A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery

Journal of Applied Research and Technology - Tập 13 - Trang 472-476 - 2015
Y.-S.P. Chiu1, M.-F. Wu2, S.W. Chiu3, H.-H. Chang4
1Department of Industrial Engineering & Management, Chaoyang University of Technology, Taichung, Taiwan
2Department of Industrial Engineering & Systems Management, Feng Chia University, Taichung, Taiwan
3Department of Business Administration, Chaoyang University of Technology, Taichung, Taiwan
4Department of Finance, Chaoyang University of Technology, Taichung, Taiwan

Tài liệu tham khảo

Acosta-Cano, 2013, Loose coupling based reference scheme for shop floor-control system/production-equipment integration, Journal of Applied Research and Technology, 11, 447, 10.1016/S1665-6423(13)71553-0 Bergstrom, 1970, Multi-item production planning-an extension of the HMMS rules, Management Science, 16, B, 10.1287/mnsc.16.10.B614 Cedillo-Campos, 2013, Dynamic self-assessment of supply chains performance: An emerging market approach, Journal of Applied Research and Technology, 11, 338, 10.1016/S1665-6423(13)71544-X Chiu, S.W., Lee, C-H., Chiu, Y-S.P., & Cheng, F-T. (2013a). Intra-supply chain system with multiple sales locations and quality assurance. Expert Systems With Applications., 40(7), 2669-2676. Chiu, S.W., Pai, F.Y., & Wu, W.K. (2013b). Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework. Economic Modelling, 35, 593-596. Chiu, Y.S.P., Huang, C.C., Wu, M.F., & Chang, H.H. (2013a). Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate. Economic Modelling, 35, 112-117. Chiu, Y.S.P., Chen, K.K., Cheng, F.T., & Ting, C.K. (2013b). Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” using an alternative approach. Journal of Applied Research and Technology, 11, 317-323. Chiu, 2014, Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy, Journal of Applied Research and Technology, 12, 615, 10.1016/S1665-6423(14)71641-4 Chiu, 2014, Finite production rate model with quality assurance, multi-customer and discontinuous deliveries, Journal of Applied Research and Technology, 12, 5, 10.1016/S1665-6423(14)71601-3 Gaalman, 1978, Optimal aggregation of multi-item production smoothing models, Management Science, 24, 1733, 10.1287/mnsc.24.16.1733 Grubbström, 1999, The EOQ with backlogging derived without derivatives, International Journal of Production Economics, 59, 529, 10.1016/S0925-5273(98)00015-2 Lin, 2013, A note on “intra-supply chain system with multiple sales locations and quality assurance”, Expert Systems with Applications, 40, 4730, 10.1016/j.eswa.2013.01.050 Mitchell, 1988, Multi-item inventory systems with a service objective, Operations Research, 36, 747, 10.1287/opre.36.5.747 Nahmias, 2009 Rizk, 2006, Multi-item dynamic production-distribution planning in process industries with divergent finishing stages, Computers & Operations Research, 33, 3600, 10.1016/j.cor.2005.02.047 Rosenblatt, 1983, Application of a grouping procedure to a multi-item production system, International Journal of Production Research, 21, 223, 10.1080/00207548308942349 Rosenblatt, 1985, Fixed cycle, basic cycle and EOQ approaches to the multi-item single supplier inventory system, International Journal of Production Research, 23, 1131, 10.1080/00207548508904771 Sox, 1996, Multi-item, multi-period production planning with uncertain demand, IIE Transactions, 28, 891, 10.1080/15458830.1996.11770742 Tseng, 2014, Solving a vendor-buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach, Economic Modelling, 36, 30, 10.1016/j.econmod.2013.09.013 Wu, 2014, Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy, Journal of Engineering Research, 2, 51, 10.7603/s40632-014-0027-7