Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong–Zhuhai–Macao Bridge

Tunnelling and Underground Space Technology - Tập 50 - Trang 171-177 - 2015
Zhi-nan Hu1, Yong-li Xie2, Jun Wang2
1School of Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043, PR China
2Institute of Highway, Chang’an University, Xi’an 710064, PR China

Tài liệu tham khảo

Chen, K.Q., Peng, S., Wu, W.G., et al., 2012. Model test of immersed tunnel element in towing tank in winds, waves and currents. In: Proc. Twenty-second Int. Offshore Polar Eng. Conf., pp. 831–836. CCCC second flight engineering survey & design institute Co., Ltd. (CCCC SFES&DI), 2009. Geological investigation report on immersed tunnel of Hong Kong–Zhuhai–Macao Bridge in construction documents design phase. Guangzhou (in Chinese). Chen, 2002 Grantz, 2001, Immersed tunnel settlements–Parts 1: nature of settlements, Tunn. Undergr. Sp. Technol., 16, 195, 10.1016/S0886-7798(01)00039-6 Grantz, 2001, Immersed tunnel settlements–Parts 2: case histories, Tunn. Undergr. Sp. Technol., 16, 203, 10.1016/S0886-7798(01)00040-2 Hashash, 2001, Seismic design and analysis of underground structures, Tunn. Undergr. Sp. Technol., 16, 247, 10.1016/S0886-7798(01)00051-7 Ingerslev, 2005, Considerations and strategies behind the design and construction requirements of the Istanbul Strait immersed tunnel, Tunn. Undergr. Sp. Technol., 20, 604, 10.1016/j.tust.2005.08.005 Lin, L.Y., 2013. Experimental investigation on the motion and dynamic response of tunnel element in the process of immersing. M.S. Thesis, Dalian University of Technology, Dalian, China, pp. 10–15 (in Chinese). Lunniss, 2013 Lv, 2014, Hydrodynamic experimental study on immersed tube tunnel element of Hong Kong–Zhuhai–Macao Bridge, China Civ. Eng. J., 47, 138 Luo, 2012, A temperature and stress simulation of immersed tunnel during precasting, Struct. Eng., 28, 46 Peng, S., Wu, W.G., Chen, K.Q., et al., 2012. Experimental investigation on element immersing process of immersed tube tunnel of Hong Kong-Zhu Hai-Macao Bridge. In: Proc. ASME 31st Int. Conf., pp. 1–7. Schmidt, 1979, Settlements of immersed tunnels, J. Geotech. Eng. Div., 105, 1031, 10.1061/AJGEB6.0000851 Shao, 2005, Analysis of immersed tunnel settlement, J. Zhejiang Transport. Sci. Technol., 2, 41 Su, 2013, Study on casting test of immersed tunnel segment in Hong Kong–Zhuhai–Macao Bridge, Construct. Technol., 42, 71 Taylor, 2005, Seismic retrofit of George Massey tunnel, Earthquake Eng. Struct. Dyn., 34, 19 Wu, 2014, Model test for hydrodynamic parameters of immersed tube tunnel in static water, Appl. Mech. Mater., 477–478, 754 Wei, 2014, Application of three-parameter model in settlement calculation of immersed tube tunnel, Appl. Mech. Mater., 470, 298, 10.4028/www.scientific.net/AMM.470.298 Zhang, 2007, Practice of observation for deformation of immersed tunnel of soft soil foundation, China Harbor Eng., 5, 17