Experimental and numerical study of precast posttensioned walls with yielding-based and friction-based energy dissipation

Engineering Structures - Tập 212 - Trang 110391 - 2020
Xinghua Li1, Yahya C. Kurama2, Gang Wu1
1Key Laboratory of Concrete and Prestressed Concrete Structures of the Ministry of Education, School of Civil Engineering, Southeast University, Nanjing 210096, China
2Department of Civil and Environmental Engineering and Earth Sciences, University of Notre Dame, IN 46556, USA

Tài liệu tham khảo

Kurama, 2018, Seismic-resistant precast concrete structures: state of the art, J Struct Eng, 144, 03118001, 10.1061/(ASCE)ST.1943-541X.0001972 Brunesi, 2019, Cyclic tensile testing of a three-way panel connection for precast wall-slab-wall structures, Struct Concrete, 20, 1307, 10.1002/suco.201800280 Brunesi, 2018, Cyclic testing of a full-scale two-storey reinforced precast concrete wall-slab-wall structure, Bull Earthq Eng, 16, 5309, 10.1007/s10518-018-0359-z Brunesi, 2018, Cyclic testing and analysis of a full-scale cast-in-place reinforced concrete wall-slab-wall structure, Bull Earthq Eng, 16, 4761, 10.1007/s10518-018-0374-0 Brunesi, 2017, Experimental and numerical investigation of the seismic response of precast wall connections, Bull Earthq Eng, 15, 5511, 10.1007/s10518-017-0166-y Soudki, 1995, Horizontal connections for precast concrete shear walls subjected to cyclic deformations. I: mild steel connections, PCI J, 40, 78, 10.15554/pcij.07011995.78.96 Chen, 2013, Test on seismic performance of precast shear wall with reinforcements grouted in holes and spliced indirectly in horizontal connections, J Harbin Inst Technol, 45, 83 Zhi, 2017, Quasi-static test and strut-and-tie modeling of precast concrete shear walls with grouted lap-spliced connections, Constr Build Mater, 150, 190, 10.1016/j.conbuildmat.2017.05.183 Seifi, 2016, Panel connection details in existing New Zealand precast concrete buildings, Bull N Z Soc Earthquake Eng, 49, 190, 10.5459/bnzsee.49.2.190-199 Seifi P, Henry RS, Ingham J. In-plane testing of precast concrete walls with grouted connections. In: 16th World Conf in Earthquake Engineering. Tokyo: International Association of Earthquake Engineering; 2017. ACI. Design recommendations for precast concrete structures. Farmington Hills, MI: ACI 550R-96; 2001. CAE. Guidelines for the use of structural precast concrete in buildings. Christchurch, New Zealand, 1999. ACI. Acceptance criteria for special unbonded post-tensioned precast structural walls based on validation testing and commentary. ACI ITG-5.1-07. Detroit; 2007. ACI. Requirements for design of a special unbonded post-tensioned precast shear wall satisfying ACI ITG-5.1 and commentary: ACI ITG 5.2-09. Farmington Hills, MI; 2009. Priestley, 1991, Overview of PRESSS research program, PCI J, 36, 50, 10.15554/pcij.07011991.50.57 Kurama, 2005, Seismic design of partially post-tensioned precast concrete walls, PCI J, 50, 100, 10.15554/pcij.07012005.100.125 Kurama, 1999, Lateral load behavior and seismic design of unbonded post-tensioned precast concrete walls, ACI Struct J, 96, 622 Holden, 2003, Seismic performance of precast reinforced and prestressed concrete walls, J Struct Eng, 129, 286, 10.1061/(ASCE)0733-9445(2003)129:3(286) Perez, 2007, Analytical and experimental lateral load behavior of unbonded posttensioned precast concrete walls, J Struct Eng, 133, 1531, 10.1061/(ASCE)0733-9445(2007)133:11(1531) Perez, 2013, Experimental lateral load response of unbonded post-tensioned precast concrete walls, ACI Struct J, 110, 1045 Belleri, 2014, Dynamic behavior of rocking and hybrid cantilever walls in a precast concrete building, ACI Struct J, 111, 661, 10.14359/51686778 Rahman, 2000 Restrepo, 2007, Seismic performance of self-centering structural walls incorporating energy dissipators, J Struct Eng, 133, 1560, 10.1061/(ASCE)0733-9445(2007)133:11(1560) Smith, 2015, Perforated hybrid precast shear walls for seismic regions, ACI Struct J, 112, 359, 10.14359/51687410 Smith, 2014, Seismic design guidelines for solid and perforated hybrid precast concrete shear walls, PCI J, Summer, 43, 10.15554/pcij.06012014.43.59 Gavridou, 2017, Shake-table test of a full-scale 4-story precast concrete building. I: overview and experimental results, J Struct Eng, 143, 04017034, 10.1061/(ASCE)ST.1943-541X.0001755 Marriott SP, Bull D, Palermo A. Dynamic testing of precast, post-tensioned rocking wall systems with alternative dissipating solutions. Bull N Z Soc Earthquake Eng 2008; 41(2): 90–103. ABAQUS, User’s Manual, Version 6.13, ABAQUS, Inc. Providence, RI; 2013. Cheng, 2007 Chen, 2015, Finite element modeling of debonding failures in FRP-strengthened RC beams: a dynamic approach, Comput Struct, 158, 167, 10.1016/j.compstruc.2015.05.023 Chen, 2011, Finite-element modeling of intermediate crack debonding in FRP-plated RC beams, J Composite Constr, 15, 339, 10.1061/(ASCE)CC.1943-5614.0000157 Li, 2018, Finite-element analysis and strength model for IC debonding in FRP-strengthened RC beams, J Composite Constr, 22, 04018030, 10.1061/(ASCE)CC.1943-5614.0000863 MOHURD. Technical Specification for Concrete Structures of Tall Building. JGJ 3-2010. Beijing: Ministry of Housing and Urban‐Rural Development of the People's Republic of China; 2010.