Benjamin SJ, Murugaiah U, Marathamuthu MS (2013) The use of SMED to eliminate small stops in a manufacturing firm. J Manuf Technol Manag 24(5):792–807. doi:10.1108/17410381311328016
Gung D, Studel F (1990) A work load balancing model for determining set-up time and batch size reduction in G.T. flow line work cells. Int J Prod Res 28(4):255–292
Singh BJ, Khanduja D (2010) SMED: for quick changeovers in foundry SMEs. Int J Prod Perf Manag 59(1):98–116
Shingo S (1985) A revolution in manufacturing: The SMED system. Productivity press, USA translated by Dillon, A.P
Desai MS (2012) Productivity enhancement by reducing setup time – SMED: case study in the automobile factory. Global Journal of Research in Engineering Mechanical and Mechanics Engineering 12(5):15–20
Karasu MK, Cakmakcı M, Cakiroglu MB, Ayva E, Demirel-Ortabas N (2014) Improvement of changeover times via Taguchi empowered SMED/case study on injection molding production. Measurement 7:741–748
Cakmakci M, Karasu MK (2007) Set-up time reduction process and integrated predetermined time system MTM-UAS: a study of application in a large size company of automobile industry. Int J Adv Manuf Technol 33:334–344
Ulutas B (2011) An application of SMED methodology. World Acad Sci Eng Technol 5:63–66
Mcintosh R, Culley S, Gest G, Mileham T, Owen G (1996) An assessment of the role of design in the improvement of changment performance. Int J Oper Prod Man 16(9):5–22
Van Goubergen D, Van Landeghem H (2002) Reducing setup times of manufacturing lines. In Proceeding of international conference on flexible automation and intelligent manufacturing, Dresden, Germany
Rodgers SH (1992) A functional job evaluation technique. Ergonomics, Occup Med-State Art 7(4):679–711
Cakmakci M (2009) Process improvement: performance analysis of the setup time reduction-SMED in the automobile industry. Int J Adv Manuf Technol Vol 41(1):168–179
Deros BM, Mohaamad D, Idris MHM, Rahman MNA, Ghani JA, Ismail AR (2011) Setup time reduction in an automotive battery assembly line. Int J Syst App 5(5):618–625
Joshi RR, Naik GR (2012) Application of SMED methodology—a case study in small scale industry. International Journal of Scientific and Research Publications 2(8):1–4
Trovinger SC, Bohn RE (2005) Setup time reduction for electronics assembly: combining simple (SMED) and IT-based methods. Prod Oper Manag 14(2):205–217
Assaf R, Haddad T (2014) Performance improvement using the single minute exchange of die (SMED) methodology in an aluminum profiles extrusion production system. The 1st international conference on industrial, systems and manufacturing engineering (ISME’14)
Ribeiro D, Braga F, Sousa R, Carmo Silva S (2011) An application of the SMED methodology in an electric power controls company. Romanian Review Precision Mechanics, Optics and Mechatronics No.40, pp.115–122
Almomani MA, Aladeemy M, Abdelhadi A, Mumani A (2013) A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques. Comput Ind Eng 66:461–469
Stadnicka D (2015) Setup analysis: combining SMED with other tools. Management and Production Engineering Review 6(1):36–50
Lin CL (2004) Use of the Taguchi method and grey relational analysis to optimize turning operations with multiple performance characteristics. Mater Manuf Process 19(2):209–220
Tzeng CJ, Lin YH, Yang YK, Jeng MC (2009) Optimization of turning operations with multiple performance characteristics using the Taguchi method and grey relational analysis. J Mater Process Tech 209(6):2753–2759
Haq AN, Marimuthu P, Jeyapaul R (2008) Multi response optimization of machining parameters of drilling Al/SiC metal matrix composite using grey relational analysis in the Taguchi method. Int J Adv Manuf Technol 37:250–255
Mondal S, Kukreja LM, Bandyopadhyay A, Pal PK (2013) Application of Taguchi-based gray relational analysis for evaluating the optimal laser cladding parameters for AISI1040 steel plane surface. Int J Adv Manuf Technol 66(1):91–96
Vellaiyan S, Amirthagadeswaran KS (2016) Taguchi-Grey relational-based multi-response optimization of the water-in-diesel emulsification process. J Mech Sci Technol 30(3):1399–1404
Ferradás PG, Salonitis K (2013) Improving changeover time: a tailored SMED approach for welding cells. Proceedia CIRP 7:598–603
Pannesi RT (1995) Lead time competitiveness in make-to-order manufacturing firm. Int J Prod Res 3(6):150–163
Rodgers SH (2005) Muscle fatigue assessment: functional job analysis technique in handbook of human factors and ergonomics methods. Stanton N, Hedge A, Brookhuis K, Salas E, Hendrick H Ed. CRC PRESS, USA chapter 12, pp. 12-1, 12-9
Phadke MS (1989) Quality engineering using robust design. Prentice-Hall, Englewood Cliffs
Deng J (1989) Introduction to grey system. J Grey Syst 1(1):1–2