A novel methodology employed for ranking and consolidating performance indicators in holding companies with multiple power plants based on multi-criteria decision-making method

Operations Research Perspectives - Tập 9 - Trang 100254 - 2022
C.A. Murad1, M.M. Bellinello2, A.J. Silva1, A. Caminada Netto1, G.F.M. de Souza1, S.I. Nabeta1
1Polytechnic School of the University of São Paulo, Brazil
2Federal University of Technology - Paraná, Guarapuava, Brazil

Tài liệu tham khảo

2019 2017 Darestani, 2020, What are the key determinants of maintenance performance?, Production, 30, 10.1590/0103-6513.20190155 Yildiz, 2019, A toolbox for the optimal design of run-of-river hydropower plants, Environ Model Softw, 111, 134, 10.1016/j.envsoft.2018.08.018 Rodseth, 2017 Lindberg, 2015, Key performance indicators improve industrial performance, Energy Procedia, 75, 1785, 10.1016/j.egypro.2015.07.474 Parmenter, 2015 da Silva, 2020, Defining maintenance performance indicators for asset management based on ISO 55000 and balanced scorecard: a hydropower plant case study P. Contri, I. Kuzmina Safety of ENF. A unified proposal for a set of maintenance performance indicators for nuclear power plants. 2008. Muchiri, 2011, Development of maintenance function performance measurement framework and indicators, Int J Prod Econ, 131, 295, 10.1016/j.ijpe.2010.04.039 Meier, 2013, Key performance indicators for assessing the planning and delivery of industrial services, Procedia CIRP, 11, 99, 10.1016/j.procir.2013.07.056 Kumar, 2013, Maintenance performance metrics: a state-of-the-art review, J Qual Maint Eng, 19, 233, 10.1108/JQME-05-2013-0029 Sukarma, 2015, The measures of performance for world class manufacturing practices: a critical review, Appl Mech Mater, 761, 545, 10.4028/www.scientific.net/AMM.761.545 K. Engels, C. Muser, B. Mostl Benchmarking of hydropower plants. 2014. Oliveira, 2016, Use of maintenance performance indicators by companies of the industrial hub of manaus, Procedia CIRP, 52, 157, 10.1016/j.procir.2016.07.071 Brundage, 2018, Developing maintenance key performance indicators from maintenance work order data Andersson, 2019, Key performance indicators for energy management in the Swedish pulp and paper industry, Energy Strateg Rev, 24, 229, 10.1016/j.esr.2019.03.004 Pramangioulis, 2019, A methodology for determination and definition of key performance indicators for smart grids development in island energy systems, Energies, 12, 242, 10.3390/en12020242 2020 G. Oladosu, L. George, J. Wells 2020 Cost analysis of hydropower option at non-powered dams. ORNL/TM-2020/1656 (2021) - Report: https://info.ornl.gov/sites/publications/Files/Pub145012.pdf. Betti, 2021, Condition monitoring and predictive maintenance methodologies for hydropower plants equipment, Renew Energy, 171, 246, 10.1016/j.renene.2021.02.102 Gonçalves, 2015, Multi-criteria decision methodology for selecting maintenance key performance indicators, Int J Manag Sci Eng Manag, 10, 215 Kaganski, 2018, Fuzzy AHP as a tool for prioritization of key performance indicators, Procedia CIRP, 72, 1227, 10.1016/j.procir.2018.03.097 Rezaei, 2015, Best-worst multi-criteria decision-making method, Omega, 53, 49, 10.1016/j.omega.2014.11.009 Rezaei, 2016, Best-worst multi-criteria decision-making method: some properties and a linear model, Omega, 64, 126, 10.1016/j.omega.2015.12.001 Rezaei, 2020, A concentration ratio for nonlinear Best Worst method, Int J Inf Technol Decis Mak, 19, 891, 10.1142/S0219622020500170 Mi, 2019, The state-of-the-art survey on integrations and applications of the best worst method in decision-making: why, what, what for and what is next?, Omega, 87, 205, 10.1016/j.omega.2019.01.009 Sadjadi, 2018, Best-Worst multi-criteria decision-making method: a robust approach, Decis Sci Lett, 7, 323, 10.5267/j.dsl.2018.3.003 Komonen, 2012, Corporate asset management for industrial companies: an integrated business-driven approach, 47 2014 2014 Karimi, 2019, A fully fuzzy best-worst multi attribute decision-making method with triangular fuzzy number: a case study of maintenance assessment in the hospitals, Appl Soft Comput J, 86 Saaty, 2008, Decision making with the analytic hierarchy process, Int J Serv Sci, 1, 83 Sadjadi, 2018, Best-Worst multi-criteria decision-making method: a robust approach, Decis Sci Lett, 323, 10.5267/j.dsl.2018.3.003 Mohammadi, 2020, Bayesian best-worst method: a probabilistic group decision making model, Omega, 96, 10.1016/j.omega.2019.06.001 Ali, 2021, Best-Worst method for robot selection, Soft Comput, 25, 563, 10.1007/s00500-020-05169-z Bellinello, 2020, PAL-VMEA: a novel method for enhancing decision-making consistency in maintenance management, Appl Sci, 10, 8040, 10.3390/app10228040 Darestani, 2020, Maintenance strategy selection: a combined goal programming approach and BWM-TOPSIS for paper production industry, J Qual Maint Eng Schmidt, 2016, Measuring patients’ priorities using the analytic hierarchy process in comparison with Best-Worst-scaling and rating cards: methodological aspects and ranking tasks, Health Econ Rev, 6, 50, 10.1186/s13561-016-0130-6 Forman, 1998, Aggregating individual judgments and priorities with the analytic hierarchy process, Eur J Oper Res, 108, 165, 10.1016/S0377-2217(97)00244-0 Saaty, 2012, Models, methods, concepts & applications of the analytic hierarchy process