A risk-based shutdown inspection and maintenance interval estimation considering human error

Process Safety and Environmental Protection - Tập 100 - Trang 9-21 - 2016
Abdul Hameed1, Faisal Khan1, Salim Ahmed1
1Safety and Risk Engineering Group, Faculty of Engineering & Applied Science, Memorial University, St Johns, Canada, A1B 3X5

Tài liệu tham khảo

Alsyouf, 2007, The role of maintenance in improving companies, productivity and profitability, Int. J. Prod. Econ., 105, 70, 10.1016/j.ijpe.2004.06.057 2009 Backlund, 2002, Can we make maintenance decision on risk analysis?, J. Qual. Maint. Eng., 8, 77, 10.1108/13552510210420603 Ben-Daya, 2000, On an imperfect preventive maintenance model, Int. J. Qual. Reliab. Manag., 17, 661, 10.1108/02656710010317065 Bertolini, 2009, Development of risk-based inspection and maintenance procedures for an oil refinery, J. Loss Prev. Process Ind., 22, 244, 10.1016/j.jlp.2009.01.003 Block, 1985, Age dependent minimal repair, J. Appl. Probab., 22, 370, 10.1017/S0021900200037839 Brown, 1983, Imperfect repair, J. Appl. Probab., 20, 851, 10.1017/S0021900200024153 Dey, 1998, A risk-based maintenance model for cross-country pipelines, Cost Eng., 40, 24 Dey, 2001, A risk-based model for inspection and maintenance of cross-country petroleum pipeline, J. Qual. Maint. Eng., 7, 25, 10.1108/13552510110386874 Dhillon, 2006, Human error in maintenance: a review, J. Qual. Maint. Eng., 12, 21, 10.1108/13552510610654510 Dhillon, 1995, Probabilistic analysis of a maintainable system with human error, J. Qual. Maint. Eng., 1, 50, 10.1108/13552519510089592 Dhillon, 1986 Duarte, 2006, Optimization of the preventive maintenance plan of a series components system, Int. J. Press. Vessel Pip., 83, 244, 10.1016/j.ijpvp.2006.02.016 Duffua, 2004, Turnaround maintenance in petrochemical industry, practice and suggested improvement, J. Qual. Maint. Eng., 10, 184, 10.1108/13552510410553235 Fujiyama, 2004, Risk-based inspection and maintenance system for steam turbine, Int. J. Press. Vessel Pip., 81, 825, 10.1016/j.ijpvp.2004.07.005 Ghosh, 2009, Maintenance optimization using probabilistic cost-benefit analysis, J. Loss Prev. Process Ind., 22, 403, 10.1016/j.jlp.2009.01.007 Hameed, 2014, A risk-based methodology to estimate shutdown interval considering system availability, Proc. Safety Prog. Jacob, 2005, Analysis of complex repairable systems, Inst. Electr. Electron. Eng., 54, 517 Judycki, 1994 Khan, 2014, A framework to estimate the risk-based shutdown interval for a processing plant, J. Loss Prev. Process Ind., 32, 18, 10.1016/j.jlp.2014.07.009 Khan, 2004, Risk-based maintenance (RBM): a new approach for process plant inspection and maintenance, Am. Inst. Chem. Eng. Process Saf. Prog., 23, 252, 10.1002/prs.10010 Khan, 2004, Risk-based maintenance of ethylene oxide production facilities, J. Hazard. Mater., A108, 147, 10.1016/j.jhazmat.2004.01.011 Khan, 2003, Risk-based maintenance (RBM); a quantitative approach for maintenance/inspection scheduling and planning, J. Loss Prev. Process Ind., 16, 561, 10.1016/j.jlp.2003.08.011 Khan, 2008, A new methodology for risk-based availability analysis, IEEE Trans. Reliab., 57, 103, 10.1109/TR.2007.911248 Kirwan B. (1996); The validation of three Human Reliability Quantification techniques – THERP, HEART and JHEDI; Part 1 – technique descriptions and validation issues Kirwan, 1997, The validation of three human reliability quantification techniques—THERP, HEART and JHEDI; part III—practical aspects of the usage of the techniques;, Appl. Ergon., 28, 27, 10.1016/S0003-6870(96)00046-4 Kirwan, 1997, The validation of three human reliability quantification techniques—THERP, HEART and JHEDI; part II—results of validation exercise, Appl. Ergon., 28, 17, 10.1016/S0003-6870(96)00045-2 Krishnasamy, 2005, Development of risk-based maintenance (RBM) strategy for a power generating plant, J. Loss Prev. Process Ind., 18, 69, 10.1016/j.jlp.2005.01.002 Kumar, 2008, Prioritization of maintenance tasks on industrial equipment for reliability, Int. J. Qual. Reliab. Manag., 28, 109, 10.1108/02656711111097571 Lawrence, 2012, Cost estimating for turnarounds, Pet. Technol. Q., Q1, 37 Levitin, 1999, Optimization of imperfect preventive maintenance for multi-state system, Reliab. Eng. Syst. Saf., 67, 193 Li, 2003, Imperfect repair models with preventive maintenance, J. Appl. Probab., 40, 1043, 10.1017/S0021900200020283 Malik, 1979, Reliable preventive maintenance policy, AIIE Trans., 1, 221, 10.1080/05695557908974463 Mannan, 2010, The development and application of dynamic operational risk assessment in oil/gas and chemical process industry, Reliab. Eng. Syst. Saf., 95, 806 Nakagawa, 1987, Optimum policies for a system with imperfect maintenance, IEEE Trans. Reliab., R-36, 631, 10.1109/TR.1987.5222488 Nakagawa, 2012, Optimal imperfect preventive maintenance policies for a used system, Int. J. Syst. Sci., 43, 1632, 10.1080/00207721.2010.549583 Neil, 2012, Availability modelling of repairable systems using Bayesian networks, Eng. Appl. Artif. Intell., 25, 698, 10.1016/j.engappai.2010.06.003 Nguyen, 1981, Optimal maintenance policy with imperfect preventive maintenance, IEEE Trans. Reliab., R-30, 10.1109/TR.1981.5221196 Noroozi, 2013, The role of human error in risk analysis: application to pre and post-maintenance procedures of process facilities, Reliab. Eng. Syst. Saf., 119, 251, 10.1016/j.ress.2013.06.038 Noroozi, 2014, Determination of human error probabilities in maintenance procedures of a pump, Process Saf. Environ. Prot., 92, 131, 10.1016/j.psep.2012.11.003 Obiajunwa, 2012, A framework for the evaluation of turnaround maintenance projects, J. Qual. Maint. Eng., 18, 368, 10.1108/13552511211281543 Pil, 2008, Reliability assessment of reliquefaction systems on LNG carriers, Reliab. Eng. Syst. Saf., 93, 1345, 10.1016/j.ress.2006.11.005 Rangan, 1989, Optimal replacement policies for a deteriorating system with imperfect maintenance, Adv. Appl. Probab., 21, 949, 10.1017/S0001867800019194 Rusin, 2012, Optimization of power machines maintenance intervals taking the risk into consideration, Eksploat. i Niezawodn.—Maint. Reliab., 14, 72 Sarkar, 2012, Int. J. Adv. Res. Eng. Appl. Sci., 1, 20 Sönmez, 2013, Strategic analysis of technology and capacity investments in the liquefied natural gas industry, Eur. J. Oper. Res., 226, 100, 10.1016/j.ejor.2012.10.042 Swain A.D., Guttmann H. E., (1983); Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications; NUREC/CR-1278, U.S. Nuclear Regulatory Commission, August 1983, with Addendum #1 to NUREC/CR-1278, August 1983, September 1, 1985, by A. D. Swain. Toriizuka, 2001, Application of performance shaping factor (PSF) for work improvement in industrial plant maintenance tasks, Int. J. Ind. Ergon., 28, 225, 10.1016/S0169-8141(01)00036-1 Tan, 1997, A general framework for preventive maintenance optimization in chemical process operations, Comput. Chem. Eng., 21, 1451, 10.1016/S0098-1354(97)88493-1 Vatn, 1996, An overall model for maintenance optimization, Reliab. Eng. Syst. Saf., 51, 241, 10.1016/0951-8320(95)00055-0 Vaurio, 1995, Optimization of test and maintenance intervals based on risk and cost, Reliab. Eng. Syst. Saf., 49, 23, 10.1016/0951-8320(95)00035-Z Wang, 2012, Development of a risk-based maintenance strategy using FMEA for a continuous catalytic reforming plant, J. Loss Prev. Process Ind., 25, 958, 10.1016/j.jlp.2012.05.009 Wilson, 2003 Zhaoyang, 2011, An evaluation of maintenance strategy using risk based inspection, Saf. Sci., 49, 852, 10.1016/j.ssci.2011.01.015