A hydropower scheduling model to analyze the impacts from integrated wind and solar powers

Sustainable Energy, Grids and Networks - Tập 27 - Trang 100499 - 2021
Mengfei Xie1, Xianliang Cheng2, Huaxiang Cai1, Jinwen Wang2, Shuangquan Liu3, Qinggui Chen1, Xiangrui Liu1
1Kunming Power Exchange Center Co., Ltd, Kunming, Yunnan 650011, China
2School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan, Hubei 430074, China
3Yunnan Electric Power Dispatch and Control Center, Kunming, Yunnan 650011, China

Tài liệu tham khảo

Jones, 1977, Hydrothermal optimisation by refinement of step-loading schedules, IFAC Proc. Vol., 10, 242, 10.1016/S1474-6670(17)67063-0 Skjelbred, 2020, Dynamic incorporation of nonlinearity into MILP formulation for short-term hydro scheduling, Int. J. Electr. Power Energy Syst., 116, 10.1016/j.ijepes.2019.105530 Lima, 2013, On the computational studies of deterministic global optimization of head dependent short-term hydro scheduling, IEEE Trans. Power Syst., 28, 4336, 10.1109/TPWRS.2013.2274559 Borghetti, 2008, An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir, IEEE Trans. Power Syst., 23, 1115, 10.1109/TPWRS.2008.926704 Azad, 2020, Optimization of the hydropower energy generation using meta-heuristic approaches: A review, Energy Rep., 6, 2230, 10.1016/j.egyr.2020.08.009 Kvasova, 2018, Metaheuristic vs. deterministic global optimization algorithms: The univariate case, Appl. Math. Comput., 318, 245, 10.1016/j.amc.2017.05.014 Biskas, 2006, Comparison of two metaheuristics with mathematical programming methods for the solution of OPF, IEE Proc., Gener. Transm. Distrib., 153, 16, 10.1049/ip-gtd:20050047 Kang, 2017, Jinwen wang short-term hydrothermal scheduling using a two-stage linear programming with special ordered sets method, Water Resour. Manag., 31, 3329, 10.1007/s11269-017-1670-1 Shawwash, 1999, The BC hydro short term hydro scheduling optimization model, 183 Wang, 2018, Short-term hydropower scheduling model with two coupled temporal scales, J. Water Resour. Plann. Manag., 144, 10.1061/(ASCE)WR.1943-5452.0000889 Guedes, 2017, A unit commitment algorithm and a compact MILP model for short-term hydro-power generation scheduling, IEEE Trans. Power Syst., 32, 3381, 10.1109/TPWRS.2016.2641390 Wang, 2012, Short-term operation of hydropower reservoirs with unit commitment and navigation, J. Water Resour. Plann. Manag., 138, 3, 10.1061/(ASCE)WR.1943-5452.0000142 Skjelbred, 2020, Dynamic incorporation of nonlinearity into MILP formulation for short-term hydro scheduling, Int. J. Electr. Power Energy Syst., 116, 10.1016/j.ijepes.2019.105530 Chang, 2001, Experiences with mixed integer linear programming based approaches on short-term hydro scheduling, IEEE Trans. Power Syst., 16, 743, 10.1109/59.962421 Zhou, 2020, Multiobjective scheduling method for short-term peak shaving operation of cascade hydro plants, J. Water Resour. Plann. Manag., 146, 10.1061/(ASCE)WR.1943-5452.0001274 Mariano, 2007, Profit-based short-term hydro scheduling considering head-dependent power generation, 1362 Shen, 2019, Generation scheduling of a hydrodominated provincial system considering forecast errors of wind and solar power, J. Water Resour. Plann. Manage., 145, 10.1061/(ASCE)WR.1943-5452.0001109 Zhang, 2019, Coordinated optimal operation of hydro–wind–solar integrated systems, Appl. Energy, 242, 883, 10.1016/j.apenergy.2019.03.064 Yin, 2019, Day-ahead stochastic coordinated scheduling for thermal-hydro-wind-photovoltaic systems, Energy, 187 Caralis, 2012, The role of pumped storage systems towards the large scale wind integration in the greek power supply system, Renew. Sustain. Energy Rev., 16, 2558, 10.1016/j.rser.2012.01.068