A control approach to explore the dynamics of capacity scalability in reconfigurable manufacturing systems

Journal of Manufacturing Systems - Tập 25 - Trang 12-24 - 2006
Ahmed M. Deif1, Waguih H. ElMaraghy1
1Intelligent Manufacturing Systems (IMS) Centre, Dept. of Industrial & Manufacturing Systems Engineering, University of Windsor, Windsor, Ontario, Canada

Tài liệu tham khảo

Asl, 2002, Capacity management in reconfigurable manufacturing systems with stochastic market demand Asl, 2002, Capacity management via feedback control in reconfigurable manufacturing systems Deif, 2006, Effect of time-based parameters on agility of a dynamic MPC system, Annals of the CIRP, v55, 10.1016/S0007-8506(07)60453-3 Deif, 2005, Capacity scalability in reconfigurable manufacturing systems Deif, 2004, Reconfigurable manufacturing systems design architecture Disney, 2005, Eliminating drift in inventory and order based production control systems, Int'l Journal of Production Economics, v93–94, 331, 10.1016/j.ijpe.2004.06.031 Duffie, 2002, Control-theoretic analysis of a closed loop PPC system, Annals of the CIRP, v52/1, 379, 10.1016/S0007-8506(07)61541-8 Hopp, 1996 Hoyt, 1980, Determining dynamic lead times for manufactured parts in a job shop, 1 John, 1994, Dynamic analysis of a WIP compensated support system, Int'l Journal of Mfg. Sysrem Design, 1, 283 Kim, 2004, Backlog control design for a closed loop PPC system, Annals of the CIRP, v53, 456 Leachman, 1992, On capacity modeling for production planning with alternative machine types, IIE Trans., 24, 62, 10.1080/07408179208964234 Liberpoulos, 2002, Production capacity modeling of alternative, non-identical, flexible machines, Int'l Journal of Flexible Mfg. Systems, v14, 345, 10.1023/A:1020915200984 Luss, 1982, Operation research & capacity expansion problems: a survey, Operations Research, v30, 907, 10.1287/opre.30.5.907 Manne, 1967 Mehrabi, 2000, Reconfigurable manufacturing systems: key to future manufacturing, Journal of Intelligent Mfg., v11, 403, 10.1023/A:1008930403506 Nyhuis, 1994, Logistic operating curves-a comprehensive method for rating logistic potentials Petennann, 1996 Ratering, 2003, Design and analysis of closedloop single-workstation PPC system, Annals of the CIRP, v52, 375 Roundy, 2000, Optimal capacity expansion for multi-product, multi-machine manufacturing systems with stochastic demand Simon, 1952, On the application of servomechanism theory in the study of production control, Econometrica, v20, 247, 10.2307/1907849 Son, 2001, An approach to scalability and line balancing for reconfigurable manufacturing systems, Integrated Mfg. Systems, v12, 500, 10.1108/09576060110407815 Sterman, 2000 Sterman, 1989, Modelling managerial behaviour: misperceptions of feedback in a dynamic decision-making experiment, Mgmt. Science, v35, 321, 10.1287/mnsc.35.3.321 Towill, 1982, Dynamic analysis of an inventory control and order-based production control system, Int'l Journal of Production Research, v20, 671, 10.1080/00207548208947797 Towill, 1997, Analysis of an adaptive reasonable inventory control system, Journal of Production Planning & Control, v8, 545, 10.1080/095372897234885 Urbani, 2001, Flexibility and reconfigurability: an analytical approach and some examples Wiendahl, 1995 Wiendahl, 1999, Modelling and controlling the dynamics of production systems, Journal of Production Planning & Control, v10, 389, 10.1080/095372899233136 Wiendahl, 2000, Automatic production control applying control theory, Int'l Journal of Production Economics, v63, 33, 10.1016/S0925-5273(98)00253-9 Wikner, 1994, Dynamic modeling and analysis of information flows in production-inventory and supply chain systems Wikner, 2003, Continuous-time dynamic modeling of variable lead time, Int'1 Journal of Production Research, v41, 2787, 10.1080/0020754031000093178