A model for a production–repair system under a time-varying demand process

International Journal of Production Economics - Tập 119 - Trang 17-23 - 2009
Mohd Omar1, Ivan Yeo1
1Institute of Mathematical Sciences, University of Malaya, 50603 Kuala Lumpur, Malaysia

Tài liệu tham khảo

Dobos, 1999, Comparison of deterministic one-product reverse logistics models, 69 Dobos, 2000, The integer EOQ repair and waste disposal model—further analysis, Central European Journal of Operations Research, 8, 173 Dobos, 2003, A production/recycling model with stationary demand and return rates, Central European Journal of Operations Research, 11, 35 Dobos, 2004, An extended production/recycling model with stationary demand and return rates, International Journal of Production Economics, 90, 311, 10.1016/j.ijpe.2003.09.007 Fleischmann, 1997, Quantitative models for reverse logistics: a review, European Journal of Operational Research, 103, 1, 10.1016/S0377-2217(97)00230-0 Fylstra, 1998, Design and use of the Microsoft Excel Solver, Interfaces, 28, 29, 10.1287/inte.28.5.29 Jaber, M.Y., El Saadany, A.M.A., 2008. The production, remanufacture and waste disposal model with lost sales. International Journal of Production Economics, Article available online. Koh, 2002, An optimal ordering and recovery policy for reuseable items, Computers & Industrial Engineering, 43, 59, 10.1016/S0360-8352(02)00062-1 Konstantaras, 2008, A note on: Developing an exact solution for an inventory system with product recovery, International Journal of Production Economics, 111, 707, 10.1016/j.ijpe.2007.03.021 Lasdon, 1978, Design and testing of a generalized reduced gradient code for nonlinear programming, ACM Transactions on Mathematical Software, 4, 34, 10.1145/355769.355773 Mabini, 1992, EOQ type formulations for controlling repairable inventories, International Journal of Production Economics, 28, 21, 10.1016/0925-5273(92)90110-S Nahmias, 1979, A deterministic model for repairable item inventory system with a finite repair rate, International Journal of Production Research, 17, 215, 10.1080/00207547908919609 Omar, 2002, An optimal batch size for a production system under linearly increasing time-varying demand process, Computers & Industrial Engineering, 42, 35, 10.1016/S0360-8352(01)00068-7 Richter, 1996, The EOQ repair and waste disposal model with variable setup numbers, European Journal of Operational Research, 95, 313, 10.1016/0377-2217(95)00276-6 Richter, 1996, The extended EOQ repair and waste disposal model, International Journal of Production Economics, 45, 443, 10.1016/0925-5273(95)00143-3 Richter, 1997, Pure and mixed strategies for the EOQ repair and waste disposal problem, OR Spektrum, 19, 123, 10.1007/BF01545511 Richter, 1999, Analysis of the EOQ repair and waste disposal model with integer setup numbers, International Journal of Production Economics, 59, 463, 10.1016/S0925-5273(98)00110-8 Schrady, 1967, A deterministic inventory model for repairable items, Naval Research Logistics Quarterly, 14, 391, 10.1002/nav.3800140310 Spengler, 1997, Environmental integrated production and recycling management, European Journal of Operational Research, 97, 308, 10.1016/S0377-2217(96)00200-7 Teunter, 2001, Economic ordering quantities for recoverable item inventory systems, Naval Research Logistics, 48, 484, 10.1002/nav.1030 Teunter, 2004, Lot-sizing for inventory systems with product recovery, Computers and Industrial Engineering, 46, 431, 10.1016/j.cie.2004.01.006