A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery
Tài liệu tham khảo
Acosta-Cano, 2013, Loose coupling based reference scheme for shop floor-control system/production-equipment integration, Journal of Applied Research and Technology, 11, 447, 10.1016/S1665-6423(13)71553-0
Bergstrom, 1970, Multi-item production planning-an extension of the HMMS rules, Management Science, 16, B, 10.1287/mnsc.16.10.B614
Cedillo-Campos, 2013, Dynamic self-assessment of supply chains performance: An emerging market approach, Journal of Applied Research and Technology, 11, 338, 10.1016/S1665-6423(13)71544-X
Chiu, S.W., Lee, C-H., Chiu, Y-S.P., & Cheng, F-T. (2013a). Intra-supply chain system with multiple sales locations and quality assurance. Expert Systems With Applications., 40(7), 2669-2676.
Chiu, S.W., Pai, F.Y., & Wu, W.K. (2013b). Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework. Economic Modelling, 35, 593-596.
Chiu, Y.S.P., Huang, C.C., Wu, M.F., & Chang, H.H. (2013a). Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate. Economic Modelling, 35, 112-117.
Chiu, Y.S.P., Chen, K.K., Cheng, F.T., & Ting, C.K. (2013b). Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” using an alternative approach. Journal of Applied Research and Technology, 11, 317-323.
Chiu, 2014, Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy, Journal of Applied Research and Technology, 12, 615, 10.1016/S1665-6423(14)71641-4
Chiu, 2014, Finite production rate model with quality assurance, multi-customer and discontinuous deliveries, Journal of Applied Research and Technology, 12, 5, 10.1016/S1665-6423(14)71601-3
Gaalman, 1978, Optimal aggregation of multi-item production smoothing models, Management Science, 24, 1733, 10.1287/mnsc.24.16.1733
Grubbström, 1999, The EOQ with backlogging derived without derivatives, International Journal of Production Economics, 59, 529, 10.1016/S0925-5273(98)00015-2
Lin, 2013, A note on “intra-supply chain system with multiple sales locations and quality assurance”, Expert Systems with Applications, 40, 4730, 10.1016/j.eswa.2013.01.050
Mitchell, 1988, Multi-item inventory systems with a service objective, Operations Research, 36, 747, 10.1287/opre.36.5.747
Nahmias, 2009
Rizk, 2006, Multi-item dynamic production-distribution planning in process industries with divergent finishing stages, Computers & Operations Research, 33, 3600, 10.1016/j.cor.2005.02.047
Rosenblatt, 1983, Application of a grouping procedure to a multi-item production system, International Journal of Production Research, 21, 223, 10.1080/00207548308942349
Rosenblatt, 1985, Fixed cycle, basic cycle and EOQ approaches to the multi-item single supplier inventory system, International Journal of Production Research, 23, 1131, 10.1080/00207548508904771
Sox, 1996, Multi-item, multi-period production planning with uncertain demand, IIE Transactions, 28, 891, 10.1080/15458830.1996.11770742
Tseng, 2014, Solving a vendor-buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach, Economic Modelling, 36, 30, 10.1016/j.econmod.2013.09.013
Wu, 2014, Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy, Journal of Engineering Research, 2, 51, 10.7603/s40632-014-0027-7