A scheduling model for multirobot assembly cells

Springer Science and Business Media LLC - Tập 3 Số 2 - Trang 149-180 - 1991
Gad Rabinowitz1, Abraham Mehrez2, S. K. Samaddar3
1Department of Administrative Sciences, College of Business Administration, Kent State University, 44242, Kent, Ohio
2Department of Industrial Engineering and Management, Ben Gurion University, Beer-Sheva, Israel
3Management Department, Bryant College, 02917, Smithfield, Rhode Island

Tóm tắt

Từ khóa


Tài liệu tham khảo

BitranG.R., HaasE.A., and HaxA.C. ?Hierarchical Production Planning: A Single Stage System,? Operations Research, Vol. 29, No. 4, pp. 717?743 (1981).

CanadaJ.R., ?Annotated Bibliography on Justification of Computer-Integrated Manufacturing Systems,? The Engineering Economist, Vol. 31, No. 2, pp. 137?150 (1986).

CarrieA.S. and PereraD.T.S. ?Work Scheduling in FMS Under Tool Availability Constraints,? International Journal of Productions Research, Vol. 24, No. 6, pp. 1299?1308 (1986).

ChakravartyA.K. and ShtubA. ?Capacity Cost and Scheduling Analysis for a Multiproduct Flexible Manufacturing Cell,? International Journal of Production Research, Vol. 25, No. 8, pp. 1143?1156 (1987).

DateC.J., An Introduction to Database Systems, Vol. I, Addison-Wesley, Reading, MA (1986).

DavisE.W., ?Project Scheduling Under Resource Constraints-Historical Review and Categorization of Procedures,? AIIE Transactions, Vol. 5, No. 4, pp. 297?313 (1973).

DavisE.W. and PattersonJ.H. ?A Comparison of Heuristic and Optimum Solutions in Resource Constrained Project Scheduling,? Management Science, Vol. 21, No. 8, pp. 944?955 (1975).

GravesS.C., ?Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems,? Management Science, Vol. 28, No. 3, pp. 260?274 (1982).

GravesS.C. and RedfieldC.H., ?Equipment Selection and Task Assignment for Multiproduct Assembly System Design,? International Journal of Flexible Manufacturing Systems, Vol. 1, No. 1, pp. 31?50 (1988).

HaxA.C. and MealH.C., ?Hierarchical Integration of Production planning and Scheduling,? in North Holland/TIMS Studies in Management Science, Vol. 1, ?Logistics,? North-Holland, Amsterdam and Elservier, New York, pp. 53?69 (1975).

KerschbergL. (Ed.), Expert Database Systems: Proceedings from the First International Workshop, The Benjamin/Cummings Publishing Company, Inc., Reading, MA (1986).

KimemiaJ. and GershwinS.B., ?Flow Optimization in Flexible Manufacturing Systems,? International Journal of Production Research, Vol. 23, No. 1, pp. 81?96 (1985).

KrinskyI., MehrezA., MiltenburgG.J., and MyersB.L. ?Flexible Manufacturing Systems Evaluation: An Alternative Approach,? International Journal of Flexible Manufacturing Systems, Vol. 2, No. 3, pp. 237?253 (1990).

KusiakA., ?Flexible Manufacturing Systems: A Structural Approach,? International Journal of Production Research, Vol. 23, No. 6, pp. 1056?1074 (1985).

KusiakA., Intelligent Manufacturing Systems, Prentice Hall, Englewood Cliffs, NJ (1990).

LasdonL.S. and TerjungR.C., ?An Efficient Algorithm for Multi-Item Scheduling,? Operations Research, Vol. 19, No. 4, pp. 946?969 (1971).

MaimonO.Z. and NofS.Y., ?Coordination of Robots Sharing Assembly Tasks,? ASME Journal of Dynamic Systems Measurements and Control, Vol. 107, No. 4, pp. 292?307 (1985).

MaimonO.Z. and GershwinS.B., ?Dynamic Scheduling and Routing for Flexible Manufacturing Systems That Have Unreliable Machines,? Operations Research, Vol. 36, No. 2, pp. 279?291 (1988).

ManneA.S., ?Programming of Economic Lot Sizes,? Management Science, Vol. 4, No. 2, pp. 115?135 (1958).

MillerD.M. and DavisR.P., ?A Dynamic Resource Allocation Model for a Machine Requirements Problem,? AIIE Transactions, Vol. 10, No. 3, pp. 237?243 (1978).

MiriyalaK. and ViswanadhamN., ?Reliability Analysis of Flexible Manufacturing Systems,? International Journal of Flexible Manufacturing Systems, Vol. 2., No. 2, pp. 145?162 (1989).

NorbisM.I. and SmithJ.M., ?Two level Heuristic for the Resource Constrained Scheduling Problem,? International Journal of Production Research, Vol. 24, No. 5, pp. 1203?1220 (1986).

O'GradyP.J. and MenonU., ?Loading a Flexible Manufacturing System,? International Journal of Production Research, Vol. 25, No. 7, pp. 1053?1068 (1987).

PattersonJ.H., ?A Comparison Approach for Solving The Multiple Constrained Resource Project Scheduling Problem,? Management Science, Vol. 30, No. 7, pp. 854?867 (1984).

RankyP.G., Computer Integrated Manufacturing: An Introduction with Case Studies, Prentice-Hall International, Englewood Cliffs, NJ (1985).

SarinS.C. and ChenC.S., ?The Machine Loading and Tool Allocation Problem in a Flexible Manufacturing System,? International Journal of Production Research, Vol. 25, No. 7, pp. 1081?1094 (1987).

SarinS.C., ?Mathematical Analysis of a Robotized Production Cell,? INFOR, Vol. 25, No. 1, pp. 46?56 (1987).

SchmittT.G., KlastorinT., and ShtubA., ?Production Classification System: Concepts, Models and Strategies,? International Journal of Production Research, Vol. 23, No. 3, pp. 563?578 (1985).

SchrageL., ?The Super LINDO/PC: User's Manual,? The Scientific Press, Palo Alto CA (1989).

SchriberT.J. and SteckeK.E., ?Machine Utilizations Achieved Using Balanced FMS Production Ratios in a Simulated Setting,? Annals of Operations Research, Vol. 15, pp. 229?267 (1988).

ShankerK. and TzenYa-J.J., ?A Loading and Dispatching Problem in a Random Flexible Manufacturing System,? International Journal of Production Research, Vol. 23, No. 3, pp. 579?596 (1985).

StinsonJ.P., DavisE.W., and KhumawalaB.M., ?Multiple Resource Constrained Scheduling Using Branch and Bound,? AIIE Transactions, Vol. 10, No. 3, pp. 252?259 (1978).

TalbotF.B. ?Resource-Constrained Project Scheduling with Time Resource Tradeoffs: The Nonpreemptive Case,? Management Science, Vol. 28, No. 10, pp. 1192?1210 (1982).

VernadatF., ?Artificial Intelligence in CIM Databases,? Ch. 7 in Artificial Intelligence: Implications for Computer Integrated Manufacturing, A.Kusiak (Ed.), IFS (Publications) Ltd., UK and Springer-Verlag, New York (1988).

VinodB. and SolbergJ.J., ?The Optimal Design of Flexible Manufacturing Systems,? International Journal of Production Research, Vol. 23, No. 6, pp. 1141?1152 (1985).

WhitneyD.E., ?Planning Programmable Assembly Systems,? Ch. 62 in Handbook of Industrial Robotics, S.Y.Nof (Ed.), John Wiley & Sons, Inc., New York (1985).

Whitney, D.E., of The Charles Stark Draper Laboratory, Inc., Massachusetts, personal communication (1988).

YaoD.D. and BuzacottJ.A., ?Modeling the Performance of Flexible Manufacturing Systems,? International Journal of Production Research, Vol. 23, No. 5, pp. 945?960 (1985).

YaoD.D. and BuzacottJ.A., ?Models of Flexible Manufacturing Systems with Limited Local Buffers,? International Journal of Production Research, Vol. 24, No. 1, pp. 107?118 (1986).

YourdonE., Modern Structural Analysis, Yourdon Press, Englewood Cliffs, NJ (1989).