A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem
Tóm tắt
Từ khóa
Tài liệu tham khảo
Bukchin, 2002, Lot splitting to minimize average flow-time in a two-machine flow-shop, IIE Transactions, 34, 953, 10.1080/07408170208928925
Cetinkaya, 1994, Lot streaming in a two-stage flow shop with set-up, processing and removal times separated, Journal of Operational Research Society, 45, 1445, 10.1057/jors.1994.221
Chang, 2005, A comprehensive review of lot streaming, International Journal of Production Research, 43, 1515, 10.1080/00207540412331325396
Kalir, 2001, A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots, Omega, 29, 577, 10.1016/S0305-0483(01)00046-9
Kang, 2009, Structural inverse analysis by hybrid simplex artificial bee colony algorithms, Computers and Structures, 87, 861, 10.1016/j.compstruc.2009.03.001
Karaboga, 2009, A new design method based on artificial bee colony algorithm for digital IIR filters, Journal of the Franklin Institute, 346, 328, 10.1016/j.jfranklin.2008.11.003
Karaboga, 2008, On the performance of artificial bee colony (ABC) algorithm, Applied Soft Computing, 8, 687, 10.1016/j.asoc.2007.05.007
Karaboga, 2009, A comparative study of artificial bee colony algorithm, Applied Mathematics and Computation, 10.1016/j.amc.2009.03.090
D. Karaboga, An idea based on honey bee swarm for numerical optimization, Technical Report TR06, Computer Engineering Department, Erciyes University, Turkey, 2005.
Karaboga, 2007, A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm, Journal of Global Optimization, 39, 459, 10.1007/s10898-007-9149-x
Kropp, 1990, Optimal and heuristic models for lot splitting in a flow shop, Decision Sciences, 21, 691, 10.1111/j.1540-5915.1990.tb01244.x
Kumar, 2000, Lot streaming and scheduling heuristics for m-machine no-wait flow shops, Computers and Industrial Engineering, 38, 149, 10.1016/S0360-8352(00)00035-8
Lee, 2009, Some single-machine and m-machine flow shop scheduling problems with learning considerations, Information Sciences, 179, 3885, 10.1016/j.ins.2009.07.011
Liao, 2007, A discrete version of particle swarm optimization for flow shop scheduling problem, Computers and Operations Research, 34, 3099, 10.1016/j.cor.2005.11.017
Marimulthu, 2008, Evolutionary algorithms for scheduling m-machine flow shop with lot streaming, Robotics and Computer-Integrated Manufacturing, 24, 125, 10.1016/j.rcim.2006.06.007
Marimuthu, 2009, Threshold accepting and Ant-colony optimization algorithm for scheduling m-machine flow shop with lot streaming, Journal of Material Processing Technology, 209, 1026, 10.1016/j.jmatprotec.2008.03.013
Potts, 1989, Flow shop scheduling with lot streaming, Operation Research Letters, 8, 297, 10.1016/0167-6377(89)90013-8
Potts, 1992, Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity, Journal of the Operational Research Society, 43, 395, 10.1057/jors.1992.66
Reza, 2007, A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness, Information Sciences, 177, 5072, 10.1016/j.ins.2007.06.001
Sarin, 2008, A single-lot, unified cost-based flow shop lot-streaming problem, International Journal of Production Economics, 113;413
Singh, 2009, An artificial bee colony algorithm for the leaf-constrained minimum spanning tree problem, Applied Soft Computing, 9, 625, 10.1016/j.asoc.2008.09.001
Sriskandarajah, 1999, Lot streaming and scheduling multiple products in two-machine no-wait flow shops, IIE Transactions, 31, 695, 10.1080/07408179908969869
Tseng, 2008, A discrete particle swarm optimization for lot-streaming flow shop scheduling problem, European Journal of Operational Research, 191, 360, 10.1016/j.ejor.2007.08.030
Vickson, 1992, Two- and three-machine flow shop scheduling problems with equal size transfer batches, International Journal of Production Research, 30, 1551, 10.1080/00207549208948107
Vickson, 1995, Optimal lot streaming for multiple products in a two-machine flow shop, European Journal of Operational Research, 85, 556, 10.1016/0377-2217(93)E0366-6
Wang, 2003
Yin, 2009, Some scheduling problems with general position-dependent and time-dependent learning effects, Information Sciences, 179, 2416, 10.1016/j.ins.2009.02.015
Yoon, 2002, An application of genetic algorithms to lot-streaming flow shop scheduling, IIE Transactions, 34, 779, 10.1080/07408170208928911