A conceptual framework for integrating building information modeling with augmented reality

Automation in Construction - Tập 34 - Trang 37-44 - 2013
Xiangyu Wang1,2, Peter E.D. Love1,3, Mi Jeong Kim2, Chansik Park4, Michael C.P. Sing1, Lei Hou1
1Australasian Research Centre for Building Information Modelling, and CSi Global BIM Lab, Curtin University, GPO Box U1987, Perth, WA 6845, Australia
2Department of Housing and Interior Design, Kyung Hee University, Seoul 130-701, Republic of Korea
3Department of Architectural Engineering, Kyung Hee University, Yongin, Gyeonggi-do 446-701, Republic of Korea
4School of Architecture and Building Science, Chung-Ang University, Seoul 156-756, Republic of Korea

Tóm tắt

Từ khóa


Tài liệu tham khảo

Froese, 2010, The impact of emerging information technology on project management for construction, Automation in Construction, 19, 531, 10.1016/j.autcon.2009.11.004

Love, 2011, Design error reduction: toward the effective utilization of Building Information Modelling, Research in Engineering Design, 22, 173, 10.1007/s00163-011-0105-x

McGraw-Hill Construction, 2008

Hou, 2011, Experimental framework for evaluating cognitive workload of using AR system in general task, 625

Penttilä, 2006, Describing the changes in architectural information technology to design complexity and free form expression, Journal of Information Technology in Construction, 11, 395

Dossick, 2009, Organizational divisions in BIM enabled commercial construction, ASCE Journal of Construction, Engineering and Management, 136, 459, 10.1061/(ASCE)CO.1943-7862.0000109

National Institute of Building Sciences (NIBS)

Taylor, 2009, Paradigm trajectories of building information modeling practice in project networks, ASCE Journal of Management in Engineering, 25, 69, 10.1061/(ASCE)0742-597X(2009)25:2(69)

2006

Milgram, 1999, A taxonomy of real and virtual world display integration, 1

Milgram, 1994, A taxonomy of mixed reality visual displays, IEICE Transactions on Information and Systems, E77-D, 1321

Dong, 2010, Resolving incorrect visual occlusion in outdoor Augmented Reality using TOF camera and OpenGL frame buffer, 55

Singh, 2011, A theoretical framework of a BIM-based multi-disciplinary collaboration platform, Automation in Construction, 20, 134, 10.1016/j.autcon.2010.09.011

Lee, 2010, Functional requirement of an AR System for supervision, commenting, and strategizing in construction

Siu, 2010, Bored pile construction visualization by enhanced production-line chart and augmented-reality photos

Dunston, 2005, Mixed Reality-based visualization interfaces for the AEC industry, ASCE Journal of Construction, Engineering and Management, 131, 1301, 10.1061/(ASCE)0733-9364(2005)131:12(1301)

Wang, 2006, Compatibility issues in Augmented Reality systems for AEC: an experimental prototype study, Automation in Construction, 15, 314, 10.1016/j.autcon.2005.06.002

Wang, 2007, Using augmented reality to plan virtual construction worksite, International Journal of Advanced Robotic Systems, 4, 501, 10.5772/5677

Dunston, 2011, An iterative methodology for mapping mixed reality technologies to AEC operations, Journal of Information Technology in Construction, 16, 509

Wang, 2007, Design, strategies, and issues towards an augmented reality-based construction training platform, Journal of Information Technology in Construction, 12, 363

Talmaki, 2010, Geospatial databases and augmented reality visualization for improving safety in urban excavation operations, 91

Kim, 2011, Mobile computing platform for construction site management, 1164

Trung, 2011, A generation step for force reflecting control of a pneumatic excavator based on augmented reality environment, 637

Chen, 2011, A smart crane operations assistance system using augmented reality technology, 643

Wang, 2009, Augmented reality in architecture and design: potentials and challenges for application, International Journal of Architectural Computing, 7, 309, 10.1260/147807709788921985

Hinckley, 1994, Design hints for spatial input, 213

Azuma, 1997, A survey of augmented reality, Presence: Teleoperators and Virtual Environment, 6, 355, 10.1162/pres.1997.6.4.355

Dunston, 2011, A hierarchical taxonomy of AEC operations for mixed reality applications, Journal of Information Technology in Construction, 16, 433

Yoon, 1985, Aiding the operator during novel fault diagnosis, 362

Love, 2009, Project pathogens: the anatomy of omission errors in construction and resource engineering projects, IEEE Transactions on Engineering Management, 56, 425, 10.1109/TEM.2008.927774

Wickens, 1995, Object versus space-based models of visual attention: implications for the design of head-up displays, Journal of Experimental Psychology. Applied, 1, 179, 10.1037/1076-898X.1.3.179

Towne, 1985, Cognitive workload in fault diagnosis

Proctor, 1994

Bernold, 2011

Arayici, 2011, Technology adoption in the BIM implementation for lean architectural practice, Automation in Construction, 20, 189, 10.1016/j.autcon.2010.09.016

Love, 1999, Rework: a symptom of a dysfunctional supply-chain, European Journal of Purchasing and Supply Management, 5, 1, 10.1016/S0969-7012(98)00017-3

Čuš Babič, 2010, Integrating resource production and construction using BIM, Automation in Construction, 19, 539, 10.1016/j.autcon.2009.11.005

Love, 2012, Moving beyond optimism bias and strategic misrepresentation: an explanation for social infrastructure project cost overruns, IEEE Transactions on Engineering Management, 99, 1

Gu, 2010, Understanding and facilitating BIM adoption in the AEC industry, Automation in Construction, 19, 988, 10.1016/j.autcon.2010.09.002

Standing, 2007, Leveraging global markets: lessons from Alcoa Alumina, International Journal of Information Management, 27, 432, 10.1016/j.ijinfomgt.2007.08.005

Moum, 2010, Design team stories: exploring interdisciplinary use of 3D object models in practice, Automation in Construction, 19, 554, 10.1016/j.autcon.2009.11.007