A numerical and an analytical method for optimum planting date determination
Tài liệu tham khảo
Pinedo, 2012
Van Elderen, 1980, Models and techniques for scheduling farm operations: a comparison, Agric Syst, 5, 1, 10.1016/0308-521X(80)90016-5
Orfanou, 2013, Scheduling for machinery fleets in biomass multiple-field operations, Comput Electron Agric, 94, 12, 10.1016/j.compag.2013.03.002
Bochtis, 2010, Feasibility of a modelling suite for the optimised biomass harvest scheduling, Biosyst Eng, 107, 283, 10.1016/j.biosystemseng.2010.05.005
Ortuño, 2011, A goal programming approach for farm planning with resources dimensionality, Ann Oper Res, 190, 181, 10.1007/s10479-009-0524-5
Darby-Dowman, 2000, A two-stage stochastic programming with recourse model for determining robust planting plans in horticulture, J Oper Res Soc, 83, 10.1057/palgrave.jors.2600858
Guan, 2008, Hybrid Petri nets modeling for farm work flow, Comput Electron Agric, 62, 149, 10.1016/j.compag.2007.12.006
Guan, 2009, Resource assignment and scheduling based on a two-phase metaheuristic for cropping system, Comput Electron Agric, 66, 181, 10.1016/j.compag.2009.01.011
Abdi, 2010, Modeling and analysis of mechanization projects of wheat production by GERT networks, Agric Sci China, 9, 1078, 10.1016/S1671-2927(09)60193-0
Wijngaard, 1988, A heuristic for scheduling problems, especially for scheduling farm operations, Eur J Oper Res, 37, 127, 10.1016/0377-2217(88)90287-1
ASABE Standards. Agricultural machinery management, EP496.3. American Society of Agricultural and Biological Engineers; 2006a.
Khani M. Determination of probability of a working day for tillage operation in Karaj [M.Sc. thesis]. University of Tehran (in Farsi with English abstract); 2008.
ASABE Standards. Agricultural machinery management data, D497.5. American Society of Agricultural and Biological Engineers; 2006b.
