robustness in integrated airport apron, a support platform for intelligent airport ground handling. J Intell Transp Syst 18(1):121–130
Atkin JAD, Burke EK, Greenwood JS, Reeson D (2009) An examination of take-off scheduling constraints at London Heathrow airport. Public Transp Plan Oper 1:169–187
Atkin JAD, Burke EK, Greenwood JS (2010) TSAT allocation at London Heathrow: the relationship between slot compliance, throughput and equity. Public Transp Plan Oper 2:173–198
Ball M, Barnhart C, Nemhauser G, Odoni A (2007) Air transportation: irregular operations and control. Handb Oper Res Manag Sci 14(1):1–67
Barnhart C, Fearing D, Odoni A, Vaze V (2012) Demand and capacity management in air transportation. EURO J Transp Logist 1(1–2):135–155
Bertsimas D, Frankovich M, Odoni A (2011) Optimal selection of airport runway configurations. Oper Res 59(6):1407–1419
Bertsimas D, Lulli G, Odoni A (2011) An integer optimization approach to large-scale air traffic flow management. Oper Res 59(1):211–227
Bianco L, Dell’Olmo P, Giordani S (2006) Scheduling models for air traffic control in terminal areas. J Sched 9(3):180–197
Bubalo B, Daduna JR (2011) Airport capacity and demand calculations by simulation—the case of Berlin-Brandenburg International Airport. NETNOMICS 12:161–181
Castelli L, Pesenti R, Ranieri A (2011) The design of a market mechanism to allocate Air Traffic Flow Management slots. Transp Res Part C 19(5):931–943
Churchill AM, Lovell DJ, Ball MO (2010) Flight delay propagation impact on strategic air traffic flow management. Transp Res Records 2177:105–113
Clausen J, Larsen A, Larsen J, Rezanova NJ (2010) Disruption management in the airline industry—concepts, models and methods. Comput Oper Res 37(5):809–821
D’Ariano A, Pacciarelli D, Pranzo M (2007) A branch and bound algorithm for scheduling trains in a railway network. Eur J Oper Res 183(2):643–657
D’Ariano A, D’Urgolo P, Pacciarelli D, Pranzo M (2010) Optimal sequencing of aircrafts take-off and landing at a busy airport. In: Proceedings of the 13th international IEEE annual conference on intelligent transportation systems, Madeira Island, pp 1569–1574
D’Ariano A, Pistelli M, Pacciarelli D (2012) Aircraft retiming and rerouting in vicinity of airports. IET Intell Transp Syst J 6(4):433–443
D’Ariano A, Pacciarelli D, Pistelli M, Pranzo M (2015) Real-time scheduling of aircraft arrivals and departures in a terminal maneuvering area. Networks. Wiley, New York. doi: 10.1002/net.21599
Djokic J, Lorenz B, Fricke H (2010) Air traffic control complexity as workload driver. Transp Res Part C 18(6):930–936
Kalai E, Smorodinsky M (1975) Other solutions to Nash’s bargaining problem. Econometrica 43(3):513–518
Kim J, Kröller A, Mitchell JSB, Sabhnani GR (2009) Scheduling aircraft to reduce controller workload. In: Clausen J, Di Stefano G (eds) Proceedings of the 9th workshop on algorithmic approaches for transportation modeling, optimization, and systems, Copenhagen
Kohl N, Larsen A, Larsen J, Ross A, Tiourine S (2007) Airline disruption management—perspectives, experiences and outlook. J Air Transp Manag 13(3):149–162
Kuchar JK, Yang LC (2000) A review of conflict detection and resolution modeling methods. IEEE Trans Intell Transp Syst 4(1):179–189
Mascis A, Pacciarelli D (2002) Job shop scheduling with blocking and no-wait constraints. Eur J Oper Res 143(3):498–517
Palagachev KD, Rieck M, Gerdts M (2013) A mixed-integer optimal control approach for aircraft landing model. In: Proceedings of the 3rd international conference on models and technologies for intelligent transport systems, Dresden
Pellegrini P, Castelli L, Pesenti R (2012) Metaheuristic algorithms for the simultaneous slot allocation problem. IET Intell Transp Syst 6(4):453–462
Pellegrini P, Rodriguez J (2013) Single European sky and single European railway area: a system level analysis of air and rail transportation. Transp Res Part A 57(1):64–86
Prevot T, Homola J, Martin H, Mercer J (2011) Automated air traffic control operations with weather and time-constraints. Ninth USA/Europe air traffic management research and development seminar, Berlin
Ravizza S, Chen J, Atkin JAD, Burke EK, Stewart P (2013) The trade-off between taxi time and fuel consumption in airport ground movement. Public Transp Plan Oper 5:25–40
Samà M, D’Ariano A, Pacciarelli D (2013a) Rolling horizon approach for aircraft scheduling in the terminal control area of busy airports. Transp Res Part E 60(1):140–155
Samà M, D’Ariano A, D’Ariano P, Pacciarelli D (2013b) Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations. In: Tech. Rep. RT-DIA-205-2013, Dipartimento di Ingegneria, Roma Tre University
Witt A, Voss S (2010) Job shop scheduling with buffer constraints and jobs consuming variable buffer space. Lecture Notes in Business Information Processing, vol 46. In: Dangelmaier W, Blecken A, Delius R, Klöpfer S (eds) Advanced manufacturing and sustainable logistics. Springer, Berlin, pp 295–307