On the fixed interval due-date scheduling problem

Discrete Applied Mathematics - Tập 68 - Trang 101-117 - 1996
Chung-yee Lee1, Chung-Lun Li2
1Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL 32611, USA
2John M. Olin School of Business, Washington University, St. Louis, MO 63130, USA

Tài liệu tham khảo

Ahmadi, 1986, Single machine scheduling to minimize earliness subject to deadlines Ahmadi, 1986, Just-in-time scheduling in single machine systems Ahmadi, 1992, Minimizing job idleness in deadline constrained environments, Oper. Res., 40, 972, 10.1287/opre.40.5.972 Baker, 1990, Sequencing with earliness and tardiness penalties: a review, Oper. Res., 38, 22, 10.1287/opre.38.1.22 Chand, 1988, Single machine scheduling to minimize weighted earliness subject to no tardy jobs, European J. Oper. Res., 34, 221, 10.1016/0377-2217(88)90356-6 Chhajed, 1995, A fixed interval due-date scheduling problem with earliness and due-date costs, European J. Oper. Res., 84, 533, 10.1016/0377-2217(93)E0291-5 Garey, 1979 Lee, 1991, Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date, Comput. and Oper. Res., 18, 379, 10.1016/0305-0548(91)90098-C Matsuo, 1988, The weighted total tardiness problem with fixed shipping times and overtime utilization, Oper. Res., 36, 293, 10.1287/opre.36.2.293 Pinedo, 1995 Schneeberger, 1984, Job shop scheduling in pull type production environments