Importance of performance certification for post-installed anchors: An experimental assessment

Structures - Tập 29 - Trang 273-285 - 2021
Haidar Alhaidary1, Adil K. Al-Tamimi1
1Department of Civil Engineering, American University of Sharjah, United Arab Emirates

Tài liệu tham khảo

Cattaneo, 2019, Reliability of bonded anchors with different installation techniques: Experimental assessment, Asian J. Civ. Eng., 1, 3 Doppke, 2004, Concrete anchors, Am. Fasten. J., 21, 80 Mahrenholtz, 2015, Post-installed concrete anchors in nuclear power plants: Performance and qualification, Nucl. Eng. Des., 287, 48, 10.1016/j.nucengdes.2015.03.004 ACI Committee 355, “Qualification of Post-Installed Adhesive Anchors in Concrete and Comommentary,” 2011. ACI Committee 355, “Evaluating the Performance of Post-Installed Mechanical Anchors in Concrete,” 2002. EOTA, “ETAG 001-1:2013 Metal Anchors for Use in Concrete - Part 1: Anchors in General,” 2013. González, 2018, Influence of construction conditions on strength of post installed bonded anchors, Constr. Build. Mater., 165, 272, 10.1016/j.conbuildmat.2017.12.144 Hlavička, 2018, Concrete cone failure of bonded anchors in thermally damaged concrete, Constr. Build. Mater., 171, 588, 10.1016/j.conbuildmat.2018.03.148 Bajer, 2012, The glue-concrete interface of bonded anchors, Constr. Build. Mater., 34, 267, 10.1016/j.conbuildmat.2012.02.030 Kim, 2013, Performance evaluation of the post-installed anchor for sign structure in South Korea, Constr. Build. Mater., 44, 496, 10.1016/j.conbuildmat.2013.03.015 Eligehausen, 2006 Yilmaz, 2013, Tensile behavior of post-installed chemical anchors embedded to low strength concrete, Constr. Build. Mater., 47, 861, 10.1016/j.conbuildmat.2013.05.032 M. Mcvay, R. A. Cook, and K. Krishnamurthy3, “Pullout Simulation of Postinstalled Chemically Bonded Anchors,” J. Struct. Eng., vol. 122, no. 9, pp. 1016–1024, 1996. Bazant, 1984, Size Effect in Blunt Fracture: Concrete, Rock, Metal, J. Eng. Mech., 110, 518, 10.1061/(ASCE)0733-9399(1984)110:4(518) Çolak, 2001, Parametric study of factors affecting the pull-out strength of steel rods bonded into precast concrete panels, Int. J. Adhes. Adhes., 21, 487, 10.1016/S0143-7496(01)00028-8 Mayer, 1990, Funktionsersatzprüfung für die Beurteilung der Eignung von kraftkontrolliert spreizenden Dübeln (Function simulation tests for evaluation of suitability of torque-controlled expansion anchors), Universität Stuttgart Asmus, 2012 Kim, 2004, Sleeve-type expansion anchor behavior in cracked and uncracked concrete, Nucl. Eng. Des., 228, 273, 10.1016/j.nucengdes.2003.06.018 Eligehausen, 1995, Behavior of fasteners loaded in tension in cracked reinforced concrete, ACI Struct. J., 92, 365 Cook, 2001, Factors influencing bond strength of adhesive anchors, ACI Struct. J., 98, 76 S. Epackachi, O. Esmaili, S. R. Mirghaderi, and A. A. T. Behbahani, “Behavior of adhesive bonded anchors under tension and shear loads,” J. Constr. Steel Res., vol. 114, no. December 2018, pp. 269–280, 2015. Subramanian, 2002, Installation, behaviour and design of bonded anchors, Indian Concr. J., 76, 47 R. T. Morgan, “How Installation Torque Can Affect Expansion Anchors,” STRUCTURE magazine, pp. 8–11, Apr-2017. Eligehausen, 1991, Behavior, design and testing of anchors in cracked concrete, ACI Spec. Publ., no. SP, 130–5, 123