A Pareto archive particle swarm optimization for multi-objective job shop scheduling
Tóm tắt
Từ khóa
Tài liệu tham khảo
Arroyo, 2005, Genetic local search for multi-objective flow shop scheduling problems, European Journal of Operational Research, 167, 717, 10.1016/j.ejor.2004.07.017
Coello, 2004, Handling multiple objectives with particle swarm optimization, IEEE Transactions on Evolutionary Computation, 18, 256, 10.1109/TEVC.2004.826067
Deb, 1995, Simulated binary crossover for continuous search space, Complex Systems, 9, 115
Deb, 2002, A fast and elitist multi-objective genetic algorithms: NSGA-II, IEEE Transactions on Evolutionary Computation, 6, 182, 10.1109/4235.996017
Esquivel, 2002, Enhanced evolutionary algorithm for single and multi-objective optimization in job shop scheduling problem, Knowledge-Based System, 15, 13, 10.1016/S0950-7051(01)00117-4
Giffler, 1960, Algorithm for solving production scheduling problems, Operations Research, 8, 487, 10.1287/opre.8.4.487
Hu, 2003, Swarm intelligence for permutation optimization: A case study of N-queens problem, Proceedings of the IEEE Swarm Intelligence Symposium, 243
Kacem, 2002, Approach by localization and multi-objective evolutionary optimization for flexible job shop scheduling problems, IEEE Transactions on Systems, Man and Cybernetics, Part C, 32, 1, 10.1109/TSMCC.2002.1009117
Knowles, 2000, Approximating the non-dominated front using the Pareto archive evolutionary strategy, Evolutionary Computation, 8, 149, 10.1162/106365600568167
Lei, 2006, Crowding-measure-based multi-objective evolutionary algorithm for job shop scheduling, International Journal of Advanced Manufacturing Technology, 30, 112, 10.1007/s00170-005-0029-6
Ponnambalam, 2001, A multi-objective genetic algorithm for job shop scheduling, Production Planning and Control, 12, 764, 10.1080/09537280110040424
Sakawa, 2000, Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithm, European Journal of Operational Research, 120, 393, 10.1016/S0377-2217(99)00094-6
Xia, 2005, An effective hybridization approach for multi-objective flexible job-shop scheduling, Computers and Industrial Engineering, 48, 409, 10.1016/j.cie.2005.01.018
Zitzler, E., Laumanns, M., & Thiele, L. (2001). SPEA2: Improving the strength Pareto evolutionary algorithm. Swiss Federal Institute of Technology, Lausanne, Switzerland, Tech. Rep. TIK-Rep, 103.