A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
Tóm tắt
Từ khóa
Tài liệu tham khảo
Bandelloni M, Tucci M, Rinaldi R (1994) Optimal resource leveling using non-serial dynamic programming. EJOR 78: 162–177
Boctor FF (1994) Heuristics for solving projects with resource restrictions and several resource-duration modes. Intern J Prod Res 31: 2547–2558
Brinkmann K, Neumann K (1996) Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: the resource-levelling and the minimum projectduration problems. J Decision Systems 5: 129–155
Carravilla MA, de Sousa JP (1995) Hierarchical production planning in make-to-order company: A case study. EJOR 86: 43–56
Dauzère-Pérez S, Lasserre J-B (1994) Integration of lot sizing and scheduling decisions in a job-shop. EJOR 75: 413–426
Demeulemeester EL (1995) Minimizing resource availability costs in time-limited project networks. Mgmt Sci 41: 1590–1598
Demeulemeester EL, Herroelen WS (1992) A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Mgmt Sci 33: 1803–1818
Dempster MAH, Fisher ML, Jansen L, Lageweg BJ, Lenstra JK, Rinnooy Kan AHG (1981) Analytical evaluation of hierarchical planning systems. Oper Res 29: 707–716
Drexl A, Eversheim W, Grempe R, Esser H (1994a) CIM im Werkzeugmaschinenbau — Der Prisma-Montageleitstand. ZfbF 46: 279–295
Drexl A, Fleischmann B, Günther H-O, Stadtler H, Tempelmeier H (1994b) Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme. ZfbF 46: 1022–1045
Franck B (1996) Empirische Untersuchungen von Prioritätsregeln für die ressourcenbeschränkte Projektplanung mit zeitlichen Minimal- and Maximalabständen. In: Kleinschmidt P, Bachem A, Derigs U, Fischer D, Leopold-Wildburger U, Möhring R (eds) Operations Research Proceedings 1995. Springer, Berlin, pp 144–149
Günther H-O (1992) Netzplanorientierte Auftragsterminierung bei offener Fertigung. ORS 14: 229–240
Günther H-O, Tempelmeier H (1995) Produktion und Logistik. Springer, Berlin
Hax AC, Meal HC (1975) Hierarchical integration of production planning and scheduling. In: Geisler M (ed) Logistics, TIMS Studies in Management Science, Vol. 1. Elsevier, Amsterdam, pp 53–69
Helber S (1994) Kapazitätsorientierte Losgrößenplanung in PPS-Systemen. Poeschel, Stuttgart
Hurink J, Jurisch B, Thole M (1994) Tabu search for the job shop scheduling problem with multi-purpose machines. ORS 15: 205–215
Konz H-J (1989) Steuerung der Standplatzmontage komplexer Produkte. Doctoral Dissertation, RWTH Aachen
Lambrecht MR, Vanderveken H (1979) Production scheduling and sequencing for multi-stage production systems. ORS 1: 103–114
Lasserre J-B (1992) An integrated model for job-shop planning and scheduling. Mgmt Sci 38: 1201–1211
Leachman RC (1983) Multiple resource leveling in construction systems through variation of activity intensities. Nav Res Log Quart 30: 187–198
Möhring RH (1984) Minimizing costs of resource requirements in project networks subject to a fixed completion time. Oper Res 32: 89–120
Nahmias S (1993) Production and Operations Analysis. Irwin, Homewood
Neumann K, Morlock M (1993) Operations Research. Carl Hanser, München
Neumann K, Schwindt C (1995) Projects with minimal and maximal time lags: construction of activity-on-node networks and applications. WIOR Report-447, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe
Neumann K, Zhan J (1995) Heuristics for the minimum project duration problem with minimal and maximal time lags under fixed resource contraints. J Intell Manufact 6: 145–154
Pinedo M (1995) Scheduling. Prentice Hall, Englewood Cliffs
Schneeweiß C (1992) Planung 2 — Konzepte der Prozeß- und Modellgestaltung. Springer, Berlin
Schneeweiß C (1994) Elemente einer Theorie hierarchischer Planung. ORS 16: 161–168
Schneeweiß C, Söhner V (1995) Ein hierarchisch integriertes Konzept zur Produktionsplanung und -Steuerung. Discussion Paper No. 54, Lehrstuhl für Betriebswirtschaftslehre und Unternehmensforschung, Universität Mannheim
Schwindt C (1997) A simulated-based comparison of the shifting bottleneck procedure with the algorithm of Giffler and Thompson for the job shop problem. Submitted to ORS
Serafini P, Speranza MG (1994) A decomposition approach for a resource constrained scheduling problem. EJOR 75: 112–135
Sprecher A (1994) Resource-Constrained Project Scheduling. Lecture Notes in Economics and Mathematical Systems Vol. 409. Springer, Berlin
Stadtler H (1996) Hierarchische Produktionsplanung. In: Kern W, Schröder H-H, Weber J (eds) Handwörterbuch der Produktionswirtschaft. 2. Auflage. Schäffer-Poeschel, Stuttgart
Tempelmeier H, Derstroff M (1993) Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur. ORS 15: 63–73