The role of building information modeling (BIM) in delivering the sustainable building value

Moshood Olawale Fadeyi1
1Sustainable Infrastructure Engineering (Building Services) Programme, Singapore Institute of Technology, 10, Dover Drive, Singapore 138683, Singapore

Tài liệu tham khảo

Alashwal, 2011, Knowledge sharing in a fragmented construction industry: On the hindsight, Sci. Res. Essays, 6, 1530 Anumba, 1997, Concurrent engineering in design-build project, Constr. Manage. Econ., 15, 271, 10.1080/014461997373006 Astour, H., Franz, V. 2014. BIM-and simulation-based site layout planning, In Computing in Civil and Building Engineering, 291–298. Azhar, 2011, Building Information Modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry, Leadership Manage. Eng., 11, 241, 10.1061/(ASCE)LM.1943-5630.0000127 Azhar, S., Nadeem, A., Mok, J.Y.N., Leung, B.H.Y. 2008. Building Information Modelling (BIM): A new paradigm for visual interactive modelling and simulation for construction projects, First International Conference on Construction in Developing Countries (ICCIDC-1), Advancing and Integrating Construction Education, Research & Practice, August 4-5, 2008, Karachi, Pakistan. Ball, M., 1988. Rebuilding construction: Economic change in the British construction industry, Routledge. Barg, J.E., Ruparathna, R., Mendis, D., Hewage, K.N., 2014. Motivating workers in construction. J. Constr. Eng. Article ID 703084. Becerik-Gerber, 2012, BIM-enabled virtual and collaborative construction engineering and management, ASCE J. Prof. Issues Eng. Educ. Pract., 138, 234, 10.1061/(ASCE)EI.1943-5541.0000098 Becker, 2008, Fundamentals of performance-based building design, Build. Simul., 1, 356, 10.1007/s12273-008-8527-8 Capone, P., Getuli, V., Giusti, T. 2014. January. Constructability and safety performance based design: a design and assessment tool for the building process. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 31, p. 1). Vilnius Gediminas Technical University, Department of Construction Economics & Property. Chen, 2013, A framework for an automated and integrated project scheduling and management system, Autom. Constr., 35, 89, 10.1016/j.autcon.2013.04.002 Cheung, 2012, Early stage multi-level cost estimation for schematic BIM models, Autom. Constr., 27, 67, 10.1016/j.autcon.2012.05.008 Clevenger, 2013, Impact of BIM-enabled design-to-fabrication on building delivery, Pract. Period. Struct. Des. Constr., 19, 122, 10.1061/(ASCE)SC.1943-5576.0000176 Cox, A.W., Thompson, I. 1998. Contracting for business success, Thomas Telford. Dalkir, K. 2005. Knowledge management in theory and practice, Elsevier ISBN:0-7506-7864-X. Deng, 2016, Mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison, Autom. Constr., 67, 1, 10.1016/j.autcon.2016.03.006 Deshpande, 2014, A framework for a BIM-based knowledge management system, Procedia Eng., 85, 113, 10.1016/j.proeng.2014.10.535 Deshpande, 2014 Dossick, 2011, Messy talk and clean technology: communication, problem-solving and collaboration using Building Information Modelling, Eng. Project Organ. J., 1, 83, 10.1080/21573727.2011.569929 Dozzi, 1993 Dulaimi, 2002, Enhancing integration and innovation in construction, Build. Res. Inf., 30, 237, 10.1080/09613210110115207 Dutt, 2017, Modeling algae powered neighborhood through GIS and BIM integration, Energy Procedia, 105, 3830, 10.1016/j.egypro.2017.03.896 Egan, J. 1998, Rethinking Construction: Report of the Construction Task Force, London: HMSO. (Copy of report available on Constructing Excellence website: report. Accessed: 2 July 2017) El-Diraby, 2017, BIM-based collaborative design and socio-technical analytics of green buildings, Autom. Constr., 10.1016/j.autcon.2017.06.004 Gao, 2014, The Toyota Way model: an alternative framework for lean construction, Total Qual. Manage. Bus. Excellence, 25, 664, 10.1080/14783363.2013.820022 Grilo, 2010, Value proposition on interoperability of BIM and collaborative working environments, Autom. Constr., 19, 522, 10.1016/j.autcon.2009.11.003 Gupta, 2014, A conceptual framework to support solar PV simulation using an open-BIM data exchange standard, Autom. Constr., 37, 166, 10.1016/j.autcon.2013.10.005 Hallowell, 2009, Contemporary design-bid-build model, J. Constr. Eng. Manage., 135, 540, 10.1061/(ASCE)0733-9364(2009)135:6(540) Han, 2015, Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs, Autom. Constr., 53, 44, 10.1016/j.autcon.2015.02.007 Han, 2015, Formalized knowledge of construction sequencing for visual monitoring of work-in-progress via incomplete point clouds and low-LoD 4D BIMs, Adv. Eng. Inf., 29, 889, 10.1016/j.aei.2015.10.006 Han, 2012, Collision detection of building facility pipes and ducts based on BIM technology, Adv. Mater. Res., 346, 312, 10.4028/www.scientific.net/AMR.346.312 Haque, 2009, 266 Hardin, 2015 Hergunsel, M.F. 2011. Benefits of building information modeling for construction managers and BIM based scheduling, Master Thesis, Department of Civil Engineering, Worcester Polytechnic Institute, UK. Hindle, R.D. 1997. Two Construction Industry Characteristics That Are Hindering Its Development, In 1st International Conference on Construction Industry Development: Building the Future Together. National University of Singapore, December 9-11, pp. 324–331. Hindle, B. 2004. Construction: A colonised industry (Identifying the agent of retardation in construction process development), Globalisation and Construction, 441. Ho, 2016, Towards 3D-enabled urban land administration: Strategic lessons from the BIM initiative in Singapore, Land Use Policy, 57, 1, 10.1016/j.landusepol.2016.05.011 Howard, 1989, Computer integration: reducing fragmentation in AEC industry, J. Comput. Civil Eng., 3, 18, 10.1061/(ASCE)0887-3801(1989)3:1(18) Hu, X., Lu, M., AbouRizk, S. 2014. BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication, In Proceedings of the 2014 Winter Simulation Conference (pp. 3399–3410). IEEE Press. Hu, 2011, BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2, Dev. Site Trials Autom. Constr., 20, 167, 10.1016/j.autcon.2010.09.014 Isikdag, 2010, Two design patterns for facilitating building information model-based synchronous collaboration, Autom. Constr., 19, 544, 10.1016/j.autcon.2009.11.006 Jiang, L., Solnosky, R., Leicht, R.M. 2013, Virtual prototyping for construction review, 4th Construction Speciality Conference, May 29–June 1. Jupp, 2017, 4D BIM for environmental planning and management, Procedia Eng., 180, 190, 10.1016/j.proeng.2017.04.178 Kang, 2015, BIM perspective definition metadata for interworking facility management data, Adv. Eng. Inf., 29, 958, 10.1016/j.aei.2015.09.004 Kannan, 2013, Constructability assessment of climbing formwork systems using building information modeling, Procedia Eng., 64, 1129, 10.1016/j.proeng.2013.09.191 Kim, 2013, Generating construction schedules through automatic data extraction using open BIM (Building information modeling) technology, Autom. Constr., 35, 285, 10.1016/j.autcon.2013.05.020 Kim, M., Cheng, J.C.P., Sohn, H., Chang, C.C. 2015. A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning, Automation in Construction 49, Part B, 225–238. Kim, 2015, Developing a physical BIM library thermal energy simulation, Autom. Constr., 50, 16, 10.1016/j.autcon.2014.10.011 Kim, 2015, BIM-based decision-support method for master planning of sustainable large-scale developments, Autom. Constr., 58, 95, 10.1016/j.autcon.2015.07.003 König, M., Koch, C., Habenicht, I., Spieckermann, S. 2012. Intelligent BIM-based construction scheduling using discrete event simulation, In Simulation Conference (WSC), Proceedings of the 2012 winter (pp. 1–12). IEEE. Kota, 2014, Building Information Modeling (BIM)- based daylighting simulation and analysis, Energy Build., 81, 391, 10.1016/j.enbuild.2014.06.043 Kumar, 2015, BIM-based automated site layout planning framework for congested construction sites, Autom. Constr., 59, 24, 10.1016/j.autcon.2015.07.008 Laguela, 2013, Automatic thermographic and RGB texture of as-built BIM for energy rehabilitation purposes, Autom. Constr., 31, 230, 10.1016/j.autcon.2012.12.013 Laing, 2014, Integrating Rapid 3D Data Collection Techniques to Support BIM Design Decision Making, Procedia Environ. Sci., 22, 120, 10.1016/j.proenv.2014.11.012 Latham, 1994 Lee, 2012, User-centric knowledge representations based on ontology for AEC design collaboration, Comput. Aided Des., 44, 735, 10.1016/j.cad.2012.03.011 Lee, 2014, BIM and ontology-based approach for building cost estimation, Autom. Constr., 41, 96, 10.1016/j.autcon.2013.10.020 Leite, 2011, Analysis of modeling effort and impact of different levels of detail in building information models, Autom. Constr., 20, 601, 10.1016/j.autcon.2010.11.027 Lewis, J., Cheetham, D.W., 1993. The historical roots of current problems in building procurement, In the Proceedings of ARCOM 9th Conference, Oxford, pp 50–61. Lim, 1995, Construction productivity: issues encountered by contractors in Singapore, Int. J. Project Manage., 13, 51, 10.1016/0263-7863(95)95704-H Lin, 2013, 124249 Liu, 2015, BIM-based integrated approach for detailed construction scheduling under resource constraints, Autom. Constr., 53, 29, 10.1016/j.autcon.2015.03.008 Liu, R., Issa, R.R.A., 2012. 3D visualization of sub-surface pipelines in connection with the building utilities: Integrating GIS and BIM for facility management, In Computing in Civil Engineering, 341–348. Liu, 2017, Understanding effects of BIM on collaborative design and construction: An empirical study in China, Int. J. Project Manage., 35, 6866, 10.1016/j.ijproman.2016.06.007 Lou, 2017, Study on construction quality control of urban complex project based on BIM, Procedia Eng., 174, 668, 10.1016/j.proeng.2017.01.215 Lu, 2016, A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM), Int. J. Project Manag., 34, 3, 10.1016/j.ijproman.2015.09.004 Ma, 2014, BIM-based intelligent acquisition of construction information for cost estimation of building projects, Procedia Eng., 85, 358, 10.1016/j.proeng.2014.10.561 Mahbub, 2010, A total building performance approach to evaluating building acoustic performance, Archit. Sci. Rev., 53, 213, 10.3763/asre.2009.0032 Moon, 2014, Development of workspace conflict visualization system using 4D object of work schedule, Adv. Eng. Inf., 28, 50, 10.1016/j.aei.2013.12.001 Motawa, 2013, A knowledge-based BIM system for building maintenance, Autom. Constr., 29, 173, 10.1016/j.autcon.2012.09.008 Nawari, 2012, BIM standard in off-site construction, J. Archit. Eng., 18, 107, 10.1061/(ASCE)AE.1943-5568.0000056 Nawi, 2009 Nical, 2016, Enhnacing facility management using BIM 6D, Procedia Eng., 164, 299, 10.1016/j.proeng.2016.11.623 Oyedele, 2012, Total building performance approach in building evaluation: Case study of an office building in Singapore, ASCE J. Energy Eng., 138, 25, 10.1061/(ASCE)EY.1943-7897.0000056 Park, 2013, A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template, Autom. Constr., 33, 61, 10.1016/j.autcon.2012.09.010 Poirier, 2015, Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research, Autom. Constr., 58, 74, 10.1016/j.autcon.2015.07.002 Popov, 2010, The use of a virtual building design and construction model for developing an effective project concept in 5D environment, Autom. Constr., 19, 357, 10.1016/j.autcon.2009.12.005 Porter, 2014, Breaking into BIM: Performing static and dynamic security analysis with the aid of BIM, Autom. Constr., 40, 84, 10.1016/j.autcon.2013.12.002 Raviv, G., Shapira, A., Sacks, R. 2012. Relationships between methods for constructability analysis during design and constructability failures in projects, In Construction Research Congress 2012, Construction Challenges in a Flat World, 515–524. Richardson, D. 2014, Productivity in the construction industry, Australia Institute. Sanguinetti, 2012, General system architecture for BIM: An integrated approach for design and analysis, Adv. Eng. Inf., 26, 317, 10.1016/j.aei.2011.12.001 Shen, 2012, Building information modeling-based user activity simulation and evaluation method for improving designer-user communications, Autom. Constr., 21, 148, 10.1016/j.autcon.2011.05.022 Singh, 2011, A theoretical framework of a BIM-based multi-disciplinary collaboration platform, Autom. Constr., 20, 134, 10.1016/j.autcon.2010.09.011 Smith, 2014, BIM & the 5D Project Cost Manager, Procedia – Soc. Behav. Sci., 119, 475, 10.1016/j.sbspro.2014.03.053 Solihin, 2017, Multiple representation approach to achieve high-performance spatial queries of 3D BIM data using a relational database, Autom. Constr., 81, 369, 10.1016/j.autcon.2017.03.014 Song, 2012, Development of a BIM-based structural framework optimization and simulation system for building construction, Comput. Ind., 63, 895, 10.1016/j.compind.2012.08.013 Sulankivi, K., Tauriainen, M., Kiviniemi, M. 2014. Safety aspect in constructability analysis with BIM, Proceeding of CIB W099: Achieving Sustainable Construction Health and Safety, Lund, Sweden, 2-3 June. Tam, 2005, Use of prefabrication to minimize construction waste-a case study approach, Int. J. Constr. Manage., 5, 91 Tam, 2007, Towards adoption of prefabrication in construction, Build. Environ., 42, 3642, 10.1016/j.buildenv.2006.10.003 Tauriainen, M., Puttonen, J., Saari, A., Laakso, P., Forsblom, K. 2014. The assessment of constructability: BIM cases. eWork and eBusiness in Architecture, Engineering and Construction, 55–61. Volk, 2014, Building information modeling (BIM) for existing buildings – Literature review and future needs, Autom. Constr., 38, 109, 10.1016/j.autcon.2013.10.023 Waara, 2006, Price and nonprice criteria for contractor selection, J. Constr. Eng. Manage., 132, 797, 10.1061/(ASCE)0733-9364(2006)132:8(797) Wang, J., Hou, L., Wang, Y., Wang, X., Simpson, I. 2015. Integrating Augmented Reality into Building Information Modeling for Facility Management Case Studies. Building Information Modeling, 279–304. Wang, 2014, Integrating building information models with construction process simulations for project scheduling support, Autom. Constr., 37, 68, 10.1016/j.autcon.2013.10.009 Wang, 2015, A BIM-based approach for automated tower crane layout planning, Autom. Constr., 59, 168, 10.1016/j.autcon.2015.05.006 Wetzel, 2015, The use of a BIM-based framework to support safe facility management processes, Autom. Constr., 60, 12, 10.1016/j.autcon.2015.09.004 Womack and Jones 2015. Lean solutions: How companies and customers can create value and wealth together. Free Press, ISBN 978-0-7432-7778-5. Wong, 2003, Total building performance evaluation of academic institution in Singapore, Build. Environ., 38, 161, 10.1016/S0360-1323(02)00021-5 Wong, 2014, Implementing ‘BEAM Plus’ for BIM-based sustainability analysis, Autom. Constr., 44, 163, 10.1016/j.autcon.2014.04.003 Wu W, Issa R (2012) BIM-Enabled commissioning and Handover. Computing in Civil Engineering, June, 237-244 Xue, 2007, Coordination mechanisms for construction supply chain management in the Internet environment, Int. J. Project Manage., 25, 150, 10.1016/j.ijproman.2006.09.006 Yamamura, S., Fan, L, Suzuki, Y, 2017. Assessment of Urban Energy Performance through Integration of BIM and GIS for Smart City Planning Procedia Engineering 180 1462–1472. Ying, Z. 2005. Significant factors affecting construction productivity (Doctoral dissertation), national University of Singapore Yu, 2016, A BIM-based dynamic model for site material supply, Procedia Eng., 164, 526, 10.1016/j.proeng.2016.11.654 Zhang, 2015, Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA), Autom. Constr., 52, 29, 10.1016/j.autcon.2015.02.005 Zhang, 2011, BIM – and 4D – based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1 Principles and methodologies, Autom. Constr., 20, 155, 10.1016/j.autcon.2010.09.013 Zhang, 2013, Building information modeling (BIM) and safety: Automatic safety checking of construction models and schedules, Autom. Constr., 29, 183, 10.1016/j.autcon.2012.05.006 Zhang, 2015, BIM-based fall hazard identification and prevention in construction safety planning, Safety Sci., 72, 31, 10.1016/j.ssci.2014.08.001 Zolfagharian, S. 2016. A knowledge-based BIM exchange model for constructability assessment of commercial building designs (Doctoral dissertation, Georgia Institute of Technology).