Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function

Journal of Scheduling - Tập 14 - Trang 539-540 - 2011
Boris Detienne1, Stéphane Dauzère-Pérès2, Claude Yugma2
1Laboratoire d’informatique d’Avignon, Université d’Avignon et des pays de Vaucluse, Avignon Cedex 9, France
2Department of Manufacturing Sciences and Logistics CMP, École des Mines de Saint-Étienne, Gardanne, France

Tài liệu tham khảo

Curry, J., & Peters, B. (2005). Rescheduling parallel machines with stepwise increasing tardiness. International Journal of Production Research, 43(15), 3231–3246. Detienne, B., Dauzère-Pérès, S., & Yugma, C. (2009). Scheduling inspection operations subject to a fixed production schedule. In Proceedings of the 4th multidisciplinary international conference on scheduling: theory and applications (MISTA 2009) (pp. 581–593). Sahin, G. (2006). New combinatorial approaches for solving railroad planning and scheduling problems. PhD Thesis, University of Florida, FL, USA.