A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system

Operations Research Perspectives - Tập 2 - Trang 137-149 - 2015
Chukwunonyelum Emmanuel Onyeocha1, Jiayi Wang1, Joseph Khoury2, John Geraghty1
1Enterprise Process Research Centre, School of Mechanical & Manufacturing Engineering, Dublin City University, Dublin 9, Ireland
2Methode Electronics International, Germany

Tài liệu tham khảo

Spearman, 1990, CONWIP: a pull alternative to Kanban, Int J Prod Res, 28, 879, 10.1080/00207549008942761 Park, 2013, Performance evaluation of a multi-product CONWIP assembly system with correlated external demands, Int J Prod Econ, 144, 334, 10.1016/j.ijpe.2013.02.021 Duri, 2000, Comparison among three pull control policies: Kanban, base stock, and generalized Kanban, Ann Oper Res, 93, 41, 10.1023/A:1018919806139 Spearman, 1992, Customer service in pull production system, Oper Res, 40, 948, 10.1287/opre.40.5.948 Spearman, 1992, Push and pull production systems: issues and comparisons, Oper Res, 40, 521, 10.1287/opre.40.3.521 Mustadt, 1995, A comparison of alternative Kanban control mechanisms. I. Background and structural results, IIE Trans, 27, 140, 10.1080/07408179508936726 Mustadt, 1995, A comparison of alternative Kanban control mechanisms. II. Experiment results’, IIE Trans, 27, 151, 10.1080/07408179508936727 Pettersen, 2009, Restricted work-in-process: a study of differences between Kanban and CONWIP, Int J Prod Econ, 118, 199, 10.1016/j.ijpe.2008.08.043 Takahashi, 2005, Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains, Int J Prod Econ, 93–94, 25, 10.1016/j.ijpe.2004.06.003 Bonvik, 2000, Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy, Int J Prod Res, 38, 2845, 10.1080/00207540050117332 Buzacott, 1992, A general approach for coordinating production in multiple-cell manufacturing systems, Prod Oper Manage, 1, 34, 10.1111/j.1937-5956.1992.tb00338.x Bonvik, 1997, A comparison of production line control mechanisms, Int J Prod Res, 35, 789, 10.1080/002075497195713 Wang Y., Cao J., Kong L.. Hybrid Kanban/CONWIP control system simulation and optimization based on theory of constraints. In: Conference proceedings on intelligent computing and intelligent systems, IEEE international conference, Shanghai, Vol. 2. 2009. p. 666–70. Gaury, 2000, An evolutionary approach to select a pull system among Kanban, CONWIP and hybrid, J Intell Manuf, 11, 157, 10.1023/A:1008938816257 Gaury, 2001, A methodology to customize pull control systems, J Oper Res Soc, 52, 789, 10.1057/palgrave.jors.2601153 Geraghty, 2004, A comparison of hybrid push/pull and CONWIP/pull production inventory control policies, Int J Prod Econ, 91, 75, 10.1016/S0925-5273(03)00210-X Hodgson, 1991, Optimal hybrid push/pull control strategies for a parallel multi-stage system: Part I, Int J Prod Res, 29, 1279, 10.1080/00207549108930133 Hodgson, 1991, Optimal hybrid push/pull control strategies for a parallel multi-stage system: Part II, Int J Prod Res, 29, 1453, 10.1080/00207549108948022 Onyeocha C.E., Khoury J., Geraghty J.. Evaluation of the effect of erratic demand on a multi-product Basestock Kanban-CONWIP control strategy. In: Proceedings of the 9th conference on stochastic models of manufacturing and service operations, Kloster Seeon. 2013. Baynat, 2002, Multi-product Kanban-like control systems, Int J Prod Res, 40, 4225, 10.1080/00207540210146198 Onyeocha C.E., Geraghty J.. A modification of the hybrid Kanban CONWIP production control strategy for multi-product manufacturing systems. In: IMC29: International manufacturing conference proceedings, University of Ulster, Belfast, UK. 2012. Akturk, 1999, An overview of design and operational issues of Kanban systems, Int J Prod Res, 37, 3859, 10.1080/002075499189808 Hum, 1998, JIT scheduling rules: a simulation evaluation, Omega, 26, 381, 10.1016/S0305-0483(97)00066-2 Feng, 2012, Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers, Int J Prod Res, 50, 7479, 10.1080/00207543.2011.653455 Renna, 2013, Dynamic card control strategy in pull manufacturing systems, Int J Comput Integr Manuf, 26, 881, 10.1080/0951192X.2013.799783 Bard, 1991, Determining the number of Kanbans in a multi-product, multi-stage production system, Int J Prod Res, 29, 881, 10.1080/00207549108930108 Ajorlou, 2013, Artificial bee colony algorithm for CONWIP production control system in a multi-product multi-manufacturing process manufacturing environment, J Intell Manuf, 24, 1145, 10.1007/s10845-012-0646-5 Satyam, 2008, Performance evaluation of a multi-product system under CONWIP control, IIE Trans, 40, 252, 10.1080/07408170701488086 Duenyas, 1994, A simple release policy for networks of queues with controllable inputs, Oper Res, 42, 1162, 10.1287/opre.42.6.1162 Ryan, 2000, Determining inventory levels in a CONWIP controlled job shop, IIE Trans, 32, 105, 10.1080/07408170008963883 Ryan, 2005, Allocating work in process in multi-product CONWIP system with lost sales, Int J Prod Res, 43, 223, 10.1080/0020754042000268875 Khojasteh, 2015, Selection of a pull production control system in multi-stage production processes, Int J Prod Res, 10.1080/00207543.2014.1001530 Huang, 2014, A simulation study of CONWIP assembly with multi-loop in mass production, multi-products and low volume and OKP environments, Int J Prod Res Onyeocha, 2014, An investigation of pull control strategies and production authorisation cards in a multi-product plant in the presence of environmental variability, Comput Sci Appl, 1, 67 Onyeocha, 2013, A comparison of Kanban-like control strategies in a multi-product manufacturing system under erratic demand, 2730 Olaitan, 2013, Evaluation of production control strategies for negligible-setup, multi-product, serial lines with consideration for robustness, J Manuf Technol Manage, 24, 331, 10.1108/17410381311318864 Krishnamurthy, 2004, Re-examining the performance of MRP and Kanban material control strategies for multi-product flexible manufacturing systems, Int J Flex Manuf Syst, 16, 123, 10.1023/B:FLEX.0000044837.86194.19 Kernan B., Geraghty J.. A multi-objective genetic algorithm for extend. In: Proceedings of the first Irish workshop on simulation in manufacturing, services and logistics, Limerick. 2004. p. 83–92. Khojasteh-Ghamari, 2009, A performance comparison between Kanban and CONWIP controlled assembly systems, J Intell Manuf, 20, 751, 10.1007/s10845-008-0174-5 Geraghty, 2005, A review and comparison of hybrid and pull-type production control strategies, OR Spectrum, 27, 435, 10.1007/s00291-005-0204-z Koulouriotis, 2010, Simulation optimisation of pull control policies for serial manufacturing lines and assembly manufacturing systems using genetic algorithms’, Int J Prod Res, 48, 2887, 10.1080/00207540802603759 Nelson, 2001, Simple procedures for selecting the best simulated system when the number of alternatives is large, Oper Res, 49, 950, 10.1287/opre.49.6.950.10019