A novel approach based on non-parametric resampling with interval analysis for large engineering project risks

Safety Science - Tập 49 - Trang 1340-1348 - 2011
S.M. Mousavi1, R. Tavakkoli-Moghaddam1, H. Hashemi2, S.M.H. Mojtahedi3,4
1Department of Industrial Engineering, College of Engineering, University of Tehran, P.O. Box 11155-4563, Tehran, Iran
2Department of Civil Engineering, Faculty of Engineering, Zanjan University, P.O. Box: 45195-313, Zanjan, Iran
3Planning Manager, Aryana Petro Tavan Company, P.O. Box: 19689/46653, Tehran, Iran
4School of Industrial Engineering, South Tehran Branch, Islamic Azad University, P.O. Box: 11365/4435, Tehran, Iran

Tài liệu tham khảo

Berweger, 1998, Estimating imprecision profiles in biochemical analysis, Clin. Chim. Acta, 277, 107, 10.1016/S0009-8981(98)00093-X Brookfield, 2009, A complexity-based framework of financial risk assessment in large-scale projects, Risk Manage., 11, 44, 10.1057/rm.2008.14 California Department of Transportation (Caltrans), 2007 Carr, 2001, A fuzzy approach to construction project risk assessment and analysis: construction risk management system, Adv. Eng. Softw., 32, 847, 10.1016/S0965-9978(01)00036-9 Duchesne, 2001, Jackknife and bootstrap methods in the identification of dynamic models, J. Process Control., 11, 553, 10.1016/S0959-1524(00)00025-1 Ebrahimnejad, S., Mousavi, S.M., Mojtahedi, S.M.H., 2008. A fuzzy BOT project risk evaluation model in Iranian power plant industry. In: Proc. 5th IEEE Int. Conf. on Ind. Eng. Eng. Manag. Singapore, pp. 1038–1042. Ebrahimnejad, 2009, A fuzzy decision making model for risk ranking with application to the onshore gas refinery, Int. J. Bus Contin. Risk Manage., 1, 38, 10.1504/IJBCRM.2009.028950 Ebrahimnejad, 2010, Risk identification and assessment for build-operate-transfer projects: a fuzzy multi attribute decision making model, Expert Syst. Appl., 37, 575, 10.1016/j.eswa.2009.05.037 Efron, 1993 Efron, 1979, Bootstrap methods: another look at the jackknife, Ann. Stat., 7, 1, 10.1214/aos/1176344552 Efron, 1982 Efron, 1983, A leisurely look at the bootstrap, the jackknife, and cross-validation, Am. Stat., 37, 36 Fang, W., 2009. Bayesian theory and robust control strategy in risk management of large-scale engineering project. In: Proc. Int. Conf. Manage. Ser. Sci. (MASS 2009). Faucher, 1993, Public demand and the management of technological risk in large-scale projects, Sci. Public Policy, 20, 173 Floricel, 2001, Strategizing for anticipated risks and turbulence in large-scale engineering projects, Int. J. Project Manage., 19, 445, 10.1016/S0263-7863(01)00047-3 Hall, 1992 Hastak, 2001, Risk factors affecting management and maintenance cost of urban infrastructure, J. Infrastruct. Syst., 7, 67, 10.1061/(ASCE)1076-0342(2001)7:2(67) Heiermann, 2005, Reliability confidence intervals for ceramic components as obtained from bootstrap methods and neural networks, Comput. Mater. Sci., 34, 1, 10.1016/j.commatsci.2004.10.002 Henderson, 2005, The bootstrap: a technique for data-driven statistics. Using computer-intensive analyzes to explore experimental data, Clin. Chim. Acta, 359, 1, 10.1016/j.cccn.2005.04.002 Kim, 2008, Discriminate analysis for predicting ranges of cost variance in international construction projects, J. Constr. Eng. Manage., 134, 398, 10.1061/(ASCE)0733-9364(2008)134:6(398) Lee, 2009, Large engineering project risk management using a Bayesian belief network, Expert Syst. Appl., 36, 5880, 10.1016/j.eswa.2008.07.057 Long, 2004, Large construction projects in developing countries: a case study from Vietnam, Int. J. Project Manage., 22, 553, 10.1016/j.ijproman.2004.03.004 Makui, 2010, Project risk identification and analysis based on group decision making methodology in a fuzzy environment, Int. J. Manage. Sci. Eng. Manage., 5, 108 Malekly, 2010, A fuzzy integrated methodology for evaluating conceptual bridge design, Expert Syst. Appl., 37, 4910, 10.1016/j.eswa.2009.12.024 Mehrotra, 2006, Conditional resampling of hydrologic time series using multiple predictor variables: a K-nearest neighbor approach, Adv. Water Resour., 29, 987, 10.1016/j.advwatres.2005.08.007 Miller, 2001, Understanding and managing risks in large engineering projects, Int. J. Project Manage., 19, 437, 10.1016/S0263-7863(01)00045-X Mojtahedi, S.M.H., Mousavi, S.M., Makui, A., 2008. Risk identification and analysis concurrently: group decision making approach. In: Proc. 4th IEEE Int. Conf. Manag. Innov. Technol. (ICMIT), Thailand, pp. 299–304. Mojtahedi, 2010, Project risk identification and assessment simultaneously using multi-attribute group decision making technique, Saf. Sci., 48, 499, 10.1016/j.ssci.2009.12.016 Moore, 1979 Morris, 2004 Motawa, 2006, A fuzzy system for evaluating the risk of change in construction projects, Adv. Eng. Softw., 37, 583, 10.1016/j.advengsoft.2006.01.006 Mousavi, S.M.H., Malekly, H., Hashemi, H., Mojtahedi, S.M.H., 2008. A two-phase fuzzy decision making methodology for bridge scheme selection. In: Proc 5th IEEE Int. Conf. Ind. Eng. Eng. Manag., Singapore. Novoa, 2009, Bootstrap methods for analyzing time studies and input data for simulations, Int. J. Product. Perform. Manage., 58, 460, 10.1108/17410400910965724 Project Management Institute, 2008. A Guide to the Project Management Body of Knowledge (PMBOK Guide), fourth ed. Proj Manage Inst., Newton Square, PA. Roy, 2004, Bootstrapped spatial statistics: a more robust approach to the analysis of finite strain data Malay Mukul, J. Struct. Geol., 26, 595, 10.1016/j.jsg.2003.08.011 Sayadi, 2009, Extension of VIKOR method for decision making problem with interval numbers, Appl. Math. Model., 33, 2257, 10.1016/j.apm.2008.06.002 Tah, 2001, Towards a framework for project risk knowledge management in the construction supply chain, Adv. Eng. Softw., 32, 835, 10.1016/S0965-9978(01)00035-7 Tse, C.K., Wong, W.M., Chu, C.H., 2008. Risk consideration in the handling of a large scale engineering project. In: Proc. 4th Int. Struct. Eng. Const. Conf. (ISEC-4), pp. 1501–1506. Wai-Fah, 2000 Zayed, 2008, Assessing risk and uncertainty inherent in Chinese highway projects using AHP, Int. J. Project Manage., 26, 408, 10.1016/j.ijproman.2007.05.012 Zhang, W., 2004. International Project Risk Management. Master Degree Thesis. Professional Management Science and Engineering Unit of Tianjin University. Zhou, H.-B., Zhang, H., 2010. Dynamic Risk Management System for Large Project Construction in China. In: Proc. Geo. Florida Conf. Adv. Anal. Model Des. Zoubir, 1998, The bootstrap and its application in signal processing, IEEE Signal Process. Mag., 15, 56, 10.1109/79.647043