A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return

Applied Mathematical Modelling - Tập 37 - Trang 4165-4176 - 2013
Saman Hassanzadeh Amin1, Guoqing Zhang1
1Department of Industrial and Manufacturing Systems Engineering, University of Windsor, Windsor, ON, Canada N9B 3P4

Tài liệu tham khảo

Cooper, 1997, Supply chain management: more than a new name for logistics, Int. J. Logist. Manage., 8, 1, 10.1108/09574099710805556 Abdallah, 2012, Green supply chains with carbon trading and environmental sourcing: Formulation and life cycle assessment, Appl. Math. Model., 36, 4271, 10.1016/j.apm.2011.11.056 Melo, 2009, Facility location and supply chain management – a review, Eur. J. Oper. Res., 196, 401, 10.1016/j.ejor.2008.05.007 Guide, 2009, The evolution of closed-loop supply chain research, Oper. Res., 57, 10, 10.1287/opre.1080.0628 Fleischmann, 2001, The impact of product recovery on logistics network design, Prod. Oper. Manage., 10, 156, 10.1111/j.1937-5956.2001.tb00076.x Amin, 2012, An integrated model for closed loop supply chain configuration and supplier selection: multi-objective approach, Expert Syst. Appl., 39, 6782, 10.1016/j.eswa.2011.12.056 Salema, 2007, An optimization model for the design for a capacitated multi-product reverse logistics network with uncertainty, Eur. J. Oper. Res., 179, 1063, 10.1016/j.ejor.2005.05.032 Davis, 1993, Effective supply chain management, Sloan Manage. Rev., 34, 35 Snyder, 2006, Facility location under uncertainty: a review, IIE Trans., 38, 537, 10.1080/07408170500216480 Zhang, 2009, Optimal acquisition policy with quantity discounts and uncertain demands, Int. J. Prod. Res., 47, 2409, 10.1080/00207540701678944 Jayaraman, 1999, A closed-loop logistics model for remanufacturing, J. Oper. Res. Soc., 50, 497, 10.1057/palgrave.jors.2600716 Kannan, 2009, Analysis of closed loop supply chain using genetic algorithm and particle swarm optimization, Int. J. Prod. Res., 47, 1175, 10.1080/00207540701543585 Kannan, 2010, A genetic algorithm approach for solving a closed loop supply chain model: a case of battery recycling, Appl. Math. Model., 34, 655, 10.1016/j.apm.2009.06.021 Amin, 2012, A proposed mathematical model for closed-loop network configuration based on product life cycle, Int. J. Adv. Manuf. Technol., 58, 791, 10.1007/s00170-011-3407-2 Fleischmann, 1997, Quantitative models for reverse logistics: a review, Eur. J. Oper. Res., 103, 1, 10.1016/S0377-2217(97)00230-0 Rubio, 2008, Characteristics of the research on reverse logistics (1995–2005), Int. J. Prod. Res., 46, 1099, 10.1080/00207540600943977 Akcali, 2011, Quantitative models for inventory and production planning in closed-loop supply chains, Int. J. Prod. Res., 49, 2373, 10.1080/00207541003692021 Krikke, 2003, Concurrent product and closed-loop supply chain design with an application to refrigerators, Int. J. Prod. Res., 41, 3689, 10.1080/0020754031000120087 Pati, 2008, A goal programming model for paper recycling system, Omega, 36, 405, 10.1016/j.omega.2006.04.014 Du, 2008, A bi-objective reverse logistics network analysis for post-sale service, Comput. Oper. Res., 35, 2617, 10.1016/j.cor.2006.12.020 Gupta, 2009, A goal programming model for the operation of closed-loop supply chains, Eng. Optim., 41, 713, 10.1080/03052150902802242 Pishvaee, 2010, A memetic algorithm for bi-objective integrated forward/reverse logistics network design, Comput. Oper. Res., 37, 1100, 10.1016/j.cor.2009.09.018 Francas, 2009, Manufacturing network configuration in supply chains with product recovery, Omega, 37, 757, 10.1016/j.omega.2008.07.007 Pishvaee, 2009, A stochastic optimization model for integrated forward/reverse logistics network design, J. Manuf. Syst., 28, 107, 10.1016/j.jmsy.2010.05.001 Lee, 2009, Dynamic network design for reverse logistics operations under uncertainty, Transport. Res. Part E, 45, 61, 10.1016/j.tre.2008.08.002 Pishvaee, 2010, A possibilistic programming approach for closed-loop supply chain network design under uncertainty, Fuzzy Sets Syst., 161, 2668, 10.1016/j.fss.2010.04.010 Shi, 2010, Coordinating production and recycling decision with stochastic demand and return, J. Syst. Sci. Syst. Eng., 19, 385, 10.1007/s11518-010-5147-5 Wang, 2010, Resolution of an uncertain closed-loop logistics model: an application to fuzzy linear programs with risk analysis, J. Environ. Manage., 91, 2148, 10.1016/j.jenvman.2010.05.009 Shi, 2011, Optimal production planning for a multi-product closed loop system with uncertain demand and return, Comput. Oper. Res., 38, 641, 10.1016/j.cor.2010.08.008 Pishvaee, 2011, A robust optimization approach to closed-loop supply chain network design under uncertainty, Appl. Math. Model., 35, 637, 10.1016/j.apm.2010.07.013 S.H. Amin, G. Zhang, A three-stage model for closed-loop supply chain configuration under uncertainty, Int. J. Prod. Res. (In press). Vahdani, 2012, Reliable design of a forward/reverse logistics network under uncertainty: a robust-M/M/c queuing model, Transport. Res. Part E, 48, 1152, 10.1016/j.tre.2012.06.002 Ruan, 2011, Environmental friendly automated line for recovering the cabinet of waste refrigerator, Waste Manage., 31, 2319, 10.1016/j.wasman.2011.06.004 Kemp, 2008, The diffusion of clean technologies: a review with suggestions for future diffusion analysis, J. Clean. Prod., 16, S14, 10.1016/j.jclepro.2007.10.019 Collette, 2003 Wadhwa, 2007, Vendor selection in outsourcing, Comput. Oper. Res., 34, 3725, 10.1016/j.cor.2006.01.009 Birge, 1997 Al-Othman, 2008, Supply chain optimization of petroleum organization under uncertainty in market demands and prices, Eur. J. Oper. Res., 189, 822, 10.1016/j.ejor.2006.06.081