Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
Tài liệu tham khảo
Beasley, 1990, OR-Library: Distributing test problems by electronic mail, Journal of the Operational Research Society, 41, 1069, 10.1057/jors.1990.166
Campbell, 1970, A heuristic algorithm for the n-job, m-machine sequencing problem, Management Science, 16, B630, 10.1287/mnsc.16.10.B630
Dannenbring, 1977, An evaluation of flowshop sequence heuristics, Management Science, 23, 1174, 10.1287/mnsc.23.11.1174
Dileepan, 1998, Bicriterion static scheduling research for a single machine, OMEGA, 16, 39
Ehrgott, 2000, A survey and annotated bibliography of multiobjective combinatorial optimization, OR Spektrum, 22, 425, 10.1007/s002910000046
Garey, 1976, The complexity of flowshop and jobshop scheduling, Mathematics of Operations Research, 1, 117, 10.1287/moor.1.2.117
Gupta, 1972, Heuristic algorithms for multistage flowshop scheduling problem, AIIE Transactions, 4, 11, 10.1080/05695557208974823
Gupta, 1971, An optimality criterion for flowshop schedules, AIIE Transactions, 3, 199, 10.1080/05695557108974807
Ho, 1995, Flowshop sequencing with mean flowtime objective, European Journal of Operational Research, 81, 571, 10.1016/0377-2217(93)E0353-Y
MacCarthy, 1993, Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling, International Journal of Production Research, 31, 59, 10.1080/00207549308956713
Miyazaki, 1978, An adjacent pairwise approach to the mean flowtime scheduling problem, Journal of the Operations Research Society of Japan, 21, 287, 10.15807/jorsj.21.287
Nagar, 1995, Multiple and bicriteria scheduling: A literature survey, European Journal of Operational Research, 81, 88, 10.1016/0377-2217(93)E0140-S
Nawaz, 1983, A heuristic algorithm for the m-machine, n-job flowshop sequencing problem, OMEGA, 11, 91, 10.1016/0305-0483(83)90088-9
Palmer, 1965, Sequencing jobs through a multistage process in the minimum total time: A quick method of obtaining a near-optimum, Operational Research Quarterly, 16, 101, 10.1057/jors.1965.8
Rajendran, 1992, Two-stage flowshop scheduling problem with bicriteria, Journal of the Operational Research Society, 43, 871, 10.1057/jors.1992.126
Rajendran, 1993, Heuristic algorithm for scheduling in a flowshop to minimize total flowtime, International Journal of Production Economics, 29, 65, 10.1016/0925-5273(93)90024-F
Rajendran, 1994, A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria, International Journal of Production Research, 32, 2541, 10.1080/00207549408957083
Rajendran, 1995, Heuristics for scheduling in flowshop with multiple objectives, European Journal of Operational Research, 82, 540, 10.1016/0377-2217(93)E0212-G
Rajendran, 1991, An efficient heuristic approach to the scheduling of jobs in a flowshop, European Journal of Operational Research, 61, 318, 10.1016/0377-2217(92)90361-C
Rinnooy Kan, 1976
Sayin, 1999, A bicriteria approach to the two-machine flow shop scheduling problem, European Journal of Operational Research, 113, 435, 10.1016/S0377-2217(98)00009-5
Selen, 1986, An integer goal programming formulation of a flow shop scheduling problem, Journal of the Operational Research Society, 37, 1121, 10.1057/jors.1986.197
Sivrikaya-Serifoglu, 1998, A bicriteria two-machine permutation flowshop problem, European Journal of Operational Research, 107, 414, 10.1016/S0377-2217(97)00338-X
Sridhar, 1996, Scheduling in flowshop and cellular manufacturing systems with multiple objectives – a genetic algorithmic approach, Production Planning and Control, 7, 374, 10.1080/09537289608930365
Taillard, 1990, Some efficient methods for the flow shop sequencing problem, European Journal of Operational Research, 47, 65, 10.1016/0377-2217(90)90090-X
Taillard, 1993, Benchmark for basic scheduling problems, European Journal of Operational Research, 64, 278, 10.1016/0377-2217(93)90182-M
Turner, 1987, Comparison of heuristics for flowshop sequencing, OMEGA, 15, 75, 10.1016/0305-0483(87)90054-5
Wilson, 1989, Alternative formulation of a flow shop scheduling problem, Journal of the Operational Research Society, 40, 395, 10.1057/palgrave.jors.0400410
Woo, 1998, A heuristic algorithm for mean flowtime objective in flowshop scheduling, Computers and Operations Research, 25, 175, 10.1016/S0305-0548(97)00050-6