A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements
Tài liệu tham khảo
Kee, 1994, Development of computer-aided machining optimization for multi-pass rough turning operations, International Journal of Production Economics, 37, 215, 10.1016/0925-5273(94)90172-4
Yeo, 1995, A multipass optimization strategy for CNC lathe operations, International Journal of Production Economics, 40, 209, 10.1016/0925-5273(95)00052-1
Leung, 1990, Multiple machine replacement analysis, Engineering Costs and Production Economics, 20, 265, 10.1016/0167-188X(90)90074-R
Luxhoj, 1992, Replacement analysis for components of large scale production systems, International Journal of Production Economics, 27, 97, 10.1016/0925-5273(92)90001-N
Barad, 1995, Cutting tools versus machine tools investments in FMS design, International Journal of Production Economics, 42, 29, 10.1016/0925-5273(95)00117-4
Johnson, 1992
McMullen, 2000, Using genetic algorithms to solve the multi-product JIT sequencing problem with setups, International Journal of Production Research, 38, 2653, 10.1080/002075400411411
Goldberg, 1989
Michalewicz, 1996
Glover, 1990, Tabu search: a tutorial, Interfaces, 20, 74, 10.1287/inte.20.4.74
Glover, 1993, A user's guide to tabu search, Annals of Operations Research, 41, 3, 10.1007/BF02078647
Bland, 1991, Tabu search and design optimization, Computer Aided Design, 23, 195, 10.1016/0010-4485(91)90089-F
Bonabeau, 1999
Bonabeau E, Theraulaz G. Swarm smarts. Scientific American, 2000;282:72–9.
Kirkpatrick, 1983, Optimization by simulated annealing, Science, 220, 671, 10.1126/science.220.4598.671
Eglese, 1990, Simulated annealing: a tool for operational research, European Journal of Operational Research, 46, 271, 10.1016/0377-2217(90)90001-R
Metropolis, 1953, Equation of state calculations by fast computing machines, Journal of Chemical Physics, 21, 1087, 10.1063/1.1699114
Miltenburg, 1989, Level schedules for mixed-model assembly lines in just-in-time production systems, Management Science, 35, 192, 10.1287/mnsc.35.2.192
Ding, 1993, An effective mixed-model assembly line sequencing heuristic for just-in-time production systems, Journal of Operations Management, 11, 45, 10.1016/0272-6963(93)90032-K
Box, 1953, A note on the generation of random normal deviates, Annals of Mathematical Statistics, 29, 610, 10.1214/aoms/1177706645
Law, 1992
Matthews, 1999
