A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants

Reliability Engineering & System Safety - Tập 82 - Trang 165-172 - 2003
Woo Sik Jung1, Joon-Eon Yang1, Jaejoo Ha1
1Korea Atomic Energy Research Institute, P.O. Box 105, Yuseong, Daejeon 305-600, South Korea

Tài liệu tham khảo

Mays SE, Krantz EA, Brinsfield W. Multi-unit IPE and PRA issues. Proceedings of the International Topical Meeting on Probability, Reliability, and Safety Assessment PSA ‘89, Pittsburgh, PA; 1989. p. 29–37. Brinsfield W, McClymont A, Krantz EA, Trainer J, Klopp G. Approach to the evaluation of multi-unit loss of offsite power events. Proceedings of the International Topical Meeting on Probability, Reliability, and Safety Assessment PSA ‘89, Pittsburgh, PA; 1989. p. 796–800. Kim MK. Risk analysis of NPP in multi-unit site for configuration of AAC power source. Proceedings of the Fifth International Conference on Probabilistic Safety Assessment and Management, Osaka, Japan; 2000. US Nuclear Regulatory Commission. Regulatory guide 1.155, Station blackout; August 1988. Korea Electric Power Corporation. Ulchin units 3 and 4 final probabilistic safety assessment report; 1997. US Nuclear Regulatory Commission. Common-cause failure parameter estimations. NUREG/CR-5497, INEL/EXT-97-01328; 1998. Han, 1990, PC-Workstation based level 1 PRA code package-KIRAP, Reliab Engng Syst Safety, 30, 313, 10.1016/0951-8320(90)90101-R Jung WS, Kim DK. FORTE: a fast new algorithm for risk monitors and PSA. Proceedings of the Fourth International Conference on Probabilistic Safety Assessment and Management, New York, USA; September 1998. p. 1221.