An investigation of the applicability of expert systems to job shop scheduling

International Journal of Man-Machine Studies - Tập 32 - Trang 203-213 - 1990
Sabah U. Randhawa1, Edward D. McDowell1
1Department of Industrial & Manufacturing Engineering, Oregon State University Carvallis, Oregon 97331, USA

Tài liệu tham khảo

Abou-Zied, 1975, Manufacturing system analysis and evaluation for group technology application Aggarwal, 1985, MRP, JIT, OPT, FMS? Making sense of production operations systems, Harvard Business Review, 38, 8 Alexander, 1984, A Framework for the Development of an Expert System for Manufacturing Process Control Baker, 1985, Scheduling the general job shop, Management Science, 31, 594, 10.1287/mnsc.31.5.594 Bellman, 1982 Bettman, 1970, Information processing models of consumer behavior, Journal of Marketing Research, VII, 370, 10.2307/3150297 Bowman, 1959, The schedule-sequence problem, Operations Research, 7, 621, 10.1287/opre.7.5.621 Braunstein, 1967, An information processing model of the aircraft accident investigator, Human Factors, 9, 61, 10.1177/001872086700900107 Buzacott, 1985, On approximate queuing models of dynamic job shops, Management Science, 31, 870, 10.1287/mnsc.31.7.870 Buzacott, 1986, Flexible manufacturing systems: a review of analytical models, Management Science, 32, 890, 10.1287/mnsc.32.7.890 Carrol, 1977, Judgments about crime and the criminal: A model and a method for investigating parole decisions, 10.1007/978-1-4684-2562-8_8 Chiodini, 1986, A knowledge-based system for dynamic manufacturing replanning, symposium on real-time optimization in automated manufacturing facilities, NBS, 357 1988 Clarkson, 1962 Conway, 1986 Cook, 1975, Computer-managed parts manufacture, Scientific American, 232, 22, 10.1038/scientificamerican0275-22 Copi, 1986 Ericsson, 1975 Ericsson, 1980, Verbal reports as data, Psychological Review, 87, 215, 10.1037/0033-295X.87.3.215 Fox, 1983, Constraint-Directed Search: A Case Study of Job Shop Scheduling, Carnegie-Mellon University Technical Report Fox, 1983, ISIS: A Constraint-Directed Reasoning Approach to Job Shop Scheduling, Carnegie-Mellon University Technical Report Frost, 1986 Goldratt, 1980, Optimized Production Timetable: A revolutionary program for industry Guttenplan, 1978 Jackson, 1963, Job shop-like queuing systems, Management Science, 10, 131, 10.1287/mnsc.10.1.131 Jacobs, 1983, The OPT scheduling system: a review of a new scheduling system, Production and Inventory Management, 24, 47 Jacoby, 1977, The emerging behavior process technology in consumer decision-making research Johnson, 1978 Kleinmuntz, 1968, The processing of clinical information by man and machine Manne, 1960, On the job shop scheduling problem, Operations Research, 8, 219, 10.1287/opre.8.2.219 Maule, 1985, Cognitive Approaches to Decision Making in Behavioral Decision Making Maxwell, 1983, A modeling framework for planning and control of production in discrete parts manufacturing and assembly systems, Interfaces, 13, 92, 10.1287/inte.13.6.92 Montgomery, 1976, A study of intransitive preference using a thinking aloud procedure Nilsson, 1980 Nisbeit, 1977, Telling more than we can know: verbal reports on mental processes, Psychological Review, 84, 231, 10.1037/0033-295X.84.3.231 Panwalkar, 1977, A surveying of scheduling rules, Operations Research, 25, 45, 10.1287/opre.25.1.45 Papas, 1986, 127 Payne, 1976, Task complexity and contingent processing in decision making. An information search and protocol analysis, Organizational Behavior and Human Performance, 16, 366, 10.1016/0030-5073(76)90022-2 Payne, 1977 Payne, 1978, Exploring pre-decisional behavior: an alternative approach to decision research, Organizational Behavior and Human Performance, 22, 17, 10.1016/0030-5073(78)90003-X Rich, 1983 Russo, 1978, Eye fixations can save the world: a critical evaluation and a comparison between eye fixations and other information processing technologies, vol. 5 Saboo, 1985 Simon, 1979, Information processing models of cognition, Annual Review of Psychology, 30, 363, 10.1146/annurev.ps.30.020179.002051 Sowa, 1984 Stecke, 1983, Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems, Management Science, 29, 273, 10.1287/mnsc.29.3.273 Stecke, 1981, Loading and control policies for a flexible manufacturing system, International Journal of Production Research, 19, 481, 10.1080/00207548108956679 Tapscott, 1985 Thomas, 1977 Townsend, 1983, Artificial Intelligence Techniques for Industrial Applications in Job Shop Scheduling U.S. Dept. of Commerce, Bureau of Economic Analysis, 1984, Business Statistics Wagner, 1959, An integer linear-programming model for machine scheduling, Naval Research Logistics Quarterly, 6, 131, 10.1002/nav.3800060205 Wason, 1975, Dual processing in reasoning, Cognition, 3, 141, 10.1016/0010-0277(74)90017-1 White, 1988, Simulation software systems, PCModel: User's Guide. Jose, CA Whiteside, 1984, Unsnarling industrial production: why top management is starting to care, International Management, 39, 20 Wilhelm, 1986, A model to approximate transient performance of the flowshop, International Journal of Production Research, 24, 33, 10.1080/00207548608919709 Wilhelm, 1986, An approach for modeling transient material flows in robotized manufacturing cells, Material Flow, 3 Wilkens, 1973 Wright, 1974, On the direct monitoring of cognitive response to advertising