A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem
Tài liệu tham khảo
Abadi, 2000, Minimizing cycle time in a blocking flowshop, Operations Research, 48, 177, 10.1287/opre.48.1.177.12451
Allahverdi, 2008, A survey of scheduling problems with setup times or costs, European Journal of Operational Research, 187, 985, 10.1016/j.ejor.2006.06.060
Caraffa, 2001, Minimizing makespan in a blocking flowshop using genetic algorithms, International Journal of Production Economics, 70, 101, 10.1016/S0925-5273(99)00104-8
Cheng, 2000, A review of flowshop scheduling with setup times, Production and Operations Management, 9, 262, 10.1111/j.1937-5956.2000.tb00137.x
Cheng, 2000, A permutation flow-shop scheduling problem with convex models of operation processing times, Annals of Operations Research, 96, 39, 10.1023/A:1018943300630
Cheng, 2000, Two- and three-stage flowshop scheduling with no-wait in process, Production and Operations Management, 9, 367, 10.1111/j.1937-5956.2000.tb00464.x
Eberhart, R. C., & Kennedy, J. (1995). A new optimizer using particle swarm theory. In Proceedings of the sixth international symposium on micro machine and human science, Nagoya, Japan, pp. 39–43.
Framinan, 2003, An effective constructive heuristic for flowtime minimisation in permutation flow shops, OMEGA, 31, 311, 10.1016/S0305-0483(03)00047-1
Framinan, 2003, Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem, International Journal of Production Research, 41, 121, 10.1080/00207540210161650
Geem, 2005, Application of harmony search to vehicle routing, American Journal of Applied Sciences, 2, 1552, 10.3844/ajassp.2005.1552.1557
Grabowski, 2007, The permutation flow shop problem with blocking. A tabu search approach, OMEGA, 35, 302, 10.1016/j.omega.2005.07.004
Hall, 1996, A survey of machine scheduling problems with blocking and no-wait in process, Operations Research, 44, 510, 10.1287/opre.44.3.510
Lee, 2005, The harmony search heuristic algorithm for discrete structural optimization, Engineering Optimization, 37, 663, 10.1080/03052150500211895
Leisten, 1990, Flowshop sequencing problems with limited buffer storage, International Journal of Production Research, 28, 2085, 10.1080/00207549008942855
Liu, 2008, An effective PSO-based algorithm for flow shop scheduling with limited buffers, Computers & Operations Research, 35, 2791, 10.1016/j.cor.2006.12.013
Mahdavi, 2007, An improved harmony search algorithm for solving optimization problems, Applied Mathematics and Computation, 188, 1567, 10.1016/j.amc.2006.11.033
McCormich, 1989, Sequencing in an assembly line with blocking to minimize cycle time, Operations Research, 37, 925, 10.1287/opre.37.6.925
Nawaz, 1983, A heuristic algorithm for the m-machine, n-job flow shop sequencing problem, OMEGA – International Journal of Management Science, 11, 91, 10.1016/0305-0483(83)90088-9
Omran, 2008, Global-best harmony search, Applied Mathematics and Computation, 198, 643, 10.1016/j.amc.2007.09.004
Pinedo, 2002
Ribas, 2011, An iterated greedy algorithm for the flowshop scheduling problem with blocking, OMEGA, 39, 293, 10.1016/j.omega.2010.07.007
Ronconi, 2004, A note on constructive heuristics for the flowshop problem with blocking, International Journal of Production Economics, 87, 39, 10.1016/S0925-5273(03)00065-3
Ronconi, 2005, A branch-and-bound algorithm to minimize the makespan in a flowshop problem with blocking, Annals of Operations Research, 138, 53, 10.1007/s10479-005-2444-3
Ronconi, 2001, Lower bounding schemes for flowshops with blocking in-process, Journal of the Operational Research Society, 52, 1289, 10.1057/palgrave.jors.2601220
Ronconi, 2009, Some heuristic algorithms for total tardiness minimization in a flowshop with blocking, OMEGA – International Journal of Management Science, 37, 272, 10.1016/j.omega.2007.01.003
Taillard, 1990, Some efficient heuristic methods for the flow shop sequencing problems, European Journal of Operational Research, 47, 65, 10.1016/0377-2217(90)90090-X
Taillard, 1993, Benchmarks for basic scheduling problems, European Journal of Operational Research, 64, 278, 10.1016/0377-2217(93)90182-M
Wang, 2006, A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups, Computers and Operations Research, 33, 1326, 10.1016/j.cor.2004.09.018
Wang, 2006, An effective genetic algorithm for flow shop scheduling with limited buffers, Computers & Operations Research, 33, 2960, 10.1016/j.cor.2005.02.028