A new approximation for risk assessment using the AHP and Fine Kinney methodologies

Safety Science - Tập 91 - Trang 24-32 - 2017
Ali Kokangül1, Ulviye Polat1, Cansu Dağsuyu1
1Department of Industrial Engineering, Cukurova University, 01330 Adana, Turkey

Tóm tắt

Từ khóa


Tài liệu tham khảo

Aksoy, 2012, Attention deficit hyperactivity disorder (ADHD) symptoms and Adult ADHD diagnosis in adult men with cannabis dependence, HealthMed, 6, 1925

Aminbaksh, 2013, Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects, J. Safety Res., 46, 99, 10.1016/j.jsr.2013.05.003

Arunraj, 2010, Risk-based maintenance policy selection using AHP and goal programming, Saf. Sci., 48, 238, 10.1016/j.ssci.2009.09.005

Babut, G., Moraru, R., Cioca, L., 2011. Kinney-Type Methods: Useful or Harmful Tools in the risk assessment and management process?. In: 5th International Conference on Manufacturing Science and Education-MSE2011 2,15–318 -SIBIU-Romania. 02–05.06.2011.

Badri, 2013, A new practical approach to risk management for underground mining project in Quebec, J. Loss Prev. Process Ind., 26, 1145, 10.1016/j.jlp.2013.04.014

Bao-Chun, 2013, Fuzzy AHP-based safety risk assessment methodology for tower crane, J. Appl. Sci., 13, 2598, 10.3923/jas.2013.2598.2601

Dagdeviren, 2008, Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management, Inf. Sci., 178, 1717, 10.1016/j.ins.2007.10.016

Gao, 2014, Application of the model based on fuzzy consistent matrix and AHP in the assessment of fire risk of subway tunnel, Procedia Eng., 71, 591, 10.1016/j.proeng.2014.04.084

Ganguly, 2013, A fuzzy AHP approach for inbound supply risk assessment, Benchmarking: Int. J., 20, 129, 10.1108/14635771311299524

Hui, 2012, Study on safety assessment of fire hazard for the construction site, Procedia Eng., 43, 369, 10.1016/j.proeng.2012.08.064

Jiang, 2010, Investment risks assessment on high-tech projects based on analytic hierarchy process and BP neural network, J. Networks, 5, 393, 10.4304/jnw.5.4.393-402

Kinney, 1976, 1

Lavasani, 2011, Fuzzy risk assessment of oil and gaz offshore wells, Process Saf. Environ. Prot., 89, 277, 10.1016/j.psep.2011.06.006

Mabrouki, 2014, A decision support methodology for risk management within a port terminal, Saf. Sci., 63, 124, 10.1016/j.ssci.2013.09.015

Marhavilas, 2011, Risk analysis and assessment methodologies in the work sites: on a review, classification and comparative study of the scientific literature of the period 2000–2009, J. Loss Prev. Process Ind., 24, 477, 10.1016/j.jlp.2011.03.004

Nefeslioglu, 2013, A modified analytical hierarchy process (M-AHP) approach for decision support systems in natural hazard assessments, Comput. Geosci., 59, 1, 10.1016/j.cageo.2013.05.010

Ngahane, 2012, HIV-seroprevalence among pulmonary tuberculosis patients in a tertiary care hospital in Douala, Cameroon, Afr. J. AIDS Res., 11, 349, 10.2989/16085906.2012.754835

Oturakci, 2015, A new approach to fine Kinney method and an implementation study, Alphanumeric J., 3, 83, 10.17093/aj.2015.3.2.5000139953

Padma, 2007, Analytic hierarchy process to assess occupational risk for shoulder and neck pain, Appl. Math. Comput., 193, 321, 10.1016/j.amc.2007.03.060

Saaty, T.L., 1980. The analytic hierarchy process. New York: McGraw Hill. International, Translated to Russian, Portuguese, and Chinese, Revised editions, Paperback (1996, 2000), Pittsburgh: RWS Publications.

Sharma, 2008, Safety assessment of lubricating oil using AHP and vector projection method, Ind. Lubr. Tribol., 60, 259, 10.1108/00368790810895204

Kant Sharma, 2012, Fuzzy AHP for forest fire risk modeling, Disaster Prevention Manage.: Int. J., 21, 160, 10.1108/09653561211219964

Shi, 2012, Risk assessment on falling from height based on AHP-fuzzy, Procedia Eng., 45, 112, 10.1016/j.proeng.2012.08.130

Sofyalioglu, 2012, The selection of global supply chain risk management strategies by using fuzzy analytical hierarchy process – a case from Turkey, Procedia-Soc. Behav. Sci., 58, 1448, 10.1016/j.sbspro.2012.09.1131

Wang, 2008, An integrated AHP-DEA methodology for bridge risk assessment, Comput. Ind. Eng., 54, 513, 10.1016/j.cie.2007.09.002

Yulong, 2008, Safety risk assessment on communication system based on satellite constellations with the analytic hierarchy process, Aircraft Eng. Aerosp. Technol.: Int. J., 80, 595, 10.1108/00022660810911536

Zheng, 2012, Application of a trapezoidal fuzzy AHP method for work safety evaluation and early warning rating of hot and humit environments, Saf. Sci., 50, 228, 10.1016/j.ssci.2011.08.042

Zhang, 2011, Using Multi-level fuzzy comprehensive evaluation to assess reservoir induced seismic risk, J. Comput., 6, 1670, 10.4304/jcp.6.8.1670-1676