A two machine bicriteria scheduling problem

International Journal of Production Economics - Tập 65 - Trang 125-139 - 2000
Subhash C. Sarin1, R. Hariharan1
1Department of Industrial and Systems Engineering, 250 New Engineering Building, Virginia Polytechnic Institute and State University, Blacksburg, VA 24061, USA

Tài liệu tham khảo

Dileepan, 1988, Bicriterion static scheduling research for a single machine, Omega, 16, 53, 10.1016/0305-0483(88)90008-4 Cenna, 1991, Bicriterion scheduling problem in a job shop with parallel processors, International Journal of Production Economics, 25, 95, 10.1016/0925-5273(91)90135-G Daniels, 1990, Multiobjective flow-shop scheduling, Naval Research Logistics, 37, 981, 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO;2-H Garey, 1977, Two processor scheduling with start-times and deadlines, SIAM Journal on Computer, 6, 416, 10.1137/0206029 Townsend, 1977, Sequencing n jobs on m machines to minimize maximum tardiness, Management Science, 23, 1016, 10.1287/mnsc.23.9.1016 Nunnikhoven, 1977, Scheduling on parallel machines to minimize two criteria related to job tardiness, AIIE Transactions, 9, 288, 10.1080/05695557708975157 A.H.G. Rinnooy Kan, Machine Scheduling Problems: Classification, Complexity and Computations, Martinus Nijhoff, The Hague, 1976. Nelson, 1986, Scheduling with multiple performance measures, Management Science, 32, 464, 10.1287/mnsc.32.4.464 S.C. Sarin, R. Hariharan, Single Machine Bicriteria Scheduling Problem, Virginia Polytechnic Institute and State University, Blacksburg, VA, 24061. Emmons, 1975, One machine sequencing to minimize the weighted sum of completion times with secondary criteria, Naval Research Logistics Quarterly, 22, 585, 10.1002/nav.3800220314