Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain
Tài liệu tham khảo
Akella, 1986, Optimal control of production rate in a failure prone manufacturing system, IEEE Transactions on Automatic Control, AC 31, 116, 10.1109/TAC.1986.1104206
Amezquita, T., Bras, B., 1996. Lean remanufacture of an automobile clutch. In: Proceedings of the First International Working Seminar on Reuse, Eindhoven, The Netherlands, p 6.
Bostel, 2005, The design, planning and optimization of reverse logistic networks, 171
Boukas, 1990, Manufacturing flow control and preventive maintenance: a stochastic control approach, IEEE Transactions on Automatic Control, 33, 1024, 10.1109/9.58530
Chung, 2008, Optimal policy for a closed-loop supply chain inventory system with remanufacturing, Mathematical and Computer Modelling, 6, 867, 10.1016/j.mcm.2007.11.014
Dobos, 2003, Optimal production–inventory strategies for a HMMS-type reverse logistics system, International Journal of Production Economics, 81–82, 351, 10.1016/S0925-5273(02)00277-3
De Brito, M.P., Dekker, R., Flapper, S.D.P., 2003. Reverse logistics—a review of case studies. ERIM Report Series Reference no. ERS-2003-012-LIS.
Dehayem, 2009, Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties, European Journal of Operational Research, 198, 173, 10.1016/j.ejor.2008.09.001
Dekker, R., Fleismann, M., Interfuth, K., Van Wassenhove L. (Eds.), Reverse Logistics. Quantitative models for closed-loops supply chains, 2004
Dong-Ping, 2009, Production and preventive maintenance control in a stochastic manufacturing system, International Journal of Production Economics, 19, 101
El-Sayed, M., Afia, N., El-Kharbotly, A., 2010. A stochastic model for forward–reverse logistics network design under risk. Computers & Industrial Engineering 58 (3), 423–431
Fleischmann, 1997, Quantitative models for reverse logistics: a review, European Journal of Operational Research, 103, 1, 10.1016/S0377-2217(97)00230-0
Gharbi, 2003, Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems, IIE Transactions, 35, 941, 10.1080/07408170309342346
Gharbi, 2008, Production rate control for stochastic remanufacturing systems, International Journal of Production Economics, 112, 37, 10.1016/j.ijpe.2006.08.015
Gershwin, 1994
Geyer, 2004, Supply loops and their constraints: the industrial ecology of recycling and reuse, California Management Review, 46, 55, 10.2307/41166210
Guide, 2006, Closed-loop supply chains, feature issue (Part 1), Production and Operations Management, 15, 10.1111/j.1937-5956.2006.tb00249.x
Guide, 2006, Closed-loop supply chains, feature issue (Part 2), Production and Operations Management, 15, 10.1111/j.1937-5956.2006.tb00156.x
Hajji, 2009, Joint replenishment and manufacturing activities control in two stages unreliable supply chain, International Journal of Production Research, 47, 3231, 10.1080/00207540701805612
Jorjani, 2004, Model for the allocation of electronics components to reuse options, International Journal of Production Research, 42, 1131, 10.1080/00207540310001632466
Kenné, 2003, Hierarchical control of production and maintenance rates in manufacturing systems, Journal of Quality in Maintenance Engineering, 9, 66, 10.1108/13552510310466927
Kenné, 2003, Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system, Mathematical and Computer Modelling, 38, 351, 10.1016/S0895-7177(03)90093-8
Kibum, 2006, Supply planning model for remanufacturing system in reverse logistics environment, Computers & Industrial Engineering, 51, 279, 10.1016/j.cie.2006.02.008
Kiesmuller, 2003, Computational issues in a stochastic finite horizon one product recovery inventory model, European Journal of Operational Research, 146, 553, 10.1016/S0377-2217(02)00249-7
Kushner, 1992
Lund, 1996
Ostlin, 2008, Importance of Closed-Loop Supply Chain Relationships for Product Remanufacturing, International Journal of Production Economics, 115, 336, 10.1016/j.ijpe.2008.02.020
Pellerin, R., Sadr, J., Gharbi, A., Malhamé, R., 2009. A production rate control policy for stochastic repair and remanufacturing systems. International Journal of Production Economics 121 (1), 39–48
Rishel, 1975, Dynamic programming and minimum principles for systems with jump Markov disturbances, SIAM Journal on Control, 13, 338, 10.1137/0313020
Rogers, D.S., Tibben-Lembke, R.S., 1998. Going backwards: reverse logistics trends and practices. Center for Logistics Management, University of Nevada, Reno, Reverse Logistics Executive Council.
Salema, 2007, An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty, European Journal of Operational Research, 179, 1063, 10.1016/j.ejor.2005.05.032
Seaver, W.B., 1994. Design considerations for remanufacturability, recyclability and reusability and reusability of user interface modules. In: Proceedings of the IEEE International Symposium on Electronics and the Environment, (IEEE-94), San Francisco, CA, USA, pp. 241–245.
Seierstad, 1987
Sundin, 2005, Making functional sales environmentally and economically beneficial through product remanufacturing, Journal of Cleaner Production, 13, 913, 10.1016/j.jclepro.2004.04.006
Thierry, 1995, Strategic issues in product recovery management, California Management Review, 37, 114, 10.2307/41165792
Verter, V., Boyaci, T. (Eds.), 2007. Special issue on Reverse Logistics, Computers and Operations Research, 34, 295–298.
